36C24118R0127-00001004.pdf

PDF 16 MB Posted

Attached to
MATOC CAT I-III All Locations Federal contract opportunity
Solicitation number
36C24118R0127
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

36C24118R0127 00001 TP09 402-14-567 Exhibit F-1 4-24-18.pdf

View the file

Other files for this federal contract opportunity

Other files attached to MATOC CAT I-III All Locations, newest first.
File Type Posted
36C24118D0101-000.docx DOCX document
36C24118D0105-000.docx DOCX document
36C24118D0104-000.docx DOCX document
36C24118D0103-000.docx DOCX document
36C24118D0102-000.docx DOCX document
36C24118D0099-000.docx DOCX document
36C24118D0098-000.docx DOCX document
36C24118D0097-000.docx DOCX document
36C24118D0094-000.docx DOCX document
36C24118D0093-000.docx DOCX document
36C24118D0091-000.docx DOCX document
36C24118R0127-0011000.docx DOCX document
36C24118R0127-0010002.docx DOCX document
36C24118R0127-0010001.pdf PDF
36C24118R0127-0009004.txt TXT text file
36C24118R0127-0009005.txt TXT text file
36C24118R0127-0008008.pdf PDF
36C24118R0127-0008002.docx DOCX document
36C24118R0127-0008007.pdf PDF
36C24118R0127-0008001.docx DOCX document
36C24118R0127-0008004.docx DOCX document
36C24118R0127-0008005.pdf PDF
36C24118R0127-0008006.pdf PDF
36C24118R0127-00007000.docx DOCX document
36C24118R0127-00007001.pdf PDF
36C24118R0127-00007005.pdf PDF
36C24118R0127-00007002.pdf PDF
36C24118R0127-00007003.pdf PDF
36C24118R0127-00007004.pdf PDF
36C24118R0127-00006001.docx DOCX document
36C24118R0127-00005000.docx DOCX document
36C24118R0127-00005002.pdf PDF
36C24118R0127-00005001.pdf PDF
36C24118R0127-00004002.pdf PDF
36C24118R0127-00004001.pdf PDF
36C24118R0127-00004000.docx DOCX document
36C24118R0127-00003000.docx DOCX document
36C24118R0127-00002001.pdf PDF
36C24118R0127-00002002.pdf PDF
36C24118R0127-00002000.docx DOCX document
36C24118R0127-00001007.pdf PDF
36C24118R0127-00001003.docx DOCX document
36C24118R0127-00001006.pdf PDF
36C24118R0127-00001005.pdf PDF
36C24118R0127-00001008.pdf PDF
36C24118R0127-007.pdf PDF
36C24118R0127-010.pdf PDF
36C24118R0127-006.docx DOCX document
36C24118R0127-008.pdf PDF
36C24118R0127-000.docx DOCX document
Show all 50

MATOC CAT I-III All Locations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT F-1 SEED PROJECT

NOTICE OF PROPOSED PROJECT, PROPOSAL FORM

Date:

PROJECT TITLE AND NO.: Project 402-14-567, Electrical Distribution System Upgrade, Togus, ME

PROJECT DESCRIPTION: Contractor shall completely prepare site and buildings for operations, including demolition and removal of remaining existing structures, and furnish labor and materials to perform work for the Upgrade Electrical Distribution System project.

CAT III $5,000,000 - $10,000,000

MAGNITUDE OF PROJECT: $5,000,000 - $10,000,000

PERFORMANCE PERIOD: 540 Calendar Days

SITE VISIT: A site visit for this project will be conducted on 5/23/2018 at 11:00am

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $35,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds.

All bonds are due no later than 10 days after award.

WAGE DETERMINATION: Currently, General Decision Number: ME180085 Modification No 0 dated 01/05/2018 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors shall immediately notify the Contracting Officer’s Representative (COR) and shall prepare a Report of Accident (VA Form 2162 or equivalent) in quadruplicate and forward the original and two copies to the Contracting Officer or COR for forwarding to Safety Officer.

