Design Report new.pdf

PDF 15 MB Posted

Attached to
Y1DA--561A4-20-105| Lab Hood B-1 Federal contract opportunity
Solicitation number
36C24222B0036
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document outlines a federal contract opportunity for replacement of an existing fume hood and related HVAC equipment. The solicitation is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The contract aims to replace a fume hood and HVAC equipment in Building 1 of the VA NJ Health Care System located in Lyons, New Jersey. Key requirements include furnishing professional construction services, undergoing background checks and being issued identification badges, providing infectious control risk assessments and phasing plans, and completing the work within 240 days of the notice to proceed date. The estimated cost of the contract is $1,021,239.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--561A4-20-105| Lab Hood B-1, newest first.
File Type Posted
Responses to Requests for Information for Solicitation Install Lab Hood.docx DOCX document
6-28-22 - VA LYONS - REPOINTING SKETCHES- RFI Answers.pdf PDF
SKAS-110.1- RFI Answer.pdf PDF
SKMH-702.1 - RFI Answer.pdf PDF
36C24222B0036 0003.docx DOCX document
36C24222B0036 0002.docx DOCX document
36C24222B0036 0001.docx DOCX document
Specifications.pdf PDF
36C24222B0036_1.docx DOCX document
Drawings Part B.pdf PDF
Drawings Part A.pdf PDF
Design Report.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consulting Engineers In: NY, NJ, PA, CT, VT, MA, RI

BASIS OF DESIGN REPORT – 100% SUBMISSION

www.fellp.com

Prepared By:

Fellenzer Engineering, LLP

22 Mulberry Street, Suite 2A

Middletown, NY 10940

(845) 343-1481

19-083

Prepared For:

Department of Veterans Affairs

VA Lyons Medical Center

151 Knollcroft Road

Lyons, NJ 07939

Attn: Gary Boehner, COR

Lateisha Robinson, CO

December 3, 2021

F E

P ro je ct

N o -4

Replace/Install Lab Hood – Bldg. 1

Lyons Medical Center

VA Project No. 561A4-20-105

Table of Contents

I. List of Drawings

II. Executive Summary

III. Review of Existing Conditions

IV. Design Intent Narrative

A. Codes & Standards

B. Site Civil

C. Architectural

D. Structural

E. Mechanical

F. Electrical

G. Plumbing

H. Fire Protection

I. Energy Efficiency

J. Tie-In Points (Electrical, HVAC, Plumbing, Fire Protection, Etc.)

K. Asbestos/Hazardous Materials

V. Project Cost Estimate

VI. ICRA Form

VII. Asbestos Survey

I. List of Drawings

DRAWING # DRAWING TITLE

GI-001 COVER SHEET WITH INDEX OF DRAWINGS

GI-002 SAFETY AND GENERAL INFORMATION

GI-003 SCAFFOLDING DETAILS & NOTES

GI-004 ICRA PLAN

HA-101 ASBESTOS: GROUND FLOOR PLAN

HA-102 ASBESTOS ABATEMENT DIAGRAMS AND NOTES

AS-001 EGRESS AND LIFE SAFETY PLAN – ARCHITECTURAL

AS-020 TYPICAL BARRIER FREE STANDARDS

AS-021 TYPICAL MOUNTING HEIGHTS & DETAILS

AS-030 PARTITION TYPE AND DETAILS

AS-032 STANDARD UL RATED ASSEMBLIES

AS-110 DEMOLTION AND NEW CONSTRUCTION FLOOR PLAN

AS-201 REFLECTED CEILING PLAN AND FINISH PLAN

AS-910 MILLWORK ELEVATIONS AND DETAILS

MH-001 HVAC: SYMBOLS, ABBREVATIONS & NOTES

MD-101 HVAC: GROUND FLOOR DEMOLITON PLAN

MH-100 HVAC: BASEMENT FLOOR HYDRONIC PLAN

MH-101 HVAC: GROUND FLOOR HYRDONIC PLAN

MH-102 HVAC: GROUND FLOOR PLAN

MH-201 HVAC: ROOF PLAN

MH-401 HVAC: SEUQENCE OF OPERATIONS, POINTS LIST, &

CONTROLS SCHEMATICS

MH-701 HVAC: DETAILS

MH-702 HVAC: DETAILS

MH-801 HVAC: SCHEDULES

PL-001 PLUMBING: SYMBOLS, ABBREVIATIONS & NOTES

PD-100 PLUMBING: BASEMENT FLOOR SANITARY/DOMESTIC DEMOLITION PLAN

PD-101 PLUMBING: GROUND FLOOR SANITARY/DOMESTIC DEMOLITION PLAN

PL-100 PLUMBING: BASEMENT FLOOR SANITARY/DOMESTIC PLAN

PL-101 PLUMBING: GROUND FLOOR SANTIARY/DOMESTIC PLAN

PL-701 PLUMBING: DETAILS

FX-001 FIRE PROTECTION: SYMBOLS, ABBREVIATIONS & NOTES

FX-201 FIRE PROTECTION: GROUND FLOOR PLAN

ES-001 ELECTRICAL: SYBMOLS, ABBREVIATIONS & NOTES

ED-101 ELECTRICAL: GROUND FLOOR POWER DEMOLTION PLAN

ED-201 ELECTRICAL: GROUND FLOOR LIGHTING DEMOLTION PLAN

ES-101 ELECTRICAL: GROUND FLOOR POWER PLAN

ES-201 ELECTRICAL: GROUND FLOOR LIGHTING PLAN

ES-701 ELECTRICAL: DETAILS

ES-702 ELECTRICAL: DETAILS

ES-801 ELECTRICAL: SCHEDULES

II. Executive Summary

This project proposes the renovation of a 1,250 +/- square foot (sf) existing chemistry lab on the ground floor of building 1 at the VA Lyons campus. The purpose of the is project is to a provide a reconstructed laboratory for clinical research. This will be done by providing complete design services for the items stated above.

Building 1 is situated on the facilities’ main campus and is connected to building 3.

Domestic water, sanitary, HVAC and electricals service to this area will be provided by the VA.

This report includes design plans for Architectural, Fire Protection, HVAC, Plumbing and Electrical systems.

III. Review of Existing Conditions

The existing chemistry lab, located on the ground floor building 1, has been around since the building was originally constructed and has undergone several renovations throughout the years. The lab is currently vacant and sits adjacent to the blood lab and police barracks. It is comprised of several lab benches and general office furniture that is no longer being used.

Figure 1. Lab Southeast Corner

Figure 2. Lab Northeast Corner

Figure 3. Lab Northeast Corner Close Up

Figure 4. Lab Northwest Corner and Existing Eyewash Station (Bottom Left)

Figure 5. Lab Northwest Corner Continued

Figure 6. Lab Southwest Corner

Existing HVAC systems include several thru the wall A/C units and an 8.5-Ton packaged Carrier unit.

As seen in figure 7 below the Carrier system has been decommissioned for some time and will be completely demolished as part of this project.

Figure 7. Existing Condensing Units (Left) and Decommissioned Carrier Unit (Right)

Figure 8. Typical Thru the Wall A/C Unit

Existing sanitary and domestic service is provided from the basement below the clinic as seen in figures

9-10.

Figure 9. Basement Domestic and Sanitary Piping Distribution

Figure 10. Basement Domestic and Sanitary Piping Distribution Continued

The existing electrical service for the chemistry lab comes from 5 existing power panels located in the adjacent blood lab and from the main switchgear in the basement (Room 013 switchboard) below.

Existing service is either 208/120V/1P/3W or 208/120V/3P/4W. The fire alarm system that serves this area was updated during a campus wide renovation in 2008. As of today, the VA as reported no problems with the existing fire protection system. The existing fire alarm control panel is located in the main switchgear room (Room 013 switchboard) as seen in figure 11 below.

Figure 11. Existing Fire Alarm Control Panel (Red Box Second from the Left)

IV. Design Intent Narrative

A. Codes & Standards

• VA Directives, Design Manuals, Master Specifications, VA National CAD Standard

Application Guide, and other Guidance on the Technical Information Library (TIL)

• NFPA (National Fire Protection Association)

• NEC (National Electric Code)

• ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers)

• AHRI (Air-Conditioning, Heating and Refrigeration Institute)

• OSHA (Occupational, Safety and Health Administration)

B. Site Civil

There is minor site work for this project. The extent of proposed work will include restoring the site to its original condition once construction is complete, and pouring a new concrete equipment pad for new compressor/condenser unit ACCU-1.

C. Architectural

There are several architectural items that will be addressed during this project. Work will include but is not limited to; installing new partition walls to create a small mechanical room, providing new wall finishes throughout, performing any subfloor restoration, installing new LVT flooring, installing new ceiling tiles using the existing ceiling grid, selecting and locating new lab furniture/equipment, and providing new window panes where A/C units are located.

