This is a Request for Proposals (RFP) issued by the New Jersey Housing and Mortgage Finance Agency (NJHMFA) for licensed electrical contractors to provide maintenance, repairs, and installation services on an as-needed basis for two agency-owned buildings located at 637 South Clinton Avenue and 650 South Broad Street in Trenton, New Jersey. The 637 South Clinton Avenue building contains eight electrical closets, while the 650 South Broad Street building contains four electrical closets and two hydraulic elevators. Services include emergency main breaker service, wiring and outlet installation, ballast replacement, electrical panel work, General Electric Switchgear troubleshooting and repair, light fixture and emergency light repair, and duct smoke detector repair in HVAC systems. The RFP was issued on January 26, 2026, with a bid submission deadline of March 4, 2026, at 11:00 AM through the Agency's Procurement Portal. A pre-bid site visit/meeting is available for bidders to obtain valuable information. The initial contract term is one year, with the Agency's option to renew for two additional two-year terms. The contractor must be a licensed New Jersey electrical contractor with minimum five years of relevant experience, experience with Lutron Electronic Lighting Systems, and capability to work on 480-volt 277 systems. Response time requirements include phone contact within one hour and on-site personnel within 24 hours for regular service calls and within three hours for emergency calls.
Pricing will be evaluated as 50 percent of the bid evaluation criteria, with experience and qualifications each weighted at 25 percent. The contractor must submit firm fixed prices based on prevailing wage rates established by the Department of Labor and Workforce Development, with an upcharge rate percentage over prevailing wage to be held firm for the contract duration and any extensions. All labor, materials, permits, and equipment are the contractor's responsibility, with the Agency retaining the right to approve materials and provide materials if desired. Invoices must detail labor charges and materials at actual contractor cost plus the submitted markup percentage, with copies of supplier invoices required. The contractor must maintain Workers' Compensation insurance with statutory limits, General Liability Insurance of at least $1,000,000 per occurrence and $2,000,000 aggregate, Umbrella/Excess Liability Insurance of $5,000,000, Automotive Liability Insurance of $1,000,000, Professional Liability Insurance of at least $2,000,000, and Cyber Liability Insurance of $1,000,000. A bid guarantee of 10 percent of the total price (not exceeding $20,000), performance bond, payment bond, and maintenance bond are required. The contractor must comply with New Jersey Prevailing Wage Act requirements, Public Works Contractor Registration Act, Equal Employment Opportunity provisions, and various state and federal regulations including the Americans with Disabilities Act and Buy American provisions. Payment will be made within 60 calendar days of invoice receipt or goods/services acceptance, whichever is later.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-EXHIBIT H - Cost Sheet.pdf | ||
| 4-Notice to Bidders.pdf | ||
| 1-Fillable Exhibits A - G Rev 03-07-24.pdf | ||
| 5-Submission Instructions - 2025-073.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals
For
RE-BID ELECTRICAL CONTRACTOR
Issue Date: January 26, 2026
DUE DATE:
March 4, 2026
Time: 11:00 AM
Location: NJHMFA
New Jersey Housing and Mortgage Finance Agency
637 South Clinton Avenue, P.O. Box 18550
Trenton, New Jersey 08650-2085
NEW JERSEY HOUSING AND MORTGAGE FINANCE AGENCY
REQUEST FOR PROPOSALS
FOR
TABLE OF CONTENTS
• INFORMATION FOR BIDDERS
• DEFINITIONS
• SCOPE OF SERVICES
• INSURANCE
• SPECIFIC SUBMISSION REQUIREMENTS
• ADDITIONAL INFORMATION FOR BIDDERS
• PROJECT TERM AND TERMINATION
• CONFLICTS OF INTEREST
• BID SECURITY AND BONDING REQUIREMENTS
• PRICE AND PAYMENT
• APPLICABLE LAW
• MISCELLANEOUS
Appendix 1 – HMFA Standard Contract
Appendix 2 – HMFA Summary Contract Addendum
Appendix 3 – Information & Instructions for completing the “Two-Year Vendor Certification and Disclosure of
Political Contributions” Form
Exhibits A through I
REQUEST FOR PROPOSALS
FOR
1.0
2.0
INFORMATION FOR BIDDERS
1.1 Background
The New Jersey Housing and Mortgage Finance Agency (hereinafter referred to as the “Agency” or
“NJHMFA”) is an independent state agency, whose primary mission is to provide funding for affordable home ownership and housing opportunities for New Jersey residents. The Agency is a strong, unified advocate for housing production, financing and improvement. It accomplishes its mission by responding to the needs of its residents by implementing creative programs and establishing alliances that fund affordable home mortgages for first-time home buyers; promoting construction and rehabilitation of rental housing; encouraging mixed-income, owner-occupied housing growth as a means to stabilize neighborhoods; advancing the growth and development of municipalities; contributing to the quality of life of older adults, the disabled and those with special housing needs; and formulating partnerships to foster the economic development of New Jersey and the personal development of its residents.
1.2 Purpose and Intent
The New Jersey Housing and Mortgage Finance Agency (hereinafter referred to as the “Agency”) is seeking proposals from Licensed Electrical Contractors to perform electrical maintenance, repairs and installation services on an “as needed”, “as requested” basis for two Agency-owned and occupied buildings.
These buildings are located at 637 S. Clinton Avenue and 650 S. Broad Street, Trenton, NJ 08611. The awarded contract will be for an initial term of one (1) year, with the Agency’s option to renew the contract for two (2) additional two (2) year terms.
The building at 637 S. Clinton Avenue contains eight (8) electrical closets; the building at 650 S. Broad
Street contains four (4) electrical closets and has two (2) hydraulic elevators.
DEFINITIONS
2.1 General Definitions
Addendum – Written clarification or revision to this RFP issued by the New Jersey Housing and
Mortgage Finance Agency.
Agency Program Administrator - Individual responsible for the overall management and administration of the contract.
Bidder – An individual or business entity submitting a bid proposal in response to this RFP.
Contract – This RFP, any Addendum to this RFP, the Bidder’s proposal submitted in response to this
RFP, as accepted by the Agency, and the signed Agreement, a copy of which is attached to this RFP in substantially final form as Appendices 1 and 2.
Contractor – The Bidder awarded a Contract resulting from this RFP.
Evaluation Committee – A committee established by the Agency to review and evaluate bid proposals submitted in response to this RFP and to recommend a Contract award.
Firm Fixed Price – A price that is all-inclusive of direct cost and indirect costs, including, but not limited to, direct labor costs, overhead, fee or profit, clerical support, equipment, materials, supplies, managerial
(administrative) support, all documents, reports, forms, travel, reproduction and any other costs. No additional fees or costs shall be paid by the Agency unless there is a change in the scope of work.
May – Denotes that which is permissible, not mandatory.
New Jersey Housing and Mortgage Finance Agency (the “Agency” or “NJHMFA”) – The entity that has issued this RFP and will enter into a Contract.
Notice of Intent to Terminate – The notice issued by a Party to the other Party expressing its intention to terminate the Agreement.
Performance and Payment Bonds – The Performance Bond secures the contractor's promise to perform the contract in accordance with its terms and conditions, at the agreed upon price, and within the time allowed. The Payment Bond protects laborers, material suppliers and subcontractors against nonpayment.
Project – The undertaking of services that are the subject of this RFP.
Request for Proposals (“RFP”) – This document which establishes the bidding and Contract requirements and solicits bid proposals to meet the needs of the Agency as identified herein.
Shall or Must – Denotes that which is a mandatory requirement. Failure to meet a mandatory requirement will result in the rejection of a bid proposal as materially non-responsive.
Should – Denotes that which is recommended, not mandatory.
Subtasks – Detailed activities that comprise the actual performance of a task.
Subcontractor – An entity having an arrangement with an Agency Contractor, where the Agency
Contractor uses the products and/or services of that entity to fulfill some of its obligations under its
Contract, while retaining full responsibility for the performance of all of its [the Contractor's] obligations under the Contract, including payment to the Subcontractor. The Subcontractor has no legal relationship with the Agency, only with the Contractor.