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

Item Number

Description Lump Sum Amount

0001 GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Phase 1

1. Site work associated with the extension of the existing switchgear building.

2. Site work associated with MV duct banks to transformer T-24, replacement of MV

Switchgear “C”, and MV Feeder extension to new transformer T-4.

3. Site work associated with addition of new Generator 11.

4. Site work associated with underground duct banks required for Generator 11 and

Generator 10.

5. Exterior equipment pads:

a. Main MV Switchgear

b. MV Switchgear “C”

c. Generator 11

6. Site work associated with installation of new transformer T-4.

a. Installation of new gravel road and access gate.

7. Reconfiguration of wall/ closet located in B210 between Rooms 117 and 113.

8. Exterior equipment pad:

a. Transformer T-4

9. Housekeeping pads as indicated.

10. Allowance for Asbestos mitigation.

Phase 2

1. Generator 10

a. Site work associated with underground duct banks required for Generator 10 system.

402-14-567 Togus Elec Upgrade Seed Project

b. Modification of B244 exhaust louver and associated opening in building exterior wall.

c. Connection to existing fuel system.

d. Exhaust stack.

2. Reconfiguration of interior wall between B200 Rooms 160 and 162A to accommodate required clearances in front of new UPS.

3. Allowance for Asbestos mitigation.

0002 Electrical Work: Work includes all labor, material, equipment, temporary power, testing, and supervision to perform the required electrical construction work on this project including, but not limited to the following:

Phase 1

1. Replacement of Main Medium-Voltage Switchgear

a. Custom fabricated switchgear building extension to be extended off the existing switchgear structure.

b. New medium-voltage switchgear.

c. Splice and extension of existing incoming and outgoing feeders into new switchgear.

d. New medium-voltage manhole(s)

2. Addition of New Exterior Generator 11

a. Connection of Buildings 248, 240, 235, and 210 and addition of new electrical distribution equipment.

3. Replacement of Medium-Voltage Switchgear “C”

a. Replacement of switchgear and addition of new underground duct banks and manhole(s).

b. New medium voltage cabling and associated terminations.

4. B200/ B200E

a. Demolition, replacement and relocation of distribution panelboards in Room 20.

b. Demolition, replacement and relocation of existing MCC in 4th floor mechanical room with a new strut mounted panelboard.

c. Addition of Life Safety Branch include new distribution panelboard, ATS, and other associated electrical.

d. Replacement and relocation of transformer T-4, associated with the MRI addition to

B200/ B200E.

i. Replacement of primary and secondary feeders associated with transformer T-4, including underground duct bank.

ii. Underground primary duct bank to new Switchgear “C”.

5. Temporary Power Systems and all associated work. Work includes, but is not limited to the following:

a. Rental of temporary generators to provide temporary emergency power. Any

Temporary power systems shall be of equivalent capacity, or greater capacity, than the existing system(s).

b. Any generator fuel consumption, monitoring, and re-fueling as part of construction activities.

c. Temporary feeders and any associated conduit and fittings.

d. Temporary Distribution Panels.

e. Temporary Automatic Transfer Switches.

f. All control and ancillary power wiring associated with temporary systems.

g. Temporary fencing, signage, and any other equipment or materials required to maintain a safe work area.

h. Coordination of all work with the COR; this includes temporary equipment locations, construction schedule, and any required outages.

i. Any facility downtime is unacceptable unless explicitly coordinated with the owner.

Phase 2

1. B200/ B200E

a. Replacement of five (5) existing ASCO ATS controllers with updated Series 5 ATS controllers.

b. Relocation of three (3) dry type elevator transformers, addition of local secondary overcurrent protection.

c. Migration of SPD HVAC equipment loads to the equipment branch of the essential electrical system, MCC-2NE.

d. Addition of UPS system in B200.

i. Migration of existing circuits to existing UPS panelboard.

ii. Relocated of equipment currently installed on existing interior wall to be modified.

