2021 Boiler Plant Upgrades SOW-r1.docx

DOCX document 357 KB Posted

Attached to
Z1DA--528A6-20-609 BOILER PLANT UPGRADES |
Solicitation number
36C24221B0071
Issued by

About this file

This document outlines a scope of work and related federal contract opportunity for boiler plant upgrades at the Bath, New York Veteran's Administration Medical Center. The project consists of two tasks, with contractors providing lump sum bids for each task and the contract being awarded to the contractor with the lowest total bid. Task 1 involves replacing the water filtration tank and associated equipment. Task 2 requires removing and replacing four digital loop controllers with new controllers meeting specified capabilities. The solicitation will be posted on October 4th for this small business set-aside contract between $100,000-$250,000, requiring a 20% bid bond. The work must be completed within 120 days of award.

View the file

Other files

File Type Posted
S06 Yardney Filter DAta Sheet.pdf PDF
S06 Yardney Filter Tanks.jpg JPG image
36C24221B0071 0004.docx DOCX document
36C24221B0071 0003.docx DOCX document
P07 Wage Determination.docx DOCX document
36C24221B0071 0002.docx DOCX document
S06 Certification of Vaccination.pdf PDF
S06 05779335 082621 003 CAO Memorandum - Attestation Guidance for Health and Safety Precautions for COVID-19 - Aug 25 2021 (1).pdf PDF
36C24221B0071 0001.docx DOCX document
36C24221B0071_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO. 528A6-20-609

PROVIDE BOILER PLANT UPGRADES

VAMC BATH, NY 08/01/21

Scope of Work Boiler Plant Upgrades 528A6-20-609

The Bath, NY Veteran’s Administration Facility seeks to make improvements and upgrades to some of its equipment at its boiler and water plants. The project will consist of two (2) separate tasks. Contractor is to provide a lump sum bid for each task. Contract will be awarded to the contractor whose sum of both tasks is the lowest. Upon award of contract, Contractor is to issue a submittal for each of the components in the assigned tasks. All work to be completed within 120 days of contract award. In addition, the Contractor shall provide all labor, materials, supplies, equipment, tools, and supervision necessary to complete the tasks described below:

TASK 1 – Replace Water Filtration tank and Appurtenances Basis for design for the water filtration tanks are Yardney Multi-Media Filter System, Model #MM5460-3A, serial #39516 or approved equal. Perform the following tasks:

1. Disconnect all piping suppling filtration tanks

2. Remove insulation

3. Remove filter media

4. Dispose of filter media

5. Re-bed the tank in the following manner:

6. Install new filter media in each media tank with the following media and quantities:

a. Bottom layer - 5/8” x 3/8” gravel underbedding – 38, 80# bags

b. Next layer – 1.45 mm garnet – 70, 50# bags

c. Next layer - .035 mm Garnet – 180, 50# bags

d. Top layer – 0.8-0.9 mm anthracite – 72, 50# bag Note: SDS sheets and documentation stating that filter media meets AWWA and NSF potable water standards must be provided to Water Plant Supervisor for NYSDOH review and approval. No work can be done until approval by NYSDOH is given.

7. Re-insulate tank

8. Back flush system

9. Start up and ensure proper operation of system The specifications of the tanks are:

A. Normal flow range: 240-716 GPM B. Peak flow rate: 954 GPM C. Tank Diameter and Side Shell: 54”x60” D. Total filtration area: 47.73 Cu Ft E. Multi-media area: 196.5 Cu Ft F. Backwash GPM: 239 GPM

TASK 2 – Replacing the Existing Digital Loop Controllers Remove four (4) of the existing digital loop controllers and replace in kind with new, state of the art digital controllers which shall include testing and calibration. Re-wire as necessary. Basis of design is the PCC IV manufactured by Preferred Utilities Manufacturing Corporation. At a minimum, each unit shall have the following features and capabilities:

1. Dual modbus ethernet ports

2. Color touchscreen

3. USB programming port

4. Large blockware memory

5. Modern dual core processor w/ large memory

6. SD card capability image3.jpg image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .