36C24118R0127-00002001.pdf
PDF 6 MB Posted
- Attached to
- MATOC CAT I-III All Locations Federal contract opportunity
- Solicitation number
- 36C24118R0127
About this file
36C24118R0127 00002 TP09 523A4-12-211 Exhibit F-1 4-24-18.pdf
View the file
Other files for this federal contract opportunity
Show all 50
MATOC CAT I-III All Locations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT F-1 SEED PROJECT
NOTICE OF PROPOSED PROJECT, PROPOSAL FORM
Date:
PROJECT TITLE AND NO.: Project 523-12-211, SPD Exhaust PACU HVAC, West Roxbury, MA
PROJECT DESCRIPTION: The Contractor shall provide all labor, materials, equipment, transportation, disposal and supervision necessary to replace the existing PACU air handling unit.
CAT I $2,000 - $1,000,000
MAGNITUDE OF PROJECT: Between $500,000 and $1,000,000
PERFORMANCE PERIOD: 365 Calendar Days
SITE VISIT: A site visit for this project will be conducted on 5/22/18 at 11am.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $35,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
WAGE DETERMINATION: Currently, General Decision Number: MA180001 Modification No 2 dated 04/06/2018 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors shall immediately notify the Contracting Officer’s Representative (COR) and shall prepare a Report of Accident (VA Form 2162 or equivalent) in quadruplicate and forward the original and two copies to the Contracting Officer or COR for forwarding to Safety Officer.
PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
Item Number
Description Lump Sum Amount
0001 GENERAL CONSTRUCTION: Work includes the necessary supervision, labor, equipment, material, transportation, testing and infrastructure required for the contractor to replace the existing PACU air handling unit at the West Roxbury Veterans Affairs Medical Center, MA, in accordance with the Contract Documents, including Technical Specifications and Drawings. Work includes, but is not limited to, The work includes the removal of an existing PACU air handling unit and installation of a new PACU air handling unit including all services to the unit such as steam, heating and cooling water, electricity and communications. demolition, general construction, alterations, structural steel, roofing, electrical work and mechanical work for the removal of the existing PACU HVAC unit and the installation of a new PACU HVAC unit on the third floor roof of Building 1,section B, VAMC West Roxbury, MA. A general description of the work is as follows:
1. The PACU unit is in use between the hours of 6:00 AM and 6:00 PM Monday thru
Friday and will remain in operation during construction.
2. Provide temporary heating and cooling as required to maintain PACU use.
3. Provide a crane for removal of demolished equipment and installation of new equipment.
4. Remove the existing exterior roof mounted HVAC unit as well as related ductwork, piping and direct expansion condenser. Remove related steam heating and humidification systems. Remove related electrical services. Disconnect existing fire alarm devices.
5. Provide a new roof top mounted PACU HVAC unit at the same location as the original unit and reuse existing structural supports. Provide new structural steel as required to support new equipment from existing supports.
6. Provide new heating and cooling heat exchangers as well as related piping, connections and pumps. Provide new duct work and insulation.
7. Provide new unit controls and interface to existing Trane Tracer building automation system (BAS). Update BAS graphics to show new equipment and all related
523A4-12-211 W. Roxbury SPD Exhaust Seed Project input/output.
8. Provide new clean steam humidification system.
9. Provide new electrical services for new HVAC equipment. Reconnect existing fire alarm devices.
10. Provide a complete air balance of the HVAC unit and the existing PACU HVAC system.
0002 ALTERNATE NO. 1: This alternate shall be to the BASE ITEM offer. The alternate includes all work required to accomplish the following general description:
1. Remove six duct cross connections and related dampers as shown on the drawings.
Remove and replace existing ceilings as required by the work.
0003 ALTERNATE NO. 2: This alternate shall be to the BASE ITEM offer. The alternate includes all work required to accomplish the following general description:
1. Replace existing reheat coil valves with new valves for six existing constant volume terminal units located above the ceiling in the PACU space.
2. Provide new duct temperature and space temperature sensors for the units.
3. Integrate the new sensors and controllers into the existing Trane Tracer BAS system.
Provide graphics for new components and show integration with new HVAC unit.
4. Rebalance reheat coils in the PACU space.
0004 ALTERNATE NO. 3: This alternate shall be to the BASE ITEM offer. The alternate includes all work required to accomplish the following general description:
1. Replace the existing exterior PACU isolation room exhaust fan with a new unit with variable speed drive.
2. Provide a new exterior filter housing package.
3. Integrate the new exhaust fan drive and the filter housing sensors and controllers into the existing Trane Tracer BAS system. Provide graphics for new components and show integration with new HVAC unit.
0005 Asbestos Sample Unit Price: This UNIT PRICE shall be the cost to sample and analyze a single location for asbestos containing materials including protective equipment, enclosures and testing: assume two (2) samples at each location per day. If more than one location is sampled in one day or if more than two samples are required, the cost of work shall be negotiated to recognize economy of scale and reduced costs for performing more than one unit per day.
0006 Asbestos Abatement Unit Price: This UNIT PRICE shall be the cost to remove less than three (3) square feet of asbestos containing material utilizing the OSHA glove bag method.
Provide $/SF cost including all equipment, materials, labor and disposal of material. If more than one location is abated in one day, the cost of work shall be negotiated to recognize economy of scale and reduced costs for performing more than one unit per day.
INCLUDE A DETAILED PRICE BREAKDOWN ATTACHED TO THIS PROPOSAL.
SIGNATURE: COMPANY NAME
Name and title of person authorized to sign Offer Date
EXHIBIT F – 1A - CALCULATION OF SELF-PERFORMED WORK
PROJECT: Project 523-12-211, PACU Air Handling Unit, West Roxbury, MA VISN 1
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.) NOTE: The intention of this set-aside is to have actual work performed by the Contractor’s own forces or the forces of other SDVOSB contractors and not just “contract management”. This contract is not intended for construction contract management firms.
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $___
B.2 If applying for consideration as a General Contractor (multi-discipline projects) subtract Specialty Trades (Unless being self performed) $ ______
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees;
and the contractor’s own job overhead costs.)
B.6 25 % Self-performed Work = Line B.5 / B.4 X 100% = %
Statement Of Work Construction
1. OVERVIEW
1.1 Government Agency Department and Address:
VA Boston HealthCare System – VISN1 – West Roxbury Campus
1.2 Project Title, Number and Location:
Project Title: SPD Exaust PACU HVAC Project Number: 523A4-12-211
2. DESCRIPTION OF WORK
2.1 General: Provide all labor, materials, equipment, transportation, supervision and disposal necessary for Project 523A4-12-211 SPD Exhaust PACU HVAC at the VA Boston HealthCare System, West Roxbury, MA Campus in accordance with the Statement of Work, Technical Specifications and Drawings.
PACU Air Handling Unit The existing PACU air handling unit (AHU), installed in 2003, is configured for Direct Expansion (DX) cooling and plant steam heating and humidification. This unit provides dedicated air handling for the PACU.
Due to high operational and maintenance costs and deviations from the current VA energy conservation initiatives and ASHRAE 90.1-2007, the existing unit is being replaced. The new unit shall have the same airflow and cooling/heating capacity, but shall include the following modifications to address the issues of cost and energy of the current system:
Direct drive fans to eliminate belts in the unit.
Glycol hot water coil and piping loop served by a shell and tube heat exchanger in Mechanical Room 3B-109 which utilizes plant steam to heat the glycol loop.
Glycol chilled water coil and piping loop served by a plate and frame heat exchanger in Mechanical Room 3B-109 which utilizes plant chilled water to cool the glycol loop.
A clean steam generator located inside the conditioned building.
Auxiliary connections to plant chilled water for emergency operation which bypass the heat exchange and pumps to directly connect the unit chilled water coil to the plant chilled water.
Variable frequency drives (VFDs) for supply and return fans.
Airflow measuring stations integrated with the existing Building Automation System.
Economizer controls and night/weekend setback scheduling.
Isolation Room Exhaust Fan (Alternate) The existing PACU Isolation Room exhaust fan runs at constant speed with no ability to adjust air flow.
The existing configuration has limited value when air balancing adjustments are required to maintain current VA HVAC criteria.
This design alternate provides for:
New exhaust fan with variable frequency drive (VFD).
New filter housing package.
Exhaust system monitoring integrated with the existing Building Automation System.
PACU Temperature Control (Alternate) It has been noted by the VA that temperatures within the PACU area can create uncomfortable conditions for patients. To address this, we have provided a design alternate controls upgrade for the space consisting of the following:
New constant volume terminal unit reheat coil valves and controllers.
