36C24419B0057-004.pdf
PDF Posted
- Attached to
- 693-CSI-306 Install CT/SPECT in Room 220
- Solicitation number
- 36C24419B0057
About this file
36C24419B0057 S02 ICRA Construction Pjt Compliance11IC-10-897.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419B0057-0002000.docx | DOCX document | |
| 36C24419B0057-0002000.docx | DOCX document | |
| 36C24419B0057-0001004.pdf | ||
| 36C24419B0057-0001002.pdf | ||
| 36C24419B0057-0001000.docx | DOCX document | |
| 36C24419B0057-0001003.pdf | ||
| 36C24419B0057-0001001.pdf | ||
| 36C24419B0057-0001003.pdf | ||
| 36C24419B0057-0001000.docx | DOCX document | |
| 36C24419B0057-0001001.pdf | ||
| 36C24419B0057-0001004.pdf | ||
| 36C24419B0057-0001002.pdf | ||
| 36C24419B0057-003.pdf | ||
| 36C24419B0057-002.pdf | ||
| 36C24419B0057-005.pdf | ||
| 36C24419B0057-001.docx | DOCX document | |
| 36C24419B0057-005.pdf | ||
| 36C24419B0057-004.pdf | ||
| 36C24419B0057-003.pdf | ||
| 36C24419B0057-002.pdf | ||
| 36C24419B0057-001.docx | DOCX document | |
| 36C24419B0057-000.docx | DOCX document | |
| 36C24419B0057-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs POLICY 11IC-10-897 Medical Center November 19, 2010 Wilkes-Barre, Pennsylvania 18711
INFECTION CONTROL CONSTRUCTION PROJECT COMPLIANCE
1. SCOPE/EFFECT: This Medical Center Policy affects all employees (including Allentown, Sayre, Tobyhanna, Williamsport, and Northampton County clinics), patients, and visitors to our medical center.
2. PURPOSE: This medical center establishes policy for maintaining a safe and healthy environment of care for patients, and a safe and healthy worksite for staff, volunteers, visitors, contractors, and the general public during construction, renovation, and maintenance related activities.
3. POLICY: It is the policy of this medical center that construction, renovation, and maintenance activities on VA owned property and VA-leased property be conducted in such a way to protect the health and safety of VA patients, employees, contracted staff and the public. It is the policy of this medical center to design projects that comply with VA Construction Standards, National Fire Protection Association Codes (NFPA), Guidelines for design and construction of hospitals and healthcare facilities, 2010 ed., published by the American Institute of Architects (AIA), and Guidelines for Environmental Infection Control in Healthcare Facilities, 2003. Compliance to codes and an Infection Control Risk Assessment shall be documented during design and construction phases.
a. A multidisciplinary team with representatives from the following program areas:
Infection Control, Patient Safety, Safety, VA Police, Engineering (Facilities Management), Engineering (Projects Management), Green Environmental Management System (GEMS), Emergency Planning Coordinator, Contracting. These team members provide input in design phase, review and sign construction plans prior to ELT signature.
b. An Infection Control Risk Assessment (ICRA)(Attachment A) will be required for every renovation and new construction project. The ICRA will be performed by a multidisciplinary team with expertise in infection control, facility design, construction, ventilation and safety.
The team will provide documentation of the risk assessment during initial planning and in subsequent construction phases. ICRA requirements are noted on the construction drawings and specification documents. For facility maintenance activities performed by FMS staff an ICRA will be completed in conjunction with Infection Prevention Coordinator.
(1) The type of Construction Activity, ATTACHMENT A, areas will be assessed for environmental risks for airborne and waterborne disease and measures to contain dust and moisture by appropriate barriers and other means. Adjacent patient care areas, supply storage and areas on levels above and below the proposed project will also be assessed for effects when appropriate.
(2) Based on the ICRA an Infection Control permit, ATTACHMENT B, will be issued for each project.
c. All construction workers, including subcontractors and Facility Management Service employees shall follow the Infection Control procedures as identified in the permit, ATTACHMENT B.
d. Infection Prevention Coordinator, Safety Officer, and the project Contracting Officer Technical Representative (COTR) will participate in meetings and area walk through inspections which will be conducted according to the risk assessment. Frequency of area walk through inspections will be conducted on the basis of risk category and will be assigned for each individual project. Refer to ATTACHMENT C.
e. Any employee responsible for purchasing equipment which will require installation is responsible for notifying Infection Prevention Coordinator who will assist with completion of Attachment A.
f. An Infection Prevention educational handout will be provided by project manager to the contract workers prior to the start of the project. ATTACHMENT D.
g. Education to FMS Maintenance Staff related to Infection Prevention Risk Assessment will be provided.
4. PROCEDURE:
a. The multidisciplinary team will ensure compliance with this policy and all applicable codes.
b. Planning Phases:
(1) Infection Prevention Coordinator will participate in preliminary design meetings and all planning phases for new construction project specific to the following major components:
(a) Number and placement of isolation rooms with anterooms as required
(b) Staff and patient traffic patterns
(c) Decisions regarding locations for patient care areas, storage and supply areas, etc.
(d) Water supply and plumbing to insure re-circulating lines
(e) Construction waste containment, transport and disposal
(f) Selection and installation of medical equipment as it relates to infection control
(g) Accommodation of personal protective equipment (accessibility, security, sanitation, etc.)
(h) Location of sinks and hand washing products dispensers and automatic devises for sinks, toilets
(i) Air handling systems engineered for optimal performance and easy maintenance and repair
(j) Air changes per hour and pressure differentials to accommodate special patient care areas
(k) Location of fixed sharps containers
(l) Types of surface finishes nonporous versus porous
(m) Appropriate location and type of ice machines
(n) Appropriate flooring (e.g., seamless floors in dialysis units)
(o) Sensible use of carpeting
(p) Properly engineered areas for linen services and solid waste management
(q) Convenient location of soiled utility rooms
(2) Environmental Control:
(a) Negative air pressure must be maintained within the construction area
(b) Demolition debris is removed in tightly fitted covered carts - use specified traffic patterns
(c) Sticky or walk-off mats are placed immediately outside the construction zone and changed whenever necessary to control the spread of dust and dirt
(d) Exterior- If demolition chutes are used, they must be sealed when not in use; the chute and damper should be sprayed with water, as necessary to maintain dust control
(f) Control, collection and disposal must be provided for any drain liquid or sludge found when demolishing plumbing
(3) Traffic Control:
(a) Use designated entry and exit procedures
(b) Keep all egress pathways free of debris
(c) No unauthorized personnel should be allowed to enter construction areas
(d) Use designated elevators only
(4) Cleaning:
(a) Keep the construction area clean on a daily basis
(b) Dust and dirt must be kept to a minimum
(5) Requirements for Construction Workers and FMS Maintenance Staff:
(a) Clothing must be free of loose soil and debris when exiting the construction area
(b) Use personal protective equipment (PPE) as indicated for the task at hand
(c) Hand washing is the best method of reducing the transmission of infection: Always wash your hands with soap and water after visiting the restroom, before eating, when leaving the construction site
(d) Construction workers will receive an educational handout for general infection control practices (Attachment D) and a card with construction safety and infection control requirements to be worn with company identification.
(6) Surveillance During Construction - the Infection Prevention Coordinator evaluates the protection of patients, visitors, and employees from injury and illness, as well as occupational and facility-associated infections through surveillance activities.
5. RESPONSIBILITY:
a. FMS Project Supervisor or designee will assure that all project COTRs, Infection Prevention Coordinator and the Safety officer are appraised of plans involving construction or renovation of clinical and administrative areas of the medical center.
b. FMS Project Supervisor or designee will notify the Infection Prevention Coordinator and Safety Officer by electronic email of planning meetings related to construction.
c. Maintenance Supervisor will notify the Infection Prevention Coordinator of maintenance activities.
d. Infection Prevention Coordinator will respond to requests and provide infection prevention and control related recommendations for project development and maintenance of areas during construction, renovation and maintenance projects.
e. The Safety Officer will respond to requests and provide safety and health related recommendations for project development and maintenance of areas during construction and renovation projects.
f. The multi-disciplinary team: Safety Officer, Infection Prevention Coordinator and Project Engineer, will complete the Infection Control Risk Assessment and the inspection check list and a copy will be maintained in the project document file and the Infection Prevention & Control office.
