36C24419B0014-0002001.pdf
PDF 91 KB Posted
- Attached to
- Tree Management & Sidewalk Systems (Oval 1 #2) Project No. 542-14-104 Federal contract opportunity
- Solicitation number
- 36C24419B0014
About this file
36C24419B0014 0002 Revised Cost_Price Schedule 04252019.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0139-000.docx | DOCX document | |
| 36C24419B0014-0003000.docx | DOCX document | |
| 36C24419B0014-0002000.docx | DOCX document | |
| 36C24419B0014-0001000.docx | DOCX document | |
| 36C24419B0014-0001002.pdf | ||
| 36C24419B0014-0001004.pdf | ||
| 36C24419B0014-0001006.pdf | ||
| 36C24419B0014-0001005.pdf | ||
| 36C24419B0014-0001001.pdf | ||
| 36C24419B0014-0001003.pdf | ||
| Drawings_Tree_Management_and_Sidewalk_Systems.pdf | ||
| Tree_Management_Sidewalk_Specifications.pdf | ||
| 36C24419B0014-003.docx | DOCX document | |
| 36C24419B0014-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tree Management & Sidewalk System Solicitation No. 36C24419B0014 Revised Cost/Price Schedule, dated 04/25/2019
COST/PRICE SCHEDULE
**NOTE** Indicate the total price for deduct alternates without including the base price amount. Deducts alternates are listed in descending order of importance.
Bid Deducts which refer to tree removal shall reflect the cost broken down between removal, grubbing, disposal, backfill, and restoration PER TREE.
ITEM I, BASE BID: GENERAL CONSTRUCTION: Tree Management & Sidewalk
Systems: The Tree Management and Sidewalk Systems Project includes general construction, alterations, sidewalks, grading, drainage, smoking shelter, tree management, landscaping, site restoration, and any other work specified herein or shown on the drawings, specifications and the
Statement of Work. Completion time for the entire project shall be 180 calendar days. This includes a 45-day submittal period. Provide all submittals within 45 days.
LUMP SUM BASE BID: $ ____________________________________________________
Write bid amount in words
A. BID ITEM I: DEDUCT ALTERNATE #1: Deduct the Tree Removal (including grubbing, disposal, backfill, and restoration) – of 35 Trees as shown in drawing LD100
PER TREE: $_______________________
LUMP SUM DEDUCT ALTERNATE #1: $ ______________________________________
B. BID ITEM II: DEDUCT ALTERNATE #2: Remove 40 Additional Trees:
Deduct the Removal of 40 Additional Trees (including grubbing, disposal, backfill, and restoration) to include providing 40 new trees (10 shade and 30 flowering) of which the species was to be determined at commencement of planting as is noted in drawing LP001.
LUMP SUM DEDUCT ALTERNATE #2: $ _______________________________________
Tree Management & Sidewalk System Solicitation No. 36C24419B0014 Revised Cost/Price Schedule, dated 04/25/2019
C. BID ITEM III: DEDUCT ALTERNATE #3: Remove Basketball Goal Post:
Deduct the removal of the basketball goal post and the coordinated pavement markings
LUMP SUM DEDUCT ALTERNATE #3: $ _______________________________________
D. BID ITEM IV: DEDUCT ALTERNATE #4: Remove Smoking Shelter:
Deduct the removal of the existing smoking shelter.
LUMP SUM DEDUCT ALTERNATE #4: $ ________________________________________
E. BID ITEM V: DEDUCT ALTERNATE #5: Eliminate Outer Oval Tree Removal:
Deduct the removal (including grubbing, disposal, backfill, and restoration) of all the trees noted in the drawings OUTSIDE of oval one.
LUMP SUM DEDUCT ALTERNATE #5: $________________________________________
F. BID ITEM VI: DEDUCT ALTERNATE #6: Eliminate Ten (10) Tree Removals -
Courtyard:
Deduct the removal (including grubbing, disposal, backfill, and restoration) of ten trees within oval one courtyard as selected by the VA at the time of the project.
PER TREE: $______________________
LUMP SUM DEDUCT ALTERNATE #6: $ ________________________________________