New electronic space temperature sensors.
New electronic duct temperature sensors.
Rebalancing of reheat coils in the PACU space.
Integration of new sensors and controllers into the existing Building Automation System.
WAGE RATES
General Decision Number: MA180001 04/06/2018 MA1 Superseded General Decision Number: MA20170001 State: Massachusetts Construction Type: Building Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis- Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 02/16/2018 4 02/23/2018 5 03/09/2018 6 03/23/2018 7 03/30/2018 8 04/06/2018
ASBE0006-001 09/01/2017
Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
(ZONE A)...................$ 46.09 27.50
(ZONE B)...................$ 41.48 27.50
ZONES:
ZONE A
BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)
ZONE B
BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)
ASBE0006-002 06/01/2017
BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 34.45 19.40
ASBE0006-010 09/01/2017
BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET;
NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham) Rates Fringes Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 41.48 27.50
BOIL0029-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 42.42 24.92
BRMA0001-008 03/01/2018
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES Rates Fringes Bricklayer, Cement Mason, Plasterer........................$ 49.96 32.19
BRMA0001-009 03/01/2018
LOWELL CHAPTER
MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington) Rates Fringes Bricklayer and plasterer.........$ 49.96 32.19
BRMA0001-010 03/01/2018
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis) Rates Fringes
BRICKLAYER.......................$ 49.96 32.19
BRMA0003-001 02/01/2018
Rates Fringes Marble & Tile Finisher...........$ 39.82 30.89 Marble, Tile & Terrazzo
Workers..........................$ 52.10 32.92
TERRAZZO FINISHER................$ 51.00 32.76
BRMA0003-003 02/01/2018
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton);
and SUFFOLK Rates Fringes
BRICKLAYER.......................$ 52.06 32.97
BRMA0003-006 02/01/2018
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury); and MIDDLESEX (Reading, North Reading, Wakefield) Rates Fringes Bricklayer, cement mason and plasterer........................$ 52.06 32.97
BRMA0003-007 02/01/2018
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn) Rates Fringes Bricklayer and plasterer.........$ 52.06 32.97
BRMA0003-008 02/01/2018
NEWTON CHAPTER
MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) Rates Fringes Bricklayer, cement mason and plasterer........................$ 52.06 32.97
BRMA0003-009 02/01/2018
NEW BEDFORD
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and NANTUCKET COUNTIES Rates Fringes Bricklayer, cement mason and plasterer........................$ 52.06 32.97
BRMA0003-010 02/01/2018
QUINCY CHAPTER
NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) Rates Fringes Bricklayer, cement mason and plasterer........................$ 52.06 32.97
CARP0026-001 09/01/2017
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham) Rates Fringes
CARPENTER........................$ 39.28 27.90
CARP0033-001 09/01/2017
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton);
and SUFFOLK Rates Fringes
CARPENTER........................$ 46.43 28.35
CARP0056-011 08/01/2015
SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of DUKES AND NANTUCKET
COUNTIES
Rates Fringes
PILEDRIVERMAN....................$ 42.04 29.73
CARP0056-012 08/01/2015
The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal Rates Fringes
PILEDRIVERMAN....................$ 42.04 29.73
CARP0056-013 08/01/2015
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495) Rates Fringes
PILEDRIVERMAN....................$ 42.04 29.73
CARP0424-003 09/01/2017
NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy) Rates Fringes
CARPENTER........................$ 39.28 27.90
CARP0624-005 09/01/2017
DUKES; NANTUCKET
Rates Fringes
CARPENTER........................$ 46.43 28.35
CARP0624-007 09/01/2017
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES Rates Fringes
CARPENTER........................$ 39.28 27.90
CARP1121-001 10/01/2017
Rates Fringes
MILLWRIGHT.......................$ 39.52 30.85
CARP2168-001 03/01/2018
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton);
and SUFFOLK Rates Fringes FLOOR LAYER: Carpet.............$ 44.50 28.82
CARP2168-004 03/01/2018
BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County Rates Fringes FLOOR LAYER: Carpet.............$ 42.39 28.82
CARP2168-005 03/01/2018
BARNSTABALE; DUKES; AND NANTUCKET
Rates Fringes FLOOR LAYER: Carpet.............$ 42.39 28.82
ELEC0096-001 12/01/2017
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend) Rates Fringes
ELECTRICIAN......................$ 42.32 11%+20.06
Teledata System Installer........$ 29.04 23.04
ELEC0099-001 06/01/2017
BRISTOL (Attleboro, North Attleboro, Seekonk) Rates Fringes
ELECTRICIAN......................$ 38.08 57.24%
Teledata System Installer........$ 28.56 13.1%+13.76
* ELEC0103-001 03/01/2018
ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK Rates Fringes Teledata System Installer........$ 37.61 29.49
* ELEC0103-002 03/01/2018
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington) Rates Fringes
ELECTRICIAN......................$ 50.15 31.60
* ELEC0103-004 03/01/2018
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham) Rates Fringes