D. Structural

There is minor structural work associated with this project. The extent of work includes infilling openings in the exterior wall, creating new openings in the exterior wall, and repairing lintels where windows are being worked on.

E. Mechanical

Due to the scope of this project, the HVAC design plan will encompass several new systems in order to meet the latest VA design standards. For demolition, all existing systems and their associated appurtenances (ductwork, controls, etc.) will be removed completely. These systems will then be replaced by a new 100% outside air (OA) variable air volume (VAV) air handling unit (AHU), and a new rooftop exhaust fan. Listed below is a breakdown of each respective system with its corresponding tag from the drawings:

1) 100% Outside Air Variable Air Volume Air Handling Unit (AHU-LAB-1)

To maintain a proper comfort level within the lab, the design plan is to provide a 1,900

CFM 100% OA VAV AHU. The system will utilize a direct expansion (D/X) coil for cooling control, a hot water/glycol coil for heating control, a single steam dispersion tube for humidification control, and a fixed membrane heat exchanger for energy recovery.

The system will be located outside just plan east of the lab, and will come in a stacked orientation (supply air on top and exhaust on the bottom). To circulate the air, each air stream comes with a centrifugal plenum fan that is controlled through a variable frequency drive (VFD). The system will also work in conjunction with the fume hood

(FH-1) to maintain a negative air balance in the room.

2) Exhaust Fan with Plume Hood (PEF-1)

As part of this project, a new laboratory fume hood will be installed. To exhaust air out of this hood the plan is to provide a new roof mounted constant volume (CV) exhaust fan with a plume stack. The system will exhaust anywhere from 100 CFM to 425 CFM based on the hood sash position. This fan will work in conjunction with the hood (FH-1) to maintain a constant face velocity at the work area.

To maintain compliance with VA standards, both systems will be integrated into the existing

BMS via a Lon works protocol communication.

F. Electrical

For power distribution the design plan is provide a new panelboard, 1LP-G-CHE, that is to be located in the newly constructed mechanical room. This panel will be feed from an existing spare breaker in the basement switchgear, and will service all new equipment and receptacles being installed as part of this project. Any receptacles that are existing to remain, will stay on their existing circuits.

For lighting, the proposed design plan is to provide new LED lights with occupancy sensors throughout. All new lighting will be powered from the existing lighting circuit. Additionally, users in the main lab will have the ability to dim the lighting.

G. Plumbing

This project will require minor plumbing alterations. Work will include demolishing old fixtures

(sinks, eyewash station, etc.) and piping, installing new plumbing fixtures, and providing new domestic, sanitary and vent piping. All domestic service will be brought up from the basement as seen in figures 9 and 10 above.

H. Fire Protection

The design plan for the fire protection systems can be broken down into two parts. The first area of concern being the fire alarm system and the second being the sprinkler system. As mentioned previously, the current fire alarm system was updated as part of a campus wide renovation in

2008. For this reason, the design plan is to leave all existing devices and to relocate or add new ones that may be required to maintain 100% coverage of the space. The existing fire alarm control panel is located in the basement of building 1 in room 013 Switchboard (as seen in figure

11 above), and will be existing to remain with additions as needed to meet current life safety requirements. For the sprinkler system the proposed plan is to leave the layout as is, and to relocate or add heads as needed to maintain 100% coverage. See FX (Fire Protection) and ES

(Electrical) series drawings for more information.

I. Energy Efficiency

All new pieces of equipment have been selected to meet the latest ASHRAE and AHRI requirements for energy efficiency

J. Tie-In Points (Electrical, HVAC, Plumbing, Fire Protection, Etc.)

All tie in points will be reviewed by the VA FMS staff.

K. Asbestos/Hazardous Materials

Due to the age of this building, it was suspected that asbestos containing material (ACM) could be present and after further testing this was confirmed true. Therefore, this project will involve traditional asbestos removal. For more information see the asbestos series drawings (HA) and section 8 below (VII. Asbestos Survey) which contains the asbestos survey performed for this area.

VII. Asbestos Survey

100% Estimates.pdf
(#1) Cover
(#2) Arch
(#2.5) Asbestos Cost Estimate
(#3) HVAC
(#4) Plumbing
(#5) Electrical

File details come from the government source that posted it. Updated .