6. CUSTOMER SATISFACTION: Customer satisfaction issues were considered in developing this policy.
7. REFERENCES: APIC Infection Control Tool Kit Series: Construction and Renovation, available from the Association of Professional Infection Control Practitioners and Epidemiologists.
Guidelines for Design and Construction of Hospital and Health Care Facilities, Facility Guidelines Institute 2010 CDC's Guideline for Environmental Infection Control in Healthcare Facilities, 2003.
VHA Directive 2004-012 Safety and Health During Construction Activities, April 5, 2004.
Medical Center Policy 18S-09-346, Safety and Health During Construction Activities, October 19, 2009
8. RESCISSION: Medical Center Policy 111-08-897, Infection Control Construction Project Compliance, dated March 26, 2008.
9. DISTRIBUTION: Electronic access to all employees
10. ATTACHMENTS: A, B, C, D
POLICY 11IC-10-897 ATTACHMENT A
Infection Prevention Risk Assessment
Matrix of Precautions for Construction & Renovation
Step One:
Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and Non-Invasive Activities.
Includes, but is not limited to:
removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floor coverings, ceiling tiles and casework new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single workshift.
TYPE D
Major demolition and construction projects
Includes, but is not limited to:
activities which require consecutive work shifts requires heavy demolition or removal of a complete cabling system new construction.
Step 1_______________________________________________________________________
Step Two:
Using the following table, identify the Patient Risk Groups that will be affected.
If more than one risk group will be affected, select the higher risk group:
Low Risk Medium Risk High Risk Highest Risk
Office areas
Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory
Therapy
CCU
Emergency Room Labor & Delivery Laboratories
(specimen) Newborn Nursery Outpatient Surgery Pediatrics Pharmacy Post Anesthesia Care
Unit Surgical Units
Any area caring for immunocompromised patients
Burn Unit Cardiac Cath Lab Central Sterile Supply Intensive Care Units Medical Unit Negative pressure isolation rooms Oncology Operating rooms including C-section rooms
Step 2_____________________________________________________________
Step Three: Match the
Patient Risk Group (Low, Medium, High, Highest) with the planned … Construction Project Type (A, B, C, D) on the following matrix, to find the … Class of Precautions (I, II, III or IV) or level of infection control activities required.
Class I-IV or Color-Coded Precautions are delineated on the following page.
IC Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type Patient Risk Group TYPE A TYPE B TYPE C TYPE D
Risk Group LOW I II II III/IV
Risk Group MEDIUM I II III IV
Risk Group HIGH I II III/IV IV
Risk Group HIGHEST II III/IV III/IV IV Note: Infection Prevention approval will be required when the Construction Activity and Risk Level indicate that Class or III Class control procedures are necessary. IV
Step 3_____________________________________________________________
Description of Required Infection Prevention Precautions by Class During Construction Project Upon Completion of Project
C L
A
SS
I
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection
1. Clean work area upon completion of task.
C L
A
SS
I I
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
C L
A
SS
I
II
1. Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
C L
A
SS
I V
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
Step 4. Identify the areas surrounding the project area, assessing potential impact
Unit Below Unit Above Lateral Lateral Behind Front
Risk Group Risk Group Risk Group Risk Group Risk Group Risk Group
Step 5. Identify specific site of activity eg, patient rooms, medication room, etc.
Step 6. Identify issues related to: ventilation, plumbing, electrical in terms of the occurrence of probable outages.
Step 7. Identify containment measures, using prior assessment. What types of barriers? (Eg, solids wall barriers); Will HEPA filtration be required?
(Note: Renovation/construction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas)
Step 8. Consider potential risk of water damage. Is there a risk due to compromising structural integrity? (eg, wall, ceiling, roof)
Step 9. Work hours: Can or will the work be done during non-patient care hours?
Step 10. Do plans allow for adequate number of isolation/negative airflow rooms?
