3150223371QQ_AsphaltMix.xlsx

XLSX spreadsheet 287 KB Posted

Attached to
Commodity NY|23371|PC70673
Contract number
PC70673
Issued by
New York

About this file

This document is a New York State Office of General Services (OGS) Statewide Contract Quick Quote form for Comprehensive Bituminous Concrete (Asphalt Mix and Cold Patch), Award #23371, covering asphalt materials and related services across the state. The contract involves multiple asphalt suppliers and contractors, including but not limited to All States Construction, Alliance Asphalt, Asphalt Supply of Long Island, Barre Stone Products, Barrett Paving Materials, and over 50 other regional asphalt and paving companies.

The contract covers various asphalt mix types and specifications, including bituminous stabilized course, miscellaneous patching, shim course, and top/binder layers with different compaction and asphalt specifications. Pricing includes complex adjustment mechanisms involving monthly asphalt price adjustments and quarterly Producer Price Index (PPI) calculations. The contract allows for optional services such as paving equipment rental, traffic control, milling, and additional labor. Contractors can provide quotes for different asphalt mix materials, with pricing calculated based on material type, quantity, delivery distance, and various price adjustment factors. The contract appears designed to provide flexible, competitively priced asphalt materials and services for state and local government infrastructure projects.

View the file

Other files

File Type Posted
3150223371PL_AsphaltMix.xlsx XLSX spreadsheet
3150223371_LiquidGroupSpec947.pdf PDF
31502PriceAdjust24.xlsx XLSX spreadsheet
3150223371_HowtoUse.pdf PDF
3150223371_NYSDOTRegions.pdf PDF
3150223371p.pdf PDF
31555PriceAdjust23.xlsx XLSX spreadsheet
3150223371_DetailedSpecCMCMM.pdf PDF
3150223371_GeneralSpec.pdf PDF
3150223371ra.pdf PDF
3150223371_AMGroupSpec949.pdf PDF
3150223371_DetailedSpecCPMP.pdf PDF
3150223371_Insurance.pdf PDF
315xxPriceAdjust24.xlsx XLSX spreadsheet
315xxPriceAdjust25.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quick Quote Asphalt Mix

AWARD# 23371 - GROUP - 31502

COMPREHENSIVE BITUMINOUS CONCRETE

(Asphalt Mix and Cold Patch) (Statewide)

ASPHALT MIX - QUICK QUOTE

AGENCY/AUTHORIZED USER COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Quick Quote form sent to the Contractor on (date): Select / / 20

SEE BELOW - Update per Award & then hide columns
Agency/User:

Project Name: Project #

Project Location:

County: City: Zip Code:

MATERIAL #1:
Select from the drop-down menu

Estimated Total Quantity for Material #1: Tons

Check below if Requested:

Select Asphalt Item with Polymer Modification required for Material #1

Select Asphalt Item with Polymer Fibers required for Material #1

Material #1 - Price Adjustment Calculation for the Month of: Select / 20 0

Note to Authorized User:

For instructions about how to enter the Price Adjustment Information below, please, refer to the tab "Price Adjustment Instructions" at the bottom of this spreadsheet.

(From Table #1 - see "Price Adjustment Instructions" tab)
a) - Monthly Asphalt Price Adjustment per Ton =
(From Table #2 - see "Price Adjustment Instructions" tab)
b) - Quarterly PPI Price Adjustment Percentage (%) =
(From Table #2 - see "Price Adjustment Instructions" tab)
c) - Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance =

AGENCY/AUTHORIZED USER COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

MATERIAL #2:
Select from the drop-down menu if Material #2 is needed

Estimated Total Quantity for Material #2: Tons

Check below if applicable:

Select Asphalt Item with Polymer Modification required for Material #2

Select Asphalt Item with Polymer Fibers required for Material #2

Material #2 - Price Adjustment Calculation for the Month of: Select / 20 0

Monthly Asphalt Price Adjustment per Ton =

Quarterly PPI Price Adjustment Percentage (%) =

Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance =

MATERIAL #3:
Select from the drop-down menu if Material #3 is needed

Estimated Total Quantity for Material #3: Tons

Check below if applicable:

Select Asphalt Item with Polymer Modification required for Material #3

Select Asphalt Item with Polymer Fibers required for Material #3

Material #3 - Price Adjustment Calculation for the Month of: Select / 20 0

Monthly Asphalt Price Adjustment per Ton =

Quarterly PPI Price Adjustment Percentage (%) =

Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance =

AGENCY/AUTHORIZED USER COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items (select "YES" if the optional item is required for the project):

Required(Indicate number of units if applicable):
SelectOptional Flagger
SelectOptional General Laborer
SelectPaver with OperatorPaver Mobilization0
SelectPaver with Operator & Screed Person(Mobilization applies per paver/project)
Select10-Ton Static RollerRoller Mobilization0
Select10-Ton Static Roller with Operator(Mobilization applies per roller/project)
Select10-Ton Vibratory Roller
Select10-Ton Vibratory Roller with Operator
SelectSkidsteer with Milling HeadSkidsteer Mobilization0
SelectSkidsteer with Milling Head w/ Operator(Mobilization per skidsteer/project)
SelectWater TankWater Tank Mobilization0
SelectWater Tank with Operator(Mobilization per water tank/project)

Note: Mobilization is a one-time charge (per machine) for the duration of the project

Select Optional Pilot Vehicle with Driver

Select Optional Additional Construction Sign

Select Work Zone Traffic Control (WZTC)

SelectAbrading Existing Pavement Markings by the Contractor
with Work Zone Traffic Control (WZTC) by theSelect from the drop-down

Total Linear Feet

SelectOptional Joint Adhesive by the Contractor
with Work Zone Traffic Control (WZTC) by theSelect from the drop-down

Total Linear Feet

Select OCP Coverage ($1 Million/occurrence, $2 Million aggregate)

AGENCY/AUTHORIZED USER COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items (select "YES" if the optional item is required for the project):
PRODUCTION COLD MILLING

Select Price per Square Yard for Production Cold Milling Select from the drop-down of

Bituminous Concrete with Hauling and Disposal by the Select from the drop-down and sweeping the milled surfaces by the Contractor.

Total Square Yards

PRODUCTION COLD MICROMILLING

Select Price per Square Yard for Production Cold Micromilling (depth less than 2") of

Bituminous Concrete with Hauling and Disposal by the Select from the drop-down and sweeping the milled surfaces by the Contractor.

Total Square Yards

MOBILIZATION - COLD MILLING / MICROMILLING

Milling Machine Mobilization (# of Milling Machines)

Mobilization applies per milling maching per project

Mobilization is a one-time charge (per machine) for the duration of the project

AGENCY/AUTHORIZED USER COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Anticipated Project Start Date:

Estimated Number of Days to Complete Project: Days

Agency/User Contact:

Agency/User Phone:

Quick Quote Must be Returned by:

Agency/User Comments: (Note: Press Alt+Enter to create a new line)

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION
Note: The Contractor should develop the Quick Quote based on the options chosen by the User
Project Name:Project #

Contractor: Select from the drop-down menu

Plant #: Phone:

Plant Location:

Material #1: Not Requested by User

A Price (F.O.B. Price for Material) = per Ton

Material #1 - Price Adjustment Calculation for the Month of: Select / 20 0

B Monthly Asphalt Price Adjustment per Ton = $0.000

C Quarterly PPI Price Adjustment Percentage (%) = 0.00%

D Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance = 0.00%

E Quarterly PPI Price Adjustment (A x C x D) = $0.000

F1 Polymer Modification (Not Requested) per Ton

F2 Polymer Fibers (Not Requested) per Ton

G Price Material w/ Price Adjustments (A + B) + (E) + (F1) + (F2) = $0.000 per Ton

Delivery Cost Calculation:

Estimated Haul Distance: Miles

H Price Ton/Mile Hauling (0 - 1 Mile) = per Ton

I Price Ton/Mile Hauling (1 + Miles) = per Ton

J Total Delivery Cost: H + [ I x (Estimated Haul Distance -1)] = $0.000 per Ton

K Total Tons 0.000

L Total Material plus Delivery Cost (G + J) x Total Tons = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Material #2: Not Requested by User

M Price (F.O.B. Price for Material) = per Ton

Material #2 - Price Adjustment Calculation for the Month of: Select / 20 0

N Monthly Asphalt Price Adjustment per Ton = $0.000

O Quarterly PPI Price Adjustment Percentage (%) = 0.00%

P Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance = 0.00%

Q Quarterly PPI Price Adjustment (M x O x P) = $0.000

R1 Polymer Modification (Not Requested) per Ton

R2 Polymer Fibers (Not Requested) per Ton

S Price Material w/ Price Adjustments (M + N) + (Q) + (R1) + (R2) = $0.000 per Ton

Delivery Cost Calculation:

Estimated Haul Distance: Miles

T Price Ton/Mile Hauling (0 - 1 Mile) = per Ton

U Price Ton/Mile Hauling (1 + Miles) = per Ton

V Total Delivery Cost: T + [U x (Estimated Haul Distance -1)] = $0.000 per Ton

W Total Tons 0.000

X Total Material plus Delivery Cost (S + V) x Total Tons = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Material #3: Not Requested by User

Y Price (F.O.B. Price for Material) = per Ton

Material #3 - Price Adjustment Calculation for the Month of: Select / 20 0

Z Monthly Asphalt Price Adjustment per Ton = $0.000

A1 Quarterly PPI Price Adjustment Percentage (%) = 0.00%

B1 Difference of 100% Material Minus Total % Asphalt plus Fuel Allowance = 0.00%

C1 Quarterly PPI Price Adjustment (Y x A1 x B1) = $0.000

D1 Polymer Modification (Not Requested) per Ton

D2 Polymer Fibers (Not Requested) per Ton

E1 Price Material w/ Price Adjustments (Y + Z) + (C1) + (D1) + (D2) = $0.000 per Ton

Delivery Cost Calculation:

Estimated Haul Distance: Miles

F1 Price Ton/Mile Hauling (0 - 1 Mile) = per Ton

G1 Price Ton/Mile Hauling (1 + Miles) = per Ton

H1 Total Delivery Cost: F1 + [G1 x (Estimated Haul Distance -1)] = $0.000 per Ton

I1 Total Tons 0.000

J1 Total Material plus Delivery Cost (E1 + H1) x Total Tons = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items:

Optional Items Not Requested by the User will be Grayed Out
Price per Day per Paver with Operator =

Number of Pavers = 0 Number of Days =

Total Paver with Operator = $0.000

Price per Day per Paver with Operator & Screed Person =

Number of Pavers = 0 Number of Days =

Total Paver With Operator & Screed Person = $0.000

Paver Mobilization per Project = Total # of Pavers = 0

Total Paver Mobilization per Project = $0.000

Price per Day per 10-Ton Static Roller =

Number of Rollers = 0 Number of Days =

Total 10-Ton Static Roller(s) = $0.000

Price per Day per 10-Ton Static Roller with Operator =

Number of Rollers = 0 Number of Days =

Total 10-Ton Static Roller(s) with Operator = $0.000

Price per Day per 10-Ton Vibratory Roller =

Number of Rollers = 0 Number of Days =

Total 10-Ton Vibratory Roller(s) = $0.000

Price per Day per 10-Ton Vibratory Roller with Operator =

Number of Rollers = 0 Number of Days =

Total 10-Ton Vibratory Roller(s) with Operator = $0.000

Roller Mobilization per Project (per Roller) = # of Rollers = 0

Total Roller(s) Mobilization per Project = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items (Cont'd):

Price per Day per Skidsteer with Milling Head =

Number of Skidsteers = 0 Number of Days =

Total Skidsteer(s) with Milling Head = $0.000

Price per Day per Skidsteer with Milling Head with Operator =

Number of Skidsteers = 0 Number of Days =

Total Skidsteer(s) with Milling Head with Operator = $0.000

Skidsteer Mobilization per Project = # of Skidsteer = 0

Total Skidsteer(s) Mobilization per Project = $0.000

Price per Day per Water Tank =

Number of Water Tanks = 0 Number of Days =

Total Water Tank(s) = $0.000

Price per Day per Water Tank with Operator =

Number of Water Tanks = 0 Number of Days =

Total Water Tank(s) with Operator = $0.000

Water Tank Mobilization per Project = # of Water Tanks = 0

Total Water Tank(s) Mobilization per Project = $0.000

Price Work Zone Traffic Control = Number of Days =

Total Work Zone Traffic Control = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items (Cont'd):

Price Optional Flagger per Day =

Number of Flaggers = 0 Number of Days =

Total Optional Flagger(s) = $0.000

Price Optional General Laborer per Day =

Number of General Laborers = 0 Number of Days =

Total Optional General Laborer(s) = $0.000

Price Optional Pilot Vehicle with Driver per Day =

Number of Pilot Vehicles = 0 Number of Days =

Total Optional Pilot Vehicle(s) with Driver = $0.000

Price Each Optional Additional Construction Sign =

Number of Signs = 0

Total Optional Additional Construction Signs = $0.000

Price per Linear Foot for Abrading Existing Pavement Markings by the Contractor
with Work Zone Traffic Control by theNot Requested=/ LF

Total Linear Feet = 0.000

Total Abrading Existing Pavement Markings = $0.000

Price per Linear Foot for Joint Adhesive by the Contractor
with Work Zone Traffic Control by theNot Requested=/ LF

Total Linear Feet = 0.000

Total Joint Adhesive = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Optional Items (Cont'd):

Production Cold Milling

Price per Square Yard for Production Cold MillingNot Neededof
Bituminous Concrete with Hauling and Disposal by theNot Requested
and sweeping the milled surfaces by the Contractor=/ SY

Total Square Yards = 0.000

Total Production Cold Milling = $0.000

Production Cold Micromilling

Price per Square Yard for Production Cold Micromilling (depth less than 2") of
Bituminous Concrete with Hauling and Disposal by theNot Requested
and sweeping the milled surfaces by the Contractor=/ SY

Total Square Yards = 0.000

Total Production Cold Micromilling = $0.000

Mobilization Production Cold Milling and/or Micromilling

Price Milling Machine Mobilization per Project =

# of Milling Machines = 0

Total Milling / Micromilling Mobilization per Project = $0.000

Total Amount for Cold Milling/Micromilling plus Mobilization = $0.000

OCP Insurance =

Total Amount for Optional Items = $0.000

CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE CALCULATION

Project Name: Project #

Project's Total Cost including all the Price Adjustments for: Select / 20 0

Project's Total Cost including Price Adjustments = $0.000

Contractor Agrees to Supply Select

Contractor Agrees to Meet the Proposed Schedule by Authorized User Select

Contractor:

Print Name Date

Contractor's Signature

NOTE:

1. The Project's Total Cost shown above includes all the needed Price Adjustments for the month indicated (the month when the Quick Quote form is sent to the Contractor). If the project (or part of the project) is executed in a different month than the one used to calculate this Quick Quote, then the Project's Total Cost will change accordingly to reflect the Price Adjustments for the Month in which the project was actually performed (unless this happens outside of the contract period, see clause "Monthly Asphalt Price Adjustments" within the General Specifications document) .

2. The Contractor understands that at no time may a quick quote unit price (without the Price Adjustment) exceed the contract price. Materials cost, hauling expenses, etc., can be lowered by the Contractor any time during the quick quote process.

MonthsDaysYearMaterial Items #1Material Items #2Material Items #3Contractor
Select125Select from the drop-down menuSelect from the drop-down menu if Material #2 is neededSelect from the drop-down menu if Material #3 is neededSelect from the drop-down menu
January226302.01 - Bituminous Stabilized Course302.01 - Bituminous Stabilized Course302.01 - Bituminous Stabilized CoursePC70617 - All States Construction, Inc. dba Gorman Construction
February327404.03810218 - Miscellaneous Patching, F1 Asphalt Pavement404.03810218 - Miscellaneous Patching, F1 Asphalt Pavement404.03810218 - Miscellaneous Patching, F1 Asphalt PavementPC70618 - Alliance Asphalt, LLC
March4404.03820218 - Miscellaneous Patching, F2 Asphalt Pavement404.03820218 - Miscellaneous Patching, F2 Asphalt Pavement404.03820218 - Miscellaneous Patching, F2 Asphalt PavementPC70619 - Asphalt Supply of Long Island, LLC
April5404.03830218 - Miscellaneous Patching, F3 Asphalt Pavement404.03830218 - Miscellaneous Patching, F3 Asphalt Pavement404.03830218 - Miscellaneous Patching, F3 Asphalt PavementPC70620 - Barre Stone Products, Inc.
May6404.03890218 - Miscellaneous Patching, F9 Asphalt Pavement404.03890218 - Miscellaneous Patching, F9 Asphalt Pavement404.03890218 - Miscellaneous Patching, F9 Asphalt PavementPC70621 - Barrett Paving Materials, Inc.
June7404.0589 - Shim Course, 80 Series Compaction, F9 Asphalt Pavement404.0589 - Shim Course, 80 Series Compaction, F9 Asphalt Pavement404.0589 - Shim Course, 80 Series Compaction, F9 Asphalt PavementPC70622 - Black Gold Industries, Inc.
July8404.0681 - 6.3 Top, 80 Series Compaction, F1 Asphalt Pavement404.0681 - 6.3 Top, 80 Series Compaction, F1 Asphalt Pavement404.0681 - 6.3 Top, 80 Series Compaction, F1 Asphalt PavementPC70623 - Broome Bituminous Products, Inc.
August9404.0682 - 6.3 Top, 80 Series Compaction, F2 Asphalt Pavement404.0682 - 6.3 Top, 80 Series Compaction, F2 Asphalt Pavement404.0682 - 6.3 Top, 80 Series Compaction, F2 Asphalt PavementPC70624 - Broome-Tioga Bituminous Products, Inc.
September10404.0683 - 6.3 Top, 80 Series Compaction, F3 Asphalt Pavement404.0683 - 6.3 Top, 80 Series Compaction, F3 Asphalt Pavement404.0683 - 6.3 Top, 80 Series Compaction, F3 Asphalt PavementPC70625 - Callanan Industries, Inc.
October11404.0981 - 9.5 Top, 80 Series Compaction, F1 Asphalt Pavement404.0981 - 9.5 Top, 80 Series Compaction, F1 Asphalt Pavement404.0981 - 9.5 Top, 80 Series Compaction, F1 Asphalt PavementPC70626 - Cambria Asphalt Products, Inc.
November12404.0982 - 9.5 Top, 80 Series Compaction, F2 Asphalt Pavement404.0982 - 9.5 Top, 80 Series Compaction, F2 Asphalt Pavement404.0982 - 9.5 Top, 80 Series Compaction, F2 Asphalt PavementPC70627 - Chenango Concrete Corporation
December13404.0983 - 9.5 Top, 80 Series Compaction, F3 Asphalt Pavement404.0983 - 9.5 Top, 80 Series Compaction, F3 Asphalt Pavement404.0983 - 9.5 Top, 80 Series Compaction, F3 Asphalt PavementPC70628 - Cobleskill Stone Products, Inc.
14404.1281 - 12.5 Top or Binder, 80 Series Compaction, F1 Asphalt Pavement404.1281 - 12.5 Top or Binder, 80 Series Compaction, F1 Asphalt Pavement404.1281 - 12.5 Top or Binder, 80 Series Compaction, F1 Asphalt PavementPC70629 - Colarusso Blacktop a division of A. Colarusso & Son, Inc.
15404.1282 - 12.5 Top or Binder, 80 Series Compaction, F2 Asphalt Pavement404.1282 - 12.5 Top or Binder, 80 Series Compaction, F2 Asphalt Pavement404.1282 - 12.5 Top or Binder, 80 Series Compaction, F2 Asphalt PavementPC70630 - County Line Stone Co., Inc.
16404.1283 - 12.5 Top or Binder, 80 Series Compaction, F3 Asphalt Pavement404.1283 - 12.5 Top or Binder, 80 Series Compaction, F3 Asphalt Pavement404.1283 - 12.5 Top or Binder, 80 Series Compaction, F3 Asphalt PavementPC70631 - Cushing Stone Co., Inc.
17404.1989 - 19.0 Binder, 80 Series Compaction, F9 Asphalt Pavement404.1989 - 19.0 Binder, 80 Series Compaction, F9 Asphalt Pavement404.1989 - 19.0 Binder, 80 Series Compaction, F9 Asphalt PavementPC70632 - Dalrymple Gravel & Contracting Co., Inc.
18404.2589 - 25.0 Binder, 80 Series Compaction, F9 Asphalt Pavement404.2589 - 25.0 Binder, 80 Series Compaction, F9 Asphalt Pavement404.2589 - 25.0 Binder, 80 Series Compaction, F9 Asphalt PavementPC70633 - Dolomite Products Company, Inc.
19PC70634 - East Island Asphalt Corp.
20PC70635 - Elmira Road Materials, LLC
21PC70636 - Gernatt Asphalt Products, Inc.
22PC70637 - Heidelberg Materials Northeast-NY, LLC
23PC70638 - HH Rauh Paving, Inc.
24PC70639 - Holcim Quarries NY, Inc.
25PC70640 - J.E. Sheehan Contracting Corporation
26PC70641 - Jamestown Macadam, Inc.
27PC70642 - Jocar Asphalt, LLC dba Rason Materials
28PC70643 - Jointa Lime Company
29PC70644 - Kings Park Materials, LLC
30PC70645 - Lydel Brookhaven Corp.
31PC70646 - Monticello Black Torp Corp.
PC70647 - Morlyn Asphalt Corp.
PC70648 - New Castle Asphalt, LLC
PC70649 - New Enterprise Stone & Lime Co., Inc.
PC70650 - Northern Asphalt, LLC
PC70651 - NY Materials, LLC
PC70652 - Pallette Stone Corporation
PC70653 - Peckham Materials Corp.
PC70654 - Posillico Materials, LLC
PC70655 - Posillico Materials East, LLC
PC70656 - Pro Asphalt, LLC
PC70657 - Rason Materials, Inc.
PC70658 - RCA Asphalt, LLC
PC70659 - Scatt Materials Corp.
PC70660 - Seneca Stone Corporation
PC70661 - Shelby Crushed Stone, Inc.
PC70662 - Spallina Materials, Inc.
PC70663 - Suit-Kote Corporation
PC70664 - Tetz Asphalt, LLC
PC70665 - T.H. Kinsella, Inc.
PC70666 - Thalle Industires, Inc.
PC70667 - Tilcon New York, Inc.
PC70668 - Tri-City Highway Products, Inc.
PC70669 - Troy Sand and Gravel Co., Inc.
PC70670 - Unique Paving Materials Corp.
PC70671 - Upstone Materials, Inc.
PC70672 - Vestal Asphalt, Inc.
PC70673 - William E. Dailey, Inc.

