About this file

36C24419B0014 0001 Amendment 0001 Revised Cost and Price Sheet.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Tree Management & Sidewalk Systems (Oval 1 #2) Project No. 542-14-104, newest first.
File Type Posted
36C24419C0139-000.docx DOCX document
36C24419B0014-0003000.docx DOCX document
36C24419B0014-0002001.pdf PDF
36C24419B0014-0002000.docx DOCX document
36C24419B0014-0001006.pdf PDF
36C24419B0014-0001005.pdf PDF
36C24419B0014-0001001.pdf PDF
36C24419B0014-0001003.pdf PDF
36C24419B0014-0001000.docx DOCX document
36C24419B0014-0001002.pdf PDF
Drawings_Tree_Management_and_Sidewalk_Systems.pdf PDF
Tree_Management_Sidewalk_Specifications.pdf PDF
36C24419B0014-003.docx DOCX document
36C24419B0014-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST/PRICE SCHEDULE

**NOTE** Indicate the total price for deduct alternates without including the base price amount. Deducts alternates are listed in descending order of importance.

A. ITEM I, BASE BID: GENERAL CONSTRUCTION: Tree Management &

Sidewalk Systems:

The Tree Management and Sidewalk Systems Project includes general construction, alterations, sidewalks, grading, drainage, smoking shelter, tree management, landscaping, site restoration, and any other work specified herein or shown on the drawings, specifications and the Statement of Work.

Completion time for the entire project shall be 180 calendar days. This includes a 45-day submittal period. Provide all submittals within 45 days.

LUMP SUM BASE BID: $ _____________________________

Write bid amount in words

B. BID ITEM II: DEDUCT ALTERNATE #1: Remove 40 Additional Trees:

Deduct the Removal of 40 Additional Trees (including grubbing, disposal, backfill, and restoration) to include providing 40 new trees (10 shade and 30 flowering) of which the species was to be determined at commencement of planting as is noted in drawing LP001.

LUMP SUM DEDUCT ALTERNATE #1: $ __________________________

C. BID ITEM III: DEDUCT ALTERNATE #2: Remove Basketball Goal Post:

Deduct the removal of the basketball goal post and the coordinated pavement markings.

LUMP SUM DEDUCT ALTERNATE #2: $ __________________________

D. BID ITEM IV: DEDUCT ALTERNATE #3: Remove Smoking Shelter:

Deduct the removal of the existing smoking shelter.

LUMP SUM DEDUCT ALTERNATE #3: $ __________________________

E. BID ITEM V: DEDUCT ALTERNATE #4: Eliminate Outer Oval Tree Removal:

Deduct the removal (including grubbing, disposal, backfill, and restoration) of all the trees noted in the drawings OUTSIDE of oval one.

LUMP SUM DEDUCT ALTERNATE #4: $ __________________________

F. BID ITEM VI: DEDUCT ALTERNATE #5: Eliminate Ten (10) Tree Removals -

Courtyard:

Deduct the removal (including grubbing, disposal, backfill, and restoration) of ten trees within oval one courtyard as selected by the VA at the time of the project.

LUMP SUM DEDUCT ALTERNATE #5: $ __________________________

G. BID ITEM VII: DEDUCT ALTERNATE #6: Unit Price Adjustment for Variation in Estimated Quantities:

Tree removal (including grubbing, backfill, and restoration). Provide cost per tree to be used for price adjustment.

UNIT COST PER TREE DEDUCT ALTERNATE #6: $________________