36C10F18R0634-001.docx

DOCX document 112 KB Posted

Attached to
SEPS2BIM - Technical & Training Support Services
Solicitation number
36C10F18R0634
Issued by

About this file

36C10F18R0634 36C10F18R0634.docx

View the file

Other files

File Type Posted
36C10F19D0001-000.docx DOCX document
36C10F18R0634-0002000.docx DOCX document
36C10F18R0634-00001000.docx DOCX document
36C10F18R0634-002.pdf PDF
36C10F18R0634-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F18R0634

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a

. THIS

CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE.

CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________.

YOUR

OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C10F18R0634 05-03-2018 Seprena Jackson

(202) 461-5167 06-12-2018 10:00a.m. East 36C10F Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street, NW Washington DC 20001 X Y 541330 $15 Million X N/A X See Delivery Schedule

36C10F Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B1) 425 I Street, NW Washington DC 20001

Department of Veterans Affairs

FMS-VA-2(101)

http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

The Department of Veterans Affairs' (VA) Construction and and Facility Management (CFM) wishes to establish an Indefinite Delivery Indefinite Quantity (IDIQ) contract technical and training support services in support of VA's Space and Equipment Planning (SEPS) to Building Information Models (BIM) process and BIM technical services.

*** SEE ATTACHED STATEMENT OF WORK ***

*** SUBJECT TO THE AVAILABILITY OF FUNDS ***

$0.00 X X X Seprena Jackson

Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION3

B.2 STATEMENT OF WORK…………………………………………………………………………………..…4

B.3 PRICE/COST SCHEDULE……………………………………………………………………………….…..11

SECTION C - CONTRACT CLAUSES12
C.1 52.216-18 ORDERING (OCT 1995)12
C.2 52.216-19 ORDER LIMITATIONS (OCT 1995)12
C.3 52.216-21 REQUIREMENTS (OCT 1995)13
C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)13
C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)14
C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)14
C.7 52.243-1 CHANGES—FIXED-PRICE (AUG 1987) ALTERNATE I (APR 1984)14
C.8 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)15
C.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)18
C.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)18
C.11 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)18
C.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)18
C.13 VAAR 852.219-11 VA NOTICE OF TOTAL VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)19
C.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)20
C.15 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)21
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS22
SECTION E - SOLICITATION PROVISIONS23
E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)23
E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017)24
E.3 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)28
E.4 52.216-1 TYPE OF CONTRACT (APR 1984)32
E.5 52.233-2 SERVICE OF PROTEST (SEP 2006)32
E.6 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION)33
E.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)33
E.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)34

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C10F Seprena Jackson Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 425 I Street, NW Washington DC 20001

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] Upon completion/acceptance of individual Task Orders

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Department of Veterans Affairs

FMS-VA-2(101)

http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 STATEMENT OF WORK

A. GENERAL INFORMATION

1. Title of Project: Technical Expertise and Support for SEPS2BIM, BIM, and Facilities and Asset Lifecycle Management

1. Scope of Work: This SOW outlines the tasks and deliverables anticipated by the Department of Veterans Affairs (VA), Office of Construction and Facilities Management (CFM) for technical expertise to support update and improve the existing SEPS2BIM process by aligning with ongoing efforts to transform VA Standards criteria to data. CFM requires the contractor to provide technical expertise in the use of BIM for project execution, activations, facility management, portfolio management and other emerging VA data standards that support a Facilities and Asset Lifecycle Management (FALM) approach. VA will require the contractor to provide training as necessary on the SESPS2BIM process as well as manage the existing SEPS2BIM process.

The work outlined in this contract shall be coordinated with work by other VA consultants, VA personnel, and initiatives, including: changes to the SEPS database; supporting the leasing business process; the development of the Criteria Management System databases for facility standards; improving project delivery, space and facility management and CMMS /CAFM deployment; updating the Space Planning Criteria, Room Templates, and Data Sheets, as well as Capital Asset Inventory (CAI) reporting.

1. Background: The SEPS2BIM process is aligned with VA current standards in real time and supports access and transfer of data to include VA’s general facility standard criteria, specific project’s Program for Design, Preliminary Room Contents and other specific project information through RESTful web services into other electronic tools. SEPS2BIM provides the ability to move and track requirements and data seamlessly and without mistakes. By using SEPS2BIM VA can be assured that the information provided to and used by industry partners and VA are using the latest standards and can be correctly identified and tracked through multiple software platforms. Additional information on SEPS2BIM can be on these websites: https://www.cfm.va.gov/til/seps2bim.asp and seps2bim.org.

VA is embracing the use of Building Information Modeling (BIM) throughout its facility asset inventory, and requires assistance with identifying and managing data and modeling for planning, design construction, activations, and portfolio and facility management, which are for reporting purposes. Technical expertise in BIM (particularly Revit and other software’s that enhance modeling and data generation) is needed to augment and assist in the improvement of VA business processes.

3 Performance Period: The Period of Performance (POP) for this requirement is 365 calendar days from date of award and four (4) option years.

4 Type of Contract: Firm-Fixed Price award

5 Place of Performance:

Contractor’s site

For planning purposes, see Section “F” TRAVEL REQUIREMENT for additional locations.

B. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES

The Contractor shall provide all necessary personnel, supervision, services, supplies and equipment to perform all tasks and deliverables outlined in the Scope of Work.

1. TASK 1: SEPS2BIM and Data Technical Support:

1.1 The contractor shall provide all personal, supervision, equipment and supplies required to provide technical support required to improve, manage, and maintain VA’s SEPS2BIM process.

1.2 Contractor shall provide technical expertise to make recommendations and changes to align the SEPS2BIM application with new technical and data improvements; use additional room engineering data available through SEPS and the conversion of VA standards information to a database environment (Criteria Management System).

1.3 Provide technical expertise in the use and maintenance of RESTful services hosted on Max.gov for SEPS2BIM and other databases, such as the Criteria Management System.

1.4 Provide expertise in creating, managing, and using Global Unique Identifiers (GUIDS) for tracking objects/data (e.g., building components, building service equipment, and medical equipment and FFE) through project delivery, activations, and deployment.

1.5 Maintain the SEPS2BIM converters. Provide specifications to modify the SEPS2BIM process when required.

1.6 Provide coordination with SPAWAR, Max.gov, VHA, CFM, the Defense Health Agency, and other organizations or companies as required.

1.7 Provide technical analysis of need, type, and data capacity for data storage for various uses, including a VA approved secure cloud web server available 24/7/365 adequate to host the SEPS2BIM application, BIM Room Templates and Equipment, the SEPS2BIM.org website, and BIM models, etc.

1.8 Provide expertise to determine best options for large file transfers for BIM models and information between VA offices and between the private sector and VA that meets VA OI&T security protocols. Once approved, provide (e.g., develop, purchase, support, maintain, etc.) the transfer protocol.

1.9 Modify/simplify user interface, organize material, and manage the current SEPS2BIM.org website.

1.10 Provide technical expertise in creating, managing, transferring, and supporting data for Facilities and Asset Lifecycle Management (FALM), and possible use of Esri and Real Time Location Systems (RTLS) integrated with BIM.

2 Task 2: BIM Expertise:

2.1 The contractor shall create and migrate the existing BIM SEPS2BIM Room Template Models and Equipment Objects to the latest version of Revit (all deliverables shall be in file types: .rvt, IFC, .dwg, 2D & 3D PDF).

2.2 Evaluate BIM Room Template Models and Equipment Objects developed by others to use in the SEPS2BIM process and/or adjust the SEPS2BIM application as needed.

2.3 Make modeling corrections as needed to the existing BIM Room Template Models and Equipment Objects. Model new BIM Room Template Models and Equipment Objects as required. The number of BIM Room Templates Models and Room Equipment Objects to be reviewed, adapted, or modeled is subject to change yearly.

2.4 Provide 2D BIM derived floorplans, elevations, reflected ceilings, and ID callouts according to the BIM Room Data Sheet example provided by CFM, showing equipment placement and room technical engineering per CFM layout and Design Guide standards as required.

2.5 Enhance BIM performance to meet VA’s business needs by improving BIM functionality through the use of configuration software (Dynamo, Grasshopper, Python, Dreamweaver, etc.).

2.6 Provide technical expertise on topics within the scope of this procurement to help VA personnel and private sector firms working on VA projects when needed. Act as the point of contact to assist VA staff, VA design consultants, other software vendors who require assistance with adopting SEPS2BIM, using BIM Room Templates and Room Objects, as well as using BIM, Revit, immersion technology, and other software for planning, design, construction, facility and portfolio management, and reporting.

3 Task 3: Support for Facilities and Asset Lifecycle Management (FALM):

3.1 Contractor shall support and provide technical expertise and services to identify and assist in creating data standards, data management, BIM execution and modeling, data transfer protocols, and business efficiencies enabled by BIM as needed to support FALM and reporting.

4 Task 4: Training and Outreach:

4.1 Contractor shall create, write and develop training materials which are 508 compliant in various formats to include: written, oral, PowerPoint and YouTube videos (live webinar and on-demand webinar) for VA employees and private sector users on subjects outlined in this SOW

4.2 Contractor shall adapt the training materials as necessary for use in VA’s Technical Information Library (TIL), the SEPS2BIM.org website and other VA venues and outreach presentations.

4.3 Provide in-person and live webinar training.

4.4 Develop presentation and present on topics covered in this SOW at national conferences on behalf of VA.

5 Task 5: Meetings:

5.1 Contractor shall participate in person at meetings held in Washington, DC or other locations in the continental USA as needed.

5.2 Develop schedules for work milestones and deliverables and agendas for meetings, presentation materials, meeting summaries, and meeting minutes when required.

C. SCHEDULE FOR DELIVERABLES

If for any reason any deliverable cannot be met within the scheduled time frame of a Task Order the Contractor shall explain why in writing to the (COR), including a firm commitment of when the work shall be completed. This notice to the COR shall specify the following:

Reasons for the delay Modified delivery date Impact on the overall project A revised project plan with all adjusted dates

The COR will then review the facts and submit a recommendation to the Contracting Officer (CO). The CO shall review the information and issue a response in accordance with applicable regulations.

Contractor shall provide an invoice within ten (10) business days of completion of each Task Order. This invoice must include the T.O. number, the funding purchase order number, a listing of the type of service rendered, quantity and the associated cost.

D. INSPECTION AND ACCEPTANCE:

1. The Government will evaluate the Contractor's performance and may periodically record and evaluate the Contractor's performance in accordance with this SOW.

2. All records, documents, and associated papers provided by the Government and generated during the period of this contract become Government property and will remain in place upon contract termination or completion.

3. Final inspection and acceptance of all work performed, reports and any deliverables will occur at the place of delivery by the COR. Final approval and acceptance of documentation required herein shall be by letter of approval and acceptance by COR. The Contractor shall not construe any letter of acknowledgment of receipt material as a waiver of review, or as an acknowledgment that the material is in conformance with this SOW. Any approval given during preparation of the documentation shall not guarantee the final acceptance of the completed documentation. General quality measures, as set forth below, will be applied to each work product received from the Contractor under this Statement of Work.

· Accuracy Work Products shall be accurate in presentation, technical content, and adherence to accepted elements of style.

· Clarity Work Products shall be clear and concise. Any/All diagrams shall be easy to understand and be relevant to the supporting narrative.

· Consistency to Requirements All work products must satisfy the requirements of this statement of work.

· Timeliness Work Products shall be submitted on or before the due date specified in this statement of work or submitted in accordance with a later scheduled date determined by the Government.

E. REPORTING REQUIREMENTS

Provide summary reports of work and data analytics periodically during the year (at a minimum quarterly) with schedules and milestone dates of incremental work efforts when requested by CFM.

F. TRAVEL REQUIREMENTS

All reimbursable travel in conjunction with each task order requires prior authorization and approval prior to travel by the COR. Upon completion of any authorized travel an itemized invoice must be submitted and approved by the COR prior to any reimbursement.

1. All travel, lodging and M&IE will be reimbursed in accordance with the General Services Administration (GSA) Federal Travel Regulations (FTR).

2. All local travel will be by private or public ground transportation. Government rates and tips (not to exceed 15%) shall apply. No per diem will be allowed for local travel.

3. Non-local travel shall be Economy Class on commercially scheduled flights.

4. For cost purposes, the following locations are anticipated sites for the in-person training and are subject to modification by CFM as necessary: Washington, DC; Silver Spring, MD; Chicago, IL; San Francisco, CA; Tampa, FL and Long Beach, CA. VA. Will provide all training sites.

G. CONTRACT AWARD MEETING

VA’s approved Contractor shall not commence performance under this contract the COR and the CO have conducted a kick off meeting within five (5) business days after contract award or has been advised by the CO that a kick off meeting is waived.

H. CONTRACTOR EXPERIENCE REQUIREMENTS - KEY PERSONNEL

The Contractors shall be fully capable of performing all duties within the SOW to provide VA continuous support throughout the term of this contract. The Contractor shall substantiate the following:

1. Key Personnel:

1.1 Project Manager shall have a minimum of ten (10) years of experience managing data in the production of architectural design projects.

1.2 Principal Data/Architect shall have a minimum of fifteen (15) years of data management with facility (architectural) data, database design, working with GUIDS, and software applications that use data from RESTful web services. Five (5) of the fifteen (15) years must show technical expertise and knowledge of the SEPS database, the MILSTD 1691 equipment table, MILSTD Appendix B data, and RESTful services provided by Max.gov within the context of supporting the SEPS2BIM process. Demonstrate the capability to give public presentations to audiences of 100+ attendees in a professional, engaged manner. Provide a list of previous speaking engagement and training venues, and feedback from audiences (where available). Describe projects that illustrate experience. Demonstrate up-to-date knowledge of cutting edge use of BIM technology and industry trends that can be adapted to improve planning, design, construction, and facility and portfolio management, and leasing projects. Demonstrate ability to be innovative and providing technical expertise in achieving new technical advances, such as awards, published articles, successful projects, etc.

1.3 Senior BIM Manager/Modeler shall have a minimum of ten (10) years of experience demonstrating a comprehensive, high level skill in architectural modeling using Revit (including the current release), as well as knowledge of how the software works with SEPS2BIM and its use for managing project data, 2D design production, and exporting to other file formats (example: IFC, 3D PDF, .dwg, .dwf, .pdf, etc.). Show competency in software that enhances BIM business performance (e.g., Dynamo, Grasshopper, Python, Dreamweaver, Rhinoceros, 3D Max), and working with GUIDS. Provide descriptions of the work completed and demonstrate knowledge of each of these databases/systems or demonstrate and provide experience in other equivalent systems of transferring data.

Demonstrate up-to-date knowledge of cutting edge use of BIM technology and industry trends that can be adapted to improve planning, design, construction, and facility and portfolio management, and leasing projects. Demonstrate ability to be innovative and providing technical expertise in achieving new technical advances, such as awards, published articles, successful projects, etc.

1.4 BIM Modeler shall have a minimum of eight (8) years of experience of modeling in BIM (Revit) for design production documentation for construction, as well as modeling Furniture, Fixtures, and Equipment (FFE) and Architectural Significant Equipment (ASE) objects and the appropriate data management of those objects so they do not impact production/model management during the design and activation process.

1.5 Web Designer/YouTube Production Designer shall have a minimum of eight (8) years of experience designing webpages and 508 compliant YouTube training videos, and be capable of writing tutorial and training materials to convey complex, technical subjects in a simple manner so the ideas are easily understood. Demonstrate and provide samples of ability to develop text and graphics for PowerPoint and YouTube videos that are focused, clear, exciting, and engaging, and that align and support the message for in-person and on-line presentations.

2. Continuity of Support: The Contractor shall ensure that the contractual required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are available for all hours of the workday. If for any reason the Contractor’s staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the COR prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

3. Replacement of Key Personnel: Prior to replacing any individual designated as Key by the Government, the Contractor shall notify the Contracting Officer no less than ten (10) business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes shall possess qualifications equal to or superior to those of the Key person being replaced. The Contractor shall not replace Key Contractor personnel without acknowledgment from the Contracting Officer. Instructors are designated as Key Personnel for this requirement. Note: The Government may designate additional Contractor personnel as Key at the time of award.

The request shall be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitution. The Contractor shall submit a complete resume for the proposed substitute, any changes to the rate specified in the order (as applicable) and any other information requested by the COR needed to approve or disapprove the proposed substitution. The COR will evaluate such requests and promptly notify the Contractor of approval or disapproval thereof in writing.

I. CONFIDENTIALLY AND NONDISCLOSURE

It is agreed that:

The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the Contractor in the performance of this task order, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the task order.

J. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

1. VA Information and Information System Security/Privacy Requirements General All Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. §552a, and VA personnel, regarding information and information system security. Contractors must follow policies and procedures outlined in VA Directive 6500, Information Security Program; and VA Handbook 6500.6, Contract Security which are available at: http://www1.va.gov/vapubs and its handbooks to ensure appropriate security controls are in place.

2. Access to VA Information and VA Information Systems: NA

K. CHANGES TO STATEMENT OF WORK

Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the Contractor through the actions of parties other than the CO shall be borne by the Contractor.

B.3 PRICE/COST SCHEDULE

Labor Category

Unit Labor Rate

Base Year

Labor Rate

Option Year 1

Labor Rate

Option Year 2

Labor Rate

Option Year 3

Labor Rate

Option Year 4

Project Manager
Hourly
$_______
$_______
$_______
$_______
$_______
Project Data Architect
Hourly
$_______
$_______
$_______
$_______
$_______
Senior BIM Manager, Modeler
Hourly
$_______
$_______
$_______
$_______
$_______
BIM Modeler
Hourly
$_______
$_______
$_______
$_______
$_______
Web YouTube Designer
Hourly
$_______
$_______
$_______
$_______
$_______
Server Web Hosting / Internet Services
Yearly
$_______
$_______
$_______
$_______
$_______
Travel for one (1) day meetings
Each
$________
$_______
$________
$________
$________

Submit cost breakdown detail showing proposed staff and hourly rates plus annual inflation for base and option years.

The Minimum Value of the Contract is $3,000.00. The total contract amount for the base and four one-year options shall not exceed $5,000,000.00.

Individual Task Orders will be issued against this Indefinite Delivery Indefinite Quantity (IDIQ) Contract.

36C10F18R0634

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

FAR Number
Title
Date
52.212-4
CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS
JAN 2017

ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

The following clauses are incorporated into 52.212-4 as an addendum to this contract:

C.1 52.216-18 ORDERING (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the effective date of the contract through the end of the effective period.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of Clause)

C.2 52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor—

(1) Any order for a single item in excess of $1,000,000.00.;

(2) Any order for a combination of items in excess of $1,000,000.00; or

(3) A series of orders from the same ordering office within thirty (30) days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause)

C.3 52.216-21 REQUIREMENTS (OCT 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after .

(End of Clause)

C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after .

(End of Clause)

FAR Number
Title
Date
52.203-17
CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
APR 2014

C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

(End of Clause)

C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

(End of Clause)

FAR Number
Title
Date
52.232-18
AVAILABILITY OF FUNDS
APR 1984

C.7 52.243-1 CHANGES—FIXED-PRICE (AUG 1987) ALTERNATE I (APR 1984)

(a) The Contracting Officer may at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract in any one or more of the following:

(1) Description of services to be performed.

(2) Time of performance (i.e., hours of the day, days of the week, etc.).

(3) Place of performance of the services.

(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract.

(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.

(d) If the Contractor's proposal includes the cost of property made obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.

(e) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

(End of Clause) C.8 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)

(a) The Government may terminate performance of work under this contract in whole or, from time to time, in part if the Contracting Officer determines that a termination is in the Government's interest. The Contracting Officer shall terminate by delivering to the Contractor a Notice of Termination specifying the extent of termination and the effective date.

(b) After receipt of a Notice of Termination, and except as directed by the Contracting Officer, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this clause:

(1) Stop work as specified in the notice.

(2) Place no further subcontracts or orders (referred to as subcontracts in this clause) for materials, services, or facilities, except as necessary to complete the continued portion of the contract.

(3) Terminate all subcontracts to the extent they relate to the work terminated.

(4) Assign to the Government, as directed by the Contracting Officer, all right, title, and interest of the Contractor under the subcontracts terminated, in which case the Government shall have the right to settle or to pay any termination settlement proposal arising out of those terminations.

(5) With approval or ratification to the extent required by the Contracting Officer, settle all outstanding liabilities and termination settlement proposals arising from the termination of subcontracts; the approval or ratification will be final for purposes of this clause.

(6) As directed by the Contracting Officer, transfer title and deliver to the Government—

(i) The fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced or acquired for the work terminated; and

(ii) The completed or partially completed plans, drawings, information, and other property that, if the contract had been completed, would be required to be furnished to the Government.

(7) Complete performance of the work not terminated.

(8) Take any action that may be necessary, or that the Contracting Officer may direct, for the protection and preservation of the property related to this contract that is in the possession of the Contractor and in which the Government has or may acquire an interest.

(9) Use its best efforts to sell, as directed or authorized by the Contracting Officer, any property of the types referred to in paragraph (b)(6) of this clause; provided, however, that the Contractor (i) is not required to extend credit to any purchaser and (ii) may acquire the property under the conditions prescribed by, and at prices approved by, the Contracting Officer. The proceeds of any transfer or disposition will be applied to reduce any payments to be made by the Government under this contract, credited to the price or cost of the work, or paid in any other manner directed by the Contracting Officer.

(c) The Contractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 120-day period.

(d) After expiration of the plant clearance period as defined in Subpart 49.001 of the Federal Acquisition Regulation, the Contractor may submit to the Contracting Officer a list, certified as to quantity and quality, of termination inventory not previously disposed of, excluding items authorized for disposition by the Contracting Officer. The Contractor may request the Government to remove those items or enter into an agreement for their storage. Within 15 days, the Government will accept title to those items and remove them or enter into a storage agreement. The Contracting Officer may verify the list upon removal of the items, or if stored, within 45 days from submission of the list, and shall correct the list, as necessary, before final settlement.

(e) After termination, the Contractor shall submit a final termination settlement proposal to the Contracting Officer in the form and with the certification prescribed by the Contracting Officer. The Contractor shall submit the proposal promptly, but no later than 1 year from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 1-year period. However, if the Contracting Officer determines that the facts justify it, a termination settlement proposal may be received and acted on after 1 year or any extension. If the Contractor fails to submit the proposal within the time allowed, the Contracting Officer may determine, on the basis of information available, the amount, if any, due the Contractor because of the termination and shall pay the amount determined.

(f) Subject to paragraph (e) of this clause, the Contractor and the Contracting Officer may agree upon the whole or any part of the amount to be paid or remaining to be paid because of the termination. The amount may include a reasonable allowance for profit on work done. However, the agreed amount, whether under this paragraph (f) or paragraph (g) of this clause, exclusive of costs shown in paragraph (g)(3) of this clause, may not exceed the total contract price as reduced by (1) the amount of payments previously made and (2) the contract price of work not terminated. The contract shall be modified, and the Contractor paid the agreed amount. Paragraph (g) of this clause shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.

(g) If the Contractor and the Contracting Officer fail to agree on the whole amount to be paid because of the termination of work, the Contracting Officer shall pay the Contractor the amounts determined by the Contracting Officer as follows, but without duplication of any amounts agreed on under paragraph (f) of this clause:

(1) The contract price for completed supplies or services accepted by the Government (or sold or acquired under paragraph (b)(9) of this clause) not previously paid for, adjusted for any saving of freight and other charges.

(2) The total of—

(i) The costs incurred in the performance of the work terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs attributable to supplies or services paid or to be paid under paragraph (g)(1) of this clause;

(ii) The cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the contract if not included in subdivision (g)(2)(i) of this clause; and

(iii) A sum, as profit on subdivision (g)(2)(i) of this clause, determined by the Contracting Officer under 49.202 of the Federal Acquisition Regulation, in effect on the date of this contract, to be fair and reasonable; however, if it appears that the Contractor would have sustained a loss on the entire contract had it been completed, the Contracting Officer shall allow no profit under this subdivision (g)(2)(iii) and shall reduce the settlement to reflect the indicated rate of loss.

(3) The reasonable costs of settlement of the work terminated, including—

(i) Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data;

(ii) The termination and settlement of subcontracts (excluding the amounts of such settlements); and

(iii) Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of the termination inventory.

(h) Except for normal spoilage, and except to the extent that the Government expressly assumed the risk of loss, the Contracting Officer shall exclude from the amounts payable to the Contractor under paragraph (g) of this clause, the fair value as determined by the Contracting Officer, for the loss of the Government property.

(i) The cost principles and procedures of Part 31 of the Federal Acquisition Regulation, in effect on the date of this contract, shall govern all costs claimed, agreed to, or determined under this clause.

(j) The Contractor shall have the right of appeal, under the Disputes clause, from any determination made by the Contracting Officer under paragraph (e), (g), or (l) of this clause, except that if the Contractor failed to submit the termination settlement proposal or request for equitable adjustment within the time provided in paragraph (e) or (l), respectively, and failed to request a time extension, there is no right of appeal.

(k) In arriving at the amount due the Contractor under this clause, there shall be deducted—

(1) All unliquidated advance or other payments to the Contractor under the terminated portion of this contract;

(2) Any claim which the Government has against the Contractor under this contract; and

(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the Contractor or sold under the provisions of this clause and not recovered by or credited to the Government.

(l) If the termination is partial, the Contractor may file a proposal with the Contracting Officer for an equitable adjustment of the price(s) of the continued portion of the contract. The Contracting Officer shall make any equitable adjustment agreed upon. Any proposal by the Contractor for an equitable adjustment under this clause shall be requested within 90 days from the effective date of termination unless extended in writing by the Contracting Officer.

(m)(1) The Government may, under the terms and conditions it prescribes, make partial payments and payments against costs incurred by the Contractor for the terminated portion of the contract, if the Contracting Officer believes the total of these payments will not exceed the amount to which the Contractor will be entitled.

(2) If the total payments exceed the amount finally determined to be due, the Contractor shall repay the excess to the Government upon demand, together with interest computed at the rate established by the Secretary of the Treasury under 50 U.S.C. App. 1215(b)(2). Interest shall be computed for the period from the date the excess payment is received by the Contractor to the date the excess is repaid. Interest shall not be charged on any excess payment due to a reduction in the Contractor's termination settlement proposal because of retention or other disposition of termination inventory until 10 days after the date of the retention or disposition, or a later date determined by the Contracting Officer because of the circumstances.

(n) Unless otherwise provided in this contract or by statute, the Contractor shall maintain all records and documents relating to the terminated portion of this contract for 3 years after final settlement. This includes all books and other evidence bearing on the Contractor's costs and expenses under this contract. The Contractor shall make these records and documents available to the Government, at the Contractor's office, at all reasonable times, without any direct charge. If approved by the Contracting Officer, photographs, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.

(End of Clause)

C.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Clause)

C.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)

The bidder or offeror agrees that if a contract is awarded to him/her, as a result of this solicitation, he/she will not advertise the award of the contract in his/her commercial advertising in such a manner as to state or imply that the Department of Veterans Affairs endorses a product, project or commercial line of endeavor.

(End of Clause) C.11 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)

(a) Except as provided in paragraph (c) below, the Contractor shall display prominently, in common work areas within business segments performing work under VA contracts, Department of Veterans Affairs Hotline posters prepared by the VA Office of Inspector General.

(b) Department of Veterans Affairs Hotline posters may be obtained from the VA Office of Inspector General (53E), P.O. Box 34647, Washington, DC 20043-4647.

(c) The Contractor need not comply with paragraph (a) above if the Contractor has established a mechanism, such as a hotline, by which employees may report suspected instances of improper conduct, and instructions that encourage employees to make such reports.

(End of Clause) C.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)

(a) Definition. For the Department of Veterans Affairs, “Service-disabled veteran-owned small business concern or SDVSOB”:

(1) Means a small business concern:

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans or eligible surviving spouses (see VAAR 802.201 Surviving Spouse definition);

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran;

(iii) The business meets Federal small business size standards for the applicable North American…