Task – A discrete unit of work to be performed.
Vendor – A supplier of any good or service.
2.2 RFP Specific Definitions
DLWD – The Department of Labor and Workforce Development.
HVAC – Heating, Ventilation, and Air Conditioning.
Shift Differential – Shall refer to pay adjustments above prevailing wage allowed when working shifts other than normal working hours. The Agency must verify the allowance, requirements and amount of differential pay with DLWD Prevailing Wage rate guidelines.
Upcharge Rate – The percentage the bidder will charge the Agency over the current prevailing wage as listed on the DLWD’s website including, but not limited to, direct labor costs, overhead, fee or profit, https://www.lawinsider.com/clause/the-notice https://www.lawinsider.com/clause/by-a-party https://www.lawinsider.com/dictionary/other-party https://www.lawinsider.com/clause/expressing https://www.lawinsider.com/clause/intention https://www.lawinsider.com/clause/terminate https://www.lawinsider.com/clause/the-agreement clerical support, equipment, materials, supplies, managerial (administrative) support, all documents, reports, forms, travel, reproduction and any other costs. No additional fees or costs shall be paid by the
Agency unless there is a change in the scope of work. This percentage must be held firm for the life of the contract and any extensions thereof.
3.0 SCOPE OF SERVICES
The successful Contractor shall be required to provide general commercial building electrical services on an “as requested”, “as needed” basis. Some tasks will be of a scheduled nature and other tasks may be of an emergency nature. The Agency does not represent it will utilize the successful Contractor’s services any guaranteed number of times over the course of this contract.
3.1 Required services may include, but are not limited to:
• Emergency main breaker service
• Installation of additional wiring and outlets
• Ballast replacement
• Add, change, move or remove electrical outlets
• Work on electrical panels
• Troubleshoot and repair General Electric Switchgear
• Replace, move and/or repair light fixtures and emergency lights
• Repair and/or replace duct smoke detectors in the HVAC System
3.2 The Contractor must:
• Have experience working on/repairing Lutron Electronic Lighting Systems.
• Be able to work on 480 volt 277 systems.
• Supply all tools and equipment to perform the work required. This includes having the necessary equipment to work in buildings with high ceilings (at least 50 feet).
• Safeguard their own materials, tools, and equipment. The Agency shall not be responsible for vandalism or theft of materials, tools, or equipment.
• Respond to request for service via phone call within one hour and have personnel on site within
24 hours of normal service call. All regular service calls will be handled Monday through Friday during normal business hours (7:30 a.m. – 5:00 p.m.), unless otherwise specified.
• Respond to request for service via phone call within one hour and have personnel on site within three hours of notification of an emergency service call.
• Provide contact information with an emergency office phone number and cell phone number
3.3 Regulations
All work shall comply with all applicable federal, state, local or other laws and regulations.
The New Jersey Prevailing Wage Act (P.L. 1963, Chapter 150) and provisions of the State Labor Laws must be complied with by the Contractor. All prices quoted shall include compliance with these laws.
All Contractors performing services for the Agency must comply with all Occupational Safety and Health
Administration (OSHA), State and County Safety and Occupational Health Standards and all other applicable rules and regulations. The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. Also, Contractor will be held responsible for any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area.
All work must be in accordance with the NEC (National Electrical Code).
3.4 Time and Material
The Contractor shall furnish all labor, materials, permits (as required), services, insurance, and equipment necessary for the performance of the work included in these specifications unless stated otherwise. The materials and supplies to be used shall meet the manufacturers’ specifications for the equipment. The
Contractor must provide a list giving the name of the manufacturers, the brand name and the intended use of each of the materials that they propose to use in the performance of the work unless the work is being provided in an emergency situation. This list must be in writing and provided to the Facilities Maintenance
Manager or Director of Operations prior to the commencement of any work. The Facilities Maintenance
Manager or Director of Operations must approve by signature all recommended parts. The Contractor will not use any materials which the Facilities Maintenance Manager or Director of Operations determines would be unsuitable for the purpose or harmful to equipment. The Agency will only pay for materials that have been authorized and used. The Agency reserves the right to provide materials and supplies.