NOTE:

1. The Project's Total Cost to be shown below includes all the needed Price Adjustments for the month indicated (the month when the Quick Quote form is sent to the Contractor). If the project (or part of the project) is executed in a different month than the one used to calculate this Quick Quote, then the Project's Total Cost will change accordingly to reflect the Price Adjustments for the Month in which the project was actually performed (unless this happens outside of the contract period, see clause "Monthly Asphalt Price Adjustments" within the General Specifications document) .

2. The Contractor understands that at no time may a quick quote unit price (without the Price Adjustment) exceed the contract price. Materials cost, hauling expenses, etc., can be lowered by the Contractor any time during the quick quote process.

NOTE: Production Cold Milling and Production Cold Micromilling

1. When choosing the option "Hauling and Disposal by the Authorized User", the Authorized User will provide trucks (and drivers) for hauling of Production milled material while the Contractor is responsible for project clean-up including sweeping milled surfaces. Material removed during milling operations, including foreign debris (if any) within or on the pavement, shall remain the property of the Authorized User, and shall be disposed of by the Authorized User at its discretion.

2. When choosing the option "Hauling and Disposal by the Contractor", the Contractor will provide trucks for hauling of Production milled material and will be responsible for project clean-up including stockpiling milled materials and sweeping milled surfaces. Material removed during milling operations, including foreign debris within or on the pavement, shall be the property of the Contractor and shall be disposed of at a site obtained by the Contractor.

Price Adjustment Instructions

GROUP - 31502 - COMPREHENSIVE BITUMINOUS CONCRETE

(Asphalt Mix and Cold Patch) (Statewide)

ASPHALT MIX - AWARD# 23371

INSTRUCTIONS - HOW TO FIND THE PRICE ADJUSTMENT INFORMATION
STEPS
1In order to access the Price Adjustment information that OGS publishes every month for the duration of the contract, please go to the link below and follow the instructions outlined through the steps.
https://ogs.ny.gov/award-23371
2The above link takes you to the contract's landing page (see right picture).
There, you can access all the documents related to this contract.

Click on the "Price Adjustments" link.

This will direct you to the Price Adjustments Page.

3 From the Price Adjustments Page, click on the link related to this award # (award link will look different as it will contain this award's actual Price Adjustment worksheet - highlighted information will remain the same), which takes you to the actual Price Adjustment excel sheet (it will ask you to open it or save it in your computer).

4 To calculate the two Price Adjustments for Asphalt Mix items (the Monthly Price Adjustment and the PPI Price Adjustment), we need information from two separate tables (Table 1 and Table 2).

Both can be found on the Price Adjustment sheet.

Make sure to select the right month at the bottom, (the month when the Quick Quote will be sent)

First, we need the information for the Monthly Price Adjustment:
Table 1 - Asphalt Mix Items -
Monthly Price Adjustments - (Statewide Contract) - Part 1 of 2
Within Table 1, we need to find the Item number that we are including in our Quick Quote.
For example, if the item we are requesting in our Quick Quote is

Item number "404.058901 - Shim Course F9, Asphalt", then, we look for that same Item number and the price adjustment/ton (see picture at right).

5 This would be the value we need to enter in section

a) - "Monthly Asphalt Price Adjustment per Ton" of our Quick Quote (see picture at right) 6 Now we need the information for the PPI Price Adjustment.

For that, we need to find Table 2.

Table 2 - Hot Mix Asphalt Items -
Periodic PPI Price Adjustments - Part 2 of 2
Within Table 2, we also need to find the Item number that we are including in our Quick Quote.
Back to our example,

for Item number "404.058901 - Shim Course F9, Asphalt",

we now need to find two values:
Difference (100% Material Minus Total % Asphalt Plus Fuel Allowance) & Quarterly PPI Price Adjustment Percentage

(see picture at right).

7Within our Quick Quote example, now we have the values for the last two sections:
b) - Quarterly PPI Price Adjustment Percentage (%)
c) - Difference of 100% Material Minus Total % Asphalt

plus Fuel Allowance

(see picture at right).
8And we are done.
If we were requesting prices for a second and/or third material item, we would repeat the same steps to get the proper price adjustment information for those specific material items we are requesting.
Important Note:

The User and the Contractor understand that the Project's Total Cost within the Quick Quote includes all the needed Price Adjustments for the month indicated by the User (the month when the Quick Quote form is sent to the Contractor).

If the project (or part of the project) is executed in a different month than the one used to calculate the Quick Quote, then the Project's Total Cost will change accordingly to reflect the Price Adjustments for the Month in which the project (or part of the project) was actually performed.

https://ogs.ny.gov/award-23371 image1.png image2.png image3.png image4.png image5.png image6.png

File details come from the government source that posted it. Updated .