ELECTRICIAN......................$ 50.15 31.60
* ELEC0103-005 03/01/2018
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK Rates Fringes
ELECTRICIAN......................$ 50.15 31.60
ELEC0104-001 09/03/2017
Rates Fringes Line Construction:
Cableman....................$ 38.45 18.42+A Equipment Operator..........$ 38.45 22.50+A Groundman...................$ 24.88 10.24+A Lineman.....................$ 45.23 25.71+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
ELEC0223-005 03/01/2018
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton) Rates Fringes
ELECTRICIAN......................$ 40.42 28.99%+11.15
ELEC0223-006 03/01/2018
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton) Rates Fringes Teledata System Installer........$ 34.27 28.89%+10.90
ELEV0004-001 01/01/2018
Rates Fringes ELEVATOR MECHANIC................$ 57.62 32.645+a+b
FOOTNOTE FOR ELEVATOR MECHANICS:
a. Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day;
Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0004-001 12/01/2017
Rates Fringes Power equipment operators:
Group 1.....................$ 46.63 26.90+A Group 2.....................$ 46.17 26.90+A Group 3.....................$ 31.80 26.90+A Group 4.....................$ 38.57 26.90+A Group 5.....................$ 23.24 26.90+A Group 6.....................$ 27.40 26.90+A
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Crane; shovel; truck crane; cherry picker; dragline; trench hoe; backhoe; three drum machine; derrick; pile driver; elevator tower; hoist; gradall; shovel dozer; front end loader; fork lift; suger; boring machine; rotary drill; post hole hammer; post hole digger; pumpcrete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site);
crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake;
mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance; paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator; switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating); syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant
Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls) Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall)
IRON0007-006 09/16/2017
AREA 1: BRISTOL (Easton); ESSEX (Beverly, Gloucester, Lynn,Lynnfield, Manchester, Marblehead, Nahant, Rockport, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Carlisle, Concord, Dunstable, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); SUFFOLK AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, Topsfield, Wenham, West Newbury);
MIDDLESEX (Action, Billericia, Chelmsford, Dracut, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington) Rates Fringes Ironworkers:
AREA 1......................$ 44.71 30.56
AREA 2......................$ 40.30 30.56
IRON0007-010 09/16/2017
MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend);
NORFOLK (Medway) Rates Fringes
IRONWORKER.......................$ 44.41 30.56
IRON0037-005 09/16/2017
BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET; NORFOLK (Billingham, Franklin, Plainville, Wrentham) Rates Fringes
IRONWORKER.......................$ 34.89 26.87
LABO0014-001 12/01/2017
Rates Fringes Plasterer tender
BARNSTABLE, BRISTOL,
DUKES, ESSEX, NANTUCKET,
MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 32.83 22.50 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);
MIDDLESEX COUNTY
(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only);
NORFOLK COUNTY (Brookline, Dedham, and Milton only)....$ 37.50 23.65
LABO0022-009 12/01/2017
SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop, and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) Rates Fringes Laborers:
Group 1.....................$ 37.50 23.65 Group 2.....................$ 37.75 23.65 Group 3.....................$ 38.25 23.65 Group 4.....................$ 38.50 23.65 Group 5.....................$ 38.25 23.65 Group 6.....................$ 39.50 23.65 Group 7.....................$ 20.50 23.65
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; Carpenter Tenders GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector GROUP 3: Air track, block paver; rammer; curb setter, hydraulic and similar self-powered drills GROUP 4: Blaster; powderman GROUP 5: Pre-cast floor and roof plank erector GROUP 6: Asbestos removal laborers/haz-mat laborers GROUP 7: Flaggers
LABO0022-010 12/01/2017
Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline, Dedham and Milton) Rates Fringes Laborers:
Group 1.....................$ 32.83 22.50 Group 2.....................$ 33.08 22.50 Group 3.....................$ 33.58 22.50 Group 4.....................$ 33.83 22.50 Group 5.....................$ 33.58 22.50 Group 6.....................$ 34.83 22.50
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; Carpenter Tenders GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector GROUP 3: Air track, block paver; hammer; curb setter, hydraulic and similar self-powered drills GROUP 4: Blaster; powderman GROUP 5: Pre-cast floor and roof plank erector GROUP 6: Asbestos removal laborers/haz-mat laborers
LABO1421-004 12/01/2017
BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES Rates Fringes Laborers: (Wrecking)
Group 1.....................$ 37.65 23.65 Group 2.....................$ 38.40 23.65 Group 3.....................$ 38.65 23.65 Group 4.....................$ 33.65 23.65 Group 5.....................$ 36.75 23.65 Group 6.....................$ 37.65 23.65 Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.
PAIN0011-007 06/01/2017
BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES
Rates Fringes
GLAZIER..........................$ 36.28 20.45+A
FOOTNOTE:
A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day)
PAIN0035-004 01/01/2017
BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES; REMAINDER OF NORFOLK;
MIDDLESEX AND SUFFOLK COUNTIES
Rates Fringes Painters:
NEW CONSTRUCTION:
Brush, Taper...............$ 37.86 28.10 Spray, Sandblast...........$ 39.26 28.10
REPAINT:
Brush, Taper...............$ 35.92 28.10 Spray, Sandblast...........$ 37.32 28.10
PAIN0035-013 01/01/2017
MIDDLESEX (Cambridge, Everett, Malden, Medford, Somerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline) Rates Fringes Painters:
NEW CONSTRUCTION:
Brush, Taper...............$ 43.65 28.10 Spray, Sandblast...........$ 45.05 28.10
REPAINT:
Brush, Taper...............$ 41.71 28.10 Spray, Sandblast...........$ 43.11 28.10
PAIN0035-020 01/01/2017
ESSEX; MIDDLESEX; NORFOLK; SUFFOLK
Rates Fringes
GLAZIER..........................$ 37.86 28.10
PLAS0534-001 01/01/2018
ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 40.00 36.06
PLAS0534-004 01/01/2018
MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES
Rates Fringes
PLASTERER........................$ 40.00 36.06
PLUM0004-001 03/01/2018
MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend) Rates Fringes Plumbers and Pipefitters.........$ 43.96 25.61
PLUM0012-005 03/01/2018
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfield, Wenham, West Newbury) Rates Fringes
PLUMBER..........................$ 50.61 28.93
PLUM0012-007 03/01/2018
ESSEX (Lynn, Lynnfield, Nahant, Saugus, and Swampscott); MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK; WORCESTER (Hopedale and Southboro) Rates Fringes
PLUMBER..........................$ 54.69 28.93
PLUM0051-004 09/01/2016
BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton)
COUNTIES
Rates Fringes Plumbers and Pipefitters.........$ 38.38 28.20
PLUM0537-005 09/01/2016
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK;
WORCHESTER (Hopedale and Southboro) Rates Fringes
PIPEFITTER.......................$ 50.19 29.76
ROOF0033-001 02/01/2018
Rates Fringes Roofers:
All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 42.36 26.80
SFMA0550-001 03/01/2018
BRISTOL (Portion within 35 mile radius from Boston City Hall; ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of Pepperell and Shirley beyond 35 mile radius from Boston City Hall); NORFOLK; PLYMOUTH (Portion within 35 mile radius of Boston City Hall); SUFFOLK Rates Fringes SPRINKLER FITTER.................$ 57.78 28.08+a
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.
SFMA0550-002 03/01/2018
BRISTOL (Seekonk, Swansea, and Somerset) Rates Fringes SPRINKLER FITTER.................$ 52.00 28.08+a
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.