3.5 Price Quotations
Quotes requested for any task shall include a cost breakdown submitted by the Contractor as follows:
labor rate, quantity of hours, materials list and cost. Each task shall generate a separate invoice detailing the labor charge and the parts/materials as detailed below. All (final) invoices submitted by the Contractor shall also follow this format.
All parts and materials necessary for services shall be invoiced at actual Contractor cost (tax excluded), plus the percentage (%) mark-up submitted on the Cost Sheet (Exhibit H). Copies of the Contractor’s own supplier’s invoice reflecting the actual Contractor cost shall accompany each invoice to the Agency.
Billing time begins when worker(s) arrive at site and ends when worker(s) leave site. No charge for travel time will be honored. In accordance with Agency procedures, workers will be required to sign in and out.
3.6 Accident Prevention
The Contractor shall be responsible to provide for the safety of all persons, buildings and equipment on or around work areas and shall implement all necessary safety measures. Conduct which creates unsafe or unhealthy conditions for building occupants or places property in undo jeopardy are prohibited.
3.7 Debris and Clean-up
It is the Contractor’s responsibility to provide for the removal of all discarded materials, new or used, from the job site, to keep the job site and surrounding area clean and to clean all areas after completion of task.
3.8 Scheduling, Workmanship and Inspection
All tasks under the resulting contract shall be performed in a skillful and workmanlike manner. The
Contractor shall make necessary arrangements with the Facilities Maintenance Manager or Director of
Operations and schedule tasks so that the minimum amount of interference with usual Agency business activities will result.
All tasks shall be inspected by Facilities Maintenance or Designee to verify completion of task. All tasks deemed unsatisfactory shall be promptly corrected and made acceptable to the Facilities Maintenance or
Designee. Any inspection by the Agency does not relieve the Contractor from any responsibility regarding defects or other failures to meet the contract requirements.
The Contractor shall require his/her employees to comply with instructions pertaining to conduct and building regulations. The Agency may, in writing, require the Contractor to remove any employee that the
Agency deems incompetent or careless.
3.9 Permits
The successful Contractor shall apply for any and all required permits and shall be responsible for obtaining final inspection approval when necessary. The Contractor will be reimbursed for any required permits. Permits must be obtained from: Department of Community Affairs, Division of Codes, 101 S.
Broad Street, Trenton, NJ. Telephone number: 609-984-7865
3.10 Guarantee
The Contractor shall guarantee all workmanship and parts furnished and installed under this contract against defects for a minimum of one (1) year beginning after acceptance by the Agency. Defects will be repaired or replaced at no charge to the Agency.
3.11 Exemption from Taxes
The Agency is exempt from State Sales Tax and Federal Excise Tax. Tax Exemption Certificates indicating the Agency’s tax-exempt status shall be furnished by the Agency to the successful Contractor.
3.12 Communication
At least one on-site worker who has supervision authority must be conversant in the English language.
This is necessary because of the need to read labels, provide job instructions, ensure compliance with safety regulations and communicate with Agency staff. The Agency will be sole judge of the communication level of the Contractor’s employees. Failure to have an English-speaking worker on each job is cause to halt task until the situation is remedied. Should this happen, it will be at no additional cost to the Agency.
3.13 Wage (Trade) Determination – Electrician
Electrician is the craft/trade which contractors are to use to determine the appropriate prevailing wage set forth by the Department of Labor and Workforce Development (“DLWD”) for all electrical repair and maintenance required by this RFP.
It is the responsibility of the Contractor to make payments to their employees in accordance with the
Department of Labor and Workforce Development’s Prevailing Wage Rate Determination for the affected trade. This provision must be taken into consideration when submitting bid prices.
3.14 Work Hours
The following work hours shall apply to this contract: Regular Hours: Monday through Friