36C24419B0014-0001003.pdf
PDF 621 KB Posted
- Attached to
- Tree Management & Sidewalk Systems (Oval 1 #2) Project No. 542-14-104 Federal contract opportunity
- Solicitation number
- 36C24419B0014
About this file
36C24419B0014 0001 Amendment to SOW 04122019 TMSW.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0139-000.docx | DOCX document | |
| 36C24419B0014-0003000.docx | DOCX document | |
| 36C24419B0014-0002001.pdf | ||
| 36C24419B0014-0002000.docx | DOCX document | |
| 36C24419B0014-0001005.pdf | ||
| 36C24419B0014-0001001.pdf | ||
| 36C24419B0014-0001004.pdf | ||
| 36C24419B0014-0001006.pdf | ||
| 36C24419B0014-0001000.docx | DOCX document | |
| 36C24419B0014-0001002.pdf | ||
| Drawings_Tree_Management_and_Sidewalk_Systems.pdf | ||
| Tree_Management_Sidewalk_Specifications.pdf | ||
| 36C24419B0014-003.docx | DOCX document | |
| 36C24419B0014-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to Statement of Work, Tree Management and Sidewalk Repair
Per the existing drawings, a new concrete pad and new smoking shelter shall be placed at this location. Ensure shelter ties into NEW roof awning so as not to leak.
Supply and Install NEW awning as a continuation of the existing awning to be 8 feet wide by 28 feet long with appropriate aluminum materials including support legs, gutters, and downspouts and tie into NEW smoke shelter without leaking.
File details come from the government source that posted it.