Step 11. Do the plans allow for the required number & type of handwashing sinks?
Step 12. Does the infection control staff agree with the minimum number of sinks for this project?
(Verify against AIA Guidelines for types and area)
Step 13. Does the infection control staff agree with the plans relative to clean and soiled utility rooms?
Step 14. Plan to discuss the following containment issues with the project team.
Eg, traffic flow, housekeeping, debris removal (how and when), Appendix: Identify and communicate the responsibility for project monitoring that includes infection control concerns and risks. The ICRA may be modified throughout the project. Revisions must be communicated to the Project Manager
POLICY 11IC-10-897 ATTACHMENT B
Infection Prevention Construction Permit Construction Class: Type: Risk Group:
I, II, III, IV A, B, C, D Low, Medium, High, Highest Project Name and Number: Permit #:
Location of Construction: Project start date:
Contractor Performing Work: Estimate completion date:
FMSS Project Engineer: Telephone:
Type A: Inspection and non-invasive activities, minimal dust levels Type B: Small scale, short duration moderate dust level Type C: Generates moderate to high levels of dust Type D: Major duration and construction activities requiring consecutive work shift
CLASS I 1. Work performed is limited to inspections and minor installations.
2. Execute work by methods to minimize raising dust from inspection operations.
3. Immediately replace ceiling tiles displaced for visual inspection. Only 3-5tiles may be removed at one time
4. Permit does not need to be posted for this classification.
CLASS II 1. Obtain and post infection control permit at work location before work begins.
2. Provide active means to prevent air borne dust from dispersing into atmosphere. 6 mil/fire resistant poly (plastic) barrier at entrance for short term work. Water mist work surfaces to control dust while cutting or use vacuum device.
3. Place dust mat at entrances and exits of work sites. Seal unused doors with tape.
4. Isolate HVAC and seal/cover air vents.
5. Contain construction waste before transport in tightly covered containers using assigned exit route.
6. Wipe surfaces with disinfectant. Wet mop and/or vacuum with HEPA filtered vacuum before leaving.
CLASS
III
1. Obtain and post infection control permit at work location before work begins.
2. Follow all requirements listed for Class II in addition to requirements listed below.
3. Isolate HVAC supply and return ductwork to prevent contamination of system.
4. Complete all critical dust barriers ( hard wall) as well as the creation of an anti-room where required for inspection by ICRA Inspection Team (Safety Officer, IC Nurse, Project Engineer) before work begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units. Change filters
6. Vacuum work area with HEPA filtered vacuums. Wet mop with disinfectant.
7. Obtain ICRA Inspection Team approval before construction and prior to removal of any dust partitions
8. Contain construction waste before transport in tightly closed containers using the assigned exit route.
CLASS
IV
1. Obtain and post infection control permit at work location before work begins
2. Follow all requirements listed for Class II & III in addition to requirements listed below
3. Isolate HVAC supply and return ductwork to prevent contamination of system.
4 Complete all critical dust barriers (hard wall barrier) as well as the creation of an anti-room where required.
All personnel entering and leaving work site must be vacuumed using a HEPA filtered vacuum cleaner or wear cloth or paper coveralls and shoe covers that are removed each time they leave the work site.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units. Change filters regularly. Seal holes, pipes, conduits and punctures appropriately.
6. Wet mop with disinfectant. Vacuum work area with HEPA filtered vacuums.
7. Contain construction waste before transport in tightly closed containers using the assigned exit route.
Additional Requirements:
Infection Prevention Coordinator: Date:
Safety Officer: Date:
FMS Project Engineer: Date:
POLICY 11IC-10-897 ATTACHMENT C
INFECTION PREVENTION CONSTRUCTION CHECKLIST
Location: _______________________________________________Date: _____________
Project COTR: ____________________________________________________________
Safety Representative: ______________________________________________________
Infection Prevention Coordinator: ____________________________________________
Contractor Performing Work: ________________________________________________
CONSTRUCTION ACTIVITY: YES NO
Type A: Inspection and non-invasive activities, minimal dust levels
Type B: Small scale, short duration moderate dust levels
Type C: Generates moderate to high levels of dust
Type D: Major duration and construction activities requiring consecutive work shift
INFECTION PREVENTION RISK GROUPS:
Low Risk: ____________________________
Medium Risk: ________________________
High Risk: ___________________________
Highest Risk: _________________________
POLICY 11IC-10-897 ATTACHMENT C
Date: ____________ Location: ________________ Class of Precautions: ___________
BARRIERS: YES NO
Construction signs posted for the area
- Construction site- DO NOT ENTER
- Emergency contact information
- Infection Control Instructions
Door properly closed and sealed Floor mats/dust tacks mats at entrance and changed Floor area clean, no dust tracked Barrier intact Door sweep Door closure device Door/tools locked when no one in area
AIR HANDLING
All windows closed behind barrier Negative air at barrier entrance Negative air machine running Hepa filter below 2 (above 2 filter change)
PROJECT AREA:
Debris removed in covered container daily Debris removed via designated exit route Trash in appropriate container Routine clearing done on job site If chute used, it is not adjacent to open windows or HVAC air intakes HVAC systems isolated, return ducts covered
TRAFFIC CONTROL:
Restricted to construction workers and necessary staff only All doors and exits free of debris ID badges worn and visible by construction workers
Comments:
Signatures:
Project COTR: _________________________________________________________________
Safety Representative: ___________________________________________________________
Infection Control: _______________________________________________________________
POLICY 11IC-10-897 ATTACHMENT D
During construction, renovation and minor improvement projects, hidden infectious disease hazards may be released into the air, carried on dust particles or on clothing – for example, fungal organisms such as Aspergillus. Aspergillus species may be found in decaying leaves and compost, plaster and drywall, and settled dust. These organisms usually do not cause problems in healthy people, but a hospital is full of sick patients! Aspergillus and other fungal organisms can cause illness and even death in transplant patients, cancer treatment patients, and patients with lung problems or poor immunity.
Therefore, it is critical that you do your part to keep our patients, employees, and visitors as safe and healthy as possible.
We, in turn, will make conditions as safe as possible for you.
1. Medical Waste:
a. We will remove any medical waste, including sharps containers (for used needles and syringes), from construction areas prior to the start of the projects.
b. If you (contract workers) find any needles, syringes, sharp medical objects, please notify Infection Control
IMMEDIATELY.
2. Barrier Walls:
a. The construction areas MUST be kept separated from patient care areas by barriers that keep the dust and dirt inside the worksite.
b. The walls must provide a complete seal of the construction area from adjacent areas (walls may be rigid or 4 or 6 mil thickness plastic).
3. Environmental Control:
a. Negative air pressure must be maintained within the construction area.
b. Demolition debris is removed in tightly fitted covered carts – use specified traffic patterns.
c. Sticky or walk-off mats are placed immediately outside the construction zone and changed whenever necessary to control the spread of dust and dirt.
d. Exterior window seals are to be used to reduce the amount of outside excavation debris coming into the building.
e. If demolition chutes are used, they must be sealed when not in use; the chute and damper should be sprayed with water, as necessary to maintain dust control.
f. Control, collection and disposal must be provided for any drain liquid or sludge found when demolishing plumbing.
4. Traffic Control
a. Use designated entry and exit procedures.
b. Keep all egress pathways free of debris.
c. No unauthorized personnel should be allowed to enter construction areas.
d. Use designated elevators only.
5. Cleaning
a. Keep the construction area clean on a DAILY basis.
b. Dust and dirt must be kept to a minimum.
6. Workers
a. Clothing must be free of loose soil and debris when exiting the construction area.
b. Use personal protective equipment (masks, face shields, etc.) as indicated for the task at hand.
c. Handwashing is the best method of reducing the transmission of infection: always wash your hands with soap and water after visiting the restroom, before eating, when leaving the construction site.
7. Accidents
a. For needlesticks or other sharps accidents and body fluid exposures; wash skin with soap and water and flush eyes/nose/mouth with large amounts of water.
b. Report the incident to your supervisor and report to the Safety and Health Manger for further treatment options.
Questions? Please feel free to call Infection Prevention at ext. 7979.
Infection Prevention – Construction Services