2. Replacement of Existing Generator 1 with new Generator 10 Within Building 244.

a. Demolition of existing generator.

b. Installation of new Generator 11.

c. Reconfiguration of B205 and B206 essential electrical systems.

d. Connection of Buildings 203, 204, and 232 to Generator 11 systems and addition of new electrical distribution equipment.

3. B202

a. Replacement of main switchboard and associated incoming and outgoing feeders.

b. Replacement of panelboard in engineering reception area.

4. Temporary Power Systems and all associated work. Work includes, but is not limited to the following:

a. Rental of temporary generators to provide temporary emergency power. Any

Temporary power systems shall be of equivalent capacity, or greater capacity, than the existing system(s).

b. Any generator fuel consumption, monitoring, and re-fueling as part of construction activities.

c. Temporary feeders and any associated conduit and fittings.

d. Temporary Distribution Panels.

e. Temporary Automatic Transfer Switches.

f. All control and ancillary power wiring associated with temporary systems.

g. Temporary fencing, signage, and any other equipment or materials required to maintain a safe work area.

h. Coordination of all work with the COR; this includes temporary equipment locations, construction schedule, and any required outages.

i. Any facility downtime is unacceptable unless explicitly coordinated with the owner.

0003 Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including the following:

Phase 1

1. Addition of New Exterior Generator 11

a. Fuel piping reconnection, extension, and any additional required modifications.

Phase 2

1. Replacement of existing Generator 1 with New Generator 10

a. Fuel piping reconnection, extension, and any additional required modifications.

b. Intake and exhaust system modification.

c. Rigging and staging associated with removal of existing generator and placement of new generator.

2. Relocation of existing condensate line to accommodate relocation of elevator transformers in B200.

INCLUDE A DETAILED PRICE BREAKDOWN ATTACHED TO THIS PROPOSAL.

SIGNATURE: COMPANY NAME

Name and title of person authorized to sign Offer Date

EXHIBIT F – 1A - CALCULATION OF SELF-PERFORMED WORK

PROJECT: Project 402-14-567, Electrical Distribution System Upgrades, Togus, Maine VISN 1

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.) NOTE: The intention of this set-aside is to have actual work performed by the Contractor’s own forces or the forces of other SDVOSB contractors and not just “contract management”. This contract is not intended for construction contract management firms.

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $___

B.2 If applying for consideration as a General Contractor (multi-discipline projects) subtract Specialty Trades (Unless being self performed) $ ______

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees;

and the contractor’s own job overhead costs.)

B.6 25 % Self-performed Work = Line B.5 / B.4 X 100% = %

Scope of Work 402-14-567 Upgrade Electrical Distribution System Contractor shall completely prepare site and buildings for operations, including demolition and removal of remaining existing structures, and furnish labor and materials to perform work for the Upgrade Electrical Distribution System project as required by drawings and specifications. General construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items. Electrical Work including all labor, material, equipment, temporary power, testing, and supervision to perform the required electrical construction work on this project.

Mechanical work to include labor, material, equipment and supervision to perform the work on this project per the attached plans and specifications.

The work of this contract will consist of two phases of work. The two phases will include but not be limited to

• GC provided independent commissioning agent.

• Enlarging the existing campus switchgear

• Providing medium voltage duct banks, transformers, switchgear, accessories and feeders.

• Provide new generators and associated distribution system, accessories and safeties

• Provide equipment pads

• Provide, or upgrade access roads

• Reconfiguration of interior spaces to accommodate new and existing equipment.

• Necessary Asbestos mitigation.

• Building modifications to accommodate new equipment, louvers, access etc.

• Connection to existing fuel systems.

• Site work associated with new duct banks, generators, and transformers.

• Provide temporary systems that meet or exceed the current capacity being removed.

• Control and ancillary power wiring associated with temporary systems.

• Temporary fencing, signage, and any other equipment or materials required to maintain a safe work area.

• Replacement of ATS controllers

• UPS system and wiring

• Replacement of main switchboard and associated incoming and outgoing feeders.

• Any facility downtime is unacceptable unless explicitly coordinated with the owner.

• Rigging and staging for removal and placement of equipment both temporary and permanent.

• Relocation of existing infrastructure to coordinate with new construction.

Generators will be by Caterpillar.

VAME has standardized on ASCO automatic transfer switches (ATS). Provide ASCO ATS for this project as indicated on the drawings.

Period of performance is 540 calendar days (approximately 18 months) from the Notice to Proceed.

WAGE RATES

General Decision Number: ME18008501/05/2018 ME85 Superseded General Decision Number: ME20170085 State: Maine Construction Type: Building County: Kennebec County in Maine.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis- Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018

BRMA0003-013 03/01/2017

Rates Fringes

BRICKLAYER.......................$ 30.36 22.01

* IRON0007-034 09/16/2017

Rates Fringes

IRONWORKER (ORNAMENTAL AND

REINFORCING).....................$ 24.79 21.59

LABO0327-003 07/01/2016

Rates Fringes LABORER: Common or General (Industrial Work Only)...........$ 17.30 15.22

SUME2014-018 01/31/2017

Rates Fringes CARPENTER, Includes Drywall Hanging, and Metal Stud Installation.....................$ 19.42 11.52

CEMENT MASON/CONCRETE FINISHER...$ 16.13 3.82

DRYWALL FINISHER/TAPER...........$ 16.84 2.87

ELECTRICIAN......................$ 25.13 9.57

ELEVATOR MECHANIC................$ 48.22 24.95

IRONWORKER, STRUCTURAL...........$ 18.84 1.81

LABORER: Common or General......$ 15.49 7.07 LABORER: Mason Tender - Brick...$ 18.33 2.01

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.42 3.12 OPERATOR: Crane.................$ 23.98 7.46 PAINTER (Brush and Roller).......$ 15.86 2.66 PLUMBER, Includes HVAC Pipe Installation.....................$ 20.08 3.70 SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 16.97 1.92 TRUCK DRIVER: Dump Truck........$ 14.79 2.53 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications;

however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014.

UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Electrical Distribution System Upgrades

Issue for Construction

VA Project No.

402-14-567

229905.00 VA Maine Healthcare Systems November 9, 2017

woodardcurran.com

COMMITMENT & INTEGRITY DRIVE RESULTS

41 Hutchins Drive Portland, ME 04102

800-426-4262 woodardcurran.com

COMMITMENT & INTEGRITY DRIVE RESULTS

Department of Veterans Affairs Electrical Distribution System Upgrades

Maine VA Medical Center Project No. 402-14-567

Issue for Construction

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 01 - GENERAL REQUIREMENTS DATE

01 00 00 General Requirements 11-15

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 02-15

01 33 23 Shop Drawings, Product Data, and Samples 07-15

01 35 26 Safety Requirements 10-14

01 42 19 Reference Standards 05-16

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 02-15

02 82 11 Traditional Asbestos Abatement 09-15

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

04 05 13 Masonry Mortaring 02-16

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 08-17

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 02-16

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-15

Issue for Construction

00 01 10-2

DIVISION 08 – OPENINGS

08 14 00 Interior Wood Doors 02-16

08 35 13.13 Accordion Folding Doors 05-15

08 71 00 Door Hardware 01-16

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 05-16

09 29 00 Gypsum Board 11-14

09 51 00 Acoustical Ceilings 12-16

09 91 00 Painting 01-16

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 23 – HEATING VENTILATION AND AIR CONDITIONING

23 05 11 Common Work Results for HVAC 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 11-16

23 10 00 Facility Fuel Systems 08-17

23 31 00 HVAC Ducts and Casings 03-13

DIVISION 25 – ADVANCED UTILITY METERING SYSTEM

25 10 10 Advanced Utility Metering System -

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 13 Medium-Voltage Cables 01-17

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 05-14

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 12-15

26 08 00 Commissioning of Electrical Systems 11-16

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 12-15

26 13 13 Medium-Voltage Circuit Breaker Switchgear 01-17

26 13 16 Medium-Voltage Fusible Interrupter Switches 05-14

26 22 00 Low-Voltage Transformers 12-15

Issue for Construction

00 01 10-3

26 24 13 Distribution Switchboards 08-14

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 01-16

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 32 13 Engine Generators 07-15

26 33 53 Static Uninterruptible Power Supply 01-17

26 36 23 Automatic Transfer Switches 01-17

26 43 13 Surge Protective Devices 01-17

DIVISION 27 - COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communications and Signal Wiring 06-15

27 15 00 Communications Structured Cabling 01-16

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 16 Asphalt Paving 09-15

32 31 13 Chain Link Fences and Gates 08-16

32 90 00 Planting 08-16

DIVISION 34 – TRANSPORTATION

34 71 13 Vehicle Barriers 08-16

Issue for Construction

00 01 10-4

THIS PAGE INTENTIONALLY LEFT BLANK

Issue for Construction i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SERVICES……………………………………………………………………………………………………….………15

1.13 LAYOUT OF WORK………………………………………………………………………………………………………………….………………16

1.14 AS-BUILT DRAWINGS

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.16 TEMPORARY USE OF EXISTING ELEVATORS

1.17 TEMPORARY TOILETS

1.18 AVAILABILITY AND USE OF UTILITY SERVICES

1.19 TESTS

1.20 INSTRUCTIONS

1.21 RELOCATED EQUIPMENT

1.22 CONSTRUCTION SIGN

1.23 SAFETY SIGN

1.24 HISTORIC PRESERVATION

Issue for Construction

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Electrical Upgrades

Project as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

COR.

C. Offices of Woodard & Curran, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Phase 1

1. Site work associated with the extension of the existing switchgear building.

Issue for Construction

01 00 00 -2

2. Site work associated with MV duct banks to transformer T-24, replacement of MV Switchgear “C”, and MV Feeder extension to new transformer T-4.

3. Site work associated with addition of new Generator 11.

4. Site work associated with underground duct banks required for

Generator 11 and Generator 10.

5. Exterior equipment pads:

a. Main MV Switchgear

b. MV Switchgear “C”

c. Generator 11

6. Site work associated with installation of new transformer T-4.

a. Installation of new gravel road and access gate.

7. Reconfiguration of wall/ closet located in B210 between Rooms 117 and 113.

8. Exterior equipment pad:

a. Transformer T-4

9. Housekeeping pads as indicated.

10. Allowance for Asbestos mitigation.

Phase 2

1. Generator 10

a. Site work associated with underground duct banks required for

Generator 10 system.

b. Modification of B244 exhaust louver and associated opening in building exterior wall.

c. Connection to existing fuel system.

d. Exhaust stack.

2. Reconfiguration of interior wall between B200 Rooms 160 and 162A to accommodate required clearances in front of new UPS.

3. Allowance for Asbestos mitigation.

B. ITEM II, Electrical Work: Work includes all labor, material, equipment, temporary power, testing, and supervision to perform the required electrical construction work on this project including, but not limited to the following:

Issue for Construction

01 00 00 -3

Phase 1

1. Replacement of Main Medium-Voltage Switchgear

a. Custom fabricated switchgear building extension to be extended off the existing switchgear structure.

b. New medium-voltage switchgear.

c. Splice and extension of existing incoming and outgoing feeders into new switchgear.

d. New medium-voltage manhole(s)

2. Addition of New Exterior Generator 11

a. Connection of Buildings 248, 240, 235, and 210 and addition of new electrical distribution equipment.

3. Replacement of Medium-Voltage Switchgear “C”

a. Replacement of switchgear and addition of new underground duct banks and manhole(s).

b. New medium voltage cabling and associated terminations.

4. B200/ B200E

a. Demolition, replacement and relocation of distribution panelboards in Room 20.

b. Demolition, replacement and relocation of existing MCC in 4th floor mechanical room with a new strut mounted panelboard.

c. Addition of Life Safety Branch include new distribution panelboard, ATS, and other associated electrical.

d. Replacement and relocation of transformer T-4, associated with the MRI addition to B200/ B200E.

i. Replacement of primary and secondary feeders associated with transformer T-4, including underground duct bank.

ii. Underground primary duct bank to new Switchgear “C”.

5. Temporary Power Systems and all associated work. Work includes, but is not limited to the following:

a. Rental of temporary generators to provide temporary emergency power. Any Temporary power systems shall be of equivalent capacity, or greater capacity, than the existing system(s).

b. Any generator fuel consumption, monitoring, and re-fueling as part of construction activities.

c. Temporary feeders and any associated conduit and fittings.

d. Temporary Distribution Panels.

e. Temporary Automatic Transfer Switches.

Issue for Construction

01 00 00 -4

f. All control and ancillary power wiring associated with temporary systems.

g. Temporary fencing, signage, and any other equipment or materials required to maintain a safe work area.

h. Coordination of all work with the COR; this includes temporary equipment locations, construction schedule, and any required outages.

i. Any facility downtime is unacceptable unless explicitly coordinated with the owner.

Phase 2

1. B200/ B200E

a. Replacement of five (5) existing ASCO ATS controllers with updated Series 5 ATS controllers.

b. Relocation of three (3) dry type elevator transformers, addition of local secondary overcurrent protection.

c. Migration of SPD HVAC equipment loads to the equipment branch of the essential electrical system, MCC-2NE.

d. Addition of UPS system in B200.

i. Migration of existing circuits to existing UPS panelboard.

ii. Relocated of equipment currently installed on existing interior wall to be modified.

2. Replacement of Existing Generator 1 with new Generator 10 Within

Building 244.

a. Demolition of existing generator.

b. Installation of new Generator 11.

c. Reconfiguration of B205 and B206 essential electrical systems.

d. Connection of Buildings 203, 204, and 232 to Generator 11 systems and addition of new electrical distribution equipment.

3. B202

a. Replacement of main switchboard and associated incoming and outgoing feeders.

b. Replacement of panelboard in engineering reception area.

4. Temporary Power Systems and all associated work. Work includes, but is not limited to the following:

Issue for Construction

01 00 00 -5

a. Rental of temporary generators to provide temporary emergency power. Any Temporary power systems shall be of equivalent capacity, or greater capacity, than the existing system(s).

b. Any generator fuel consumption, monitoring, and re-fueling as part of construction activities.

c. Temporary feeders and any associated conduit and fittings.

d. Temporary Distribution Panels.

e. Temporary Automatic Transfer Switches.

f. All control and ancillary power wiring associated with temporary systems.

g. Temporary fencing, signage, and any other equipment or materials required to maintain a safe work area.

h. Coordination of all work with the COR; this includes temporary equipment locations, construction schedule, and any required outages.

i. Any facility downtime is unacceptable unless explicitly coordinated with the owner.

C. ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including the following:

Phase 1

1. Addition of New Exterior Generator 11

a. Fuel piping reconnection, extension, and any additional required modifications.

Phase 2

1. Replacement of existing Generator 1 with New Generator 10

a. Fuel piping reconnection, extension, and any additional required modifications.

b. Intake and exhaust system modification.

c. Rigging and staging associated with removal of existing generator and placement of new generator.

2. Relocation of existing condensate line to accommodate relocation of elevator transformers in B200.

Issue for Construction

01 00 00 -6

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security/ escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site after construction hours.

2. The Contractor shall provide the guards and VA police with communication devices as directed.

3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officer’s Representative (COR) for

01 00 00 -7 the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

Issue for Construction

01 00 00 -8

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of

Issue for Construction

01 00 00 -9 utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing/ dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor, as follows:

H. All building(s) will be occupied during performance of work.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and

Issue for Construction

01 00 00 -10 affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area. Provide gates as required for access with necessary hardware, including hasps and padlocks.

Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm

(15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department (Department of Veterans) which will be required to respond to an alarm from Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

Issue for Construction

01 00 00 -11

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned are required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in

Issue for Construction

01 00 00 -12 unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by the parties to the

Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or…