SFMA0669-001 04/01/2017
BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell and Shirley beyond 35 mile radius of Boston City Hall); NANTUCKET; PLYMOUTH (Beyond 35 mile radius of Boston City Hall) Rates Fringes
SPRINKLER FITTER.................$ 40.26 15.84
SHEE0017-003 10/01/2015
BRISTOL (Attleboro, Berkley, Easton, Mansfield, North Attleboro, Norton, Raynham, Taunton); ESSEX; MIDDLESEX;
NORFOLK; PLYMOUTH (except except Marion, Mattapoisett, Rochester, Wareham); SUFFOLK Rates Fringes Sheet metal worker...............$ 35.60 30.05
SHEE0017-007 10/01/2015
BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New Bedford, Rehoboth, Seeekonk, Somerset, Swansea, Westport); DUKES; AND NANTUCKET Rates Fringes Sheet metal worker...............$ 35.60 30.05
TEAM0379-001 12/01/2017
Rates Fringes Truck drivers:
Group 1.....................$ 32.48 24.27+A+B Group 2.....................$ 32.65 24.27+A+B Group 3.....................$ 32.72 24.27+A+B Group 4.....................$ 32.84 24.27+A+B Group 5.....................$ 32.94 24.27+A+B Group 6.....................$ 33.23 24.27+A+B Group 7.....................$ 33.52 24.27+A+B
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks Group 2: Two axle equipment; & forklift operator Group 3: Three axle equipment and tireman Group 4: Four and Five Axle equipment Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment Group 6: Specialized earth moving equipment over 35 tons Group 7: Trailers for earth moving equipment (double hookup)
FOOTNOTES:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day
B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 – 10 years of service; and 3 weeks vacation for more than 10 years of service
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications;
however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014.
UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
VA MEDICAL CENTER – WEST ROXBURY
BOSTON, MA.
PACU HVAC SYSTEM IMPROVEMENT
PROJECT No. 523A4-12-211
AI ENGINEERS, INC.
919 MIDDLE STREET
MIDDLETOWN, CT. 06457
(860) 635-7740
NOVEMBER 20, 2015
DEPARTMENT OF VETERANS AFFAIRS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build)
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 29 Testing Laboratory Services
01 57 19 Temporary Environmental Controls
01 74 19 Construction Waste Management
DIVISION 02 – EXISTING CONDITIONS
02 84 00 Firestopping 02922 00 Joint Sealants
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 41 00 Demolition 07 82 13.13 Glovebag Asbestos Abatement
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC and Boiler Plant Insulation 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 23 Hydronic Pumps 23 22 13 Steam and Condensate Heating Piping 23 25 00 HVAC Water Treatment 23 31 00 HVAC Ducts and Casings 23 34 00 HVAC Fans 23 74 13 Packaged Outdoor Central Station Air Handling Units
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 24 16 Panelboards
26 24 19 Motor Control Centers
26 27 26 Wiring Devices
26 29 11 Motor Controllers
26 29 21 Enclosed Switches and Circuit Breakers
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
-- Cover
S1.00 Building 1, Section B Third Level Rooftop Dunnage
M0.01 Mechanical General Notes, Symbols and Abbreviations
M1.00 Building 1, Section B Third Level Mechanical Demolition
M1.01 Building 1, Section B Third Level Mechanical Demolition
M1.02 Building 1, Section B Third Level Mechanical New Condition
M1.03 Building 1, Section B Third Level Mechanical New Condition
M1.04 Building 1, Section B Third Level Air Balance
M4.00 Mechanical Schedules
M6.00 Mechanical Details
M6.01 Mechanical Details
M6.02 Mechanical Control Diagrams & Sequences
E0.01 Electrical General Notes, Symbols and Abbreviations
E1.00 Building 1, Section B Third Level Electrical Demolition
E1.01 Building 1, Section B Third Level Electrical New Condition
- - - E N D - - -
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the PACU HVAC System
Improvement at the VA Medical Center, West Roxbury, Massachusetts, as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Contracting Officer Representative (COR).
C. Offices of AI Engineers, Inc. 919 Middle Street, Middletown CT 06457, as Architect/Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the
Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting
Officer or his duly authorized representative.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. The Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the project. The work includes the removal of an existing PACU air handling unit and installation of a new PACU air handling unit including all services to the unit such as steam, heating and cooling water, electricity and communications.
B. BASE ITEM: $______________________________________________
A single award shall be made on the BASE…
This is the start of the file's text. The full file is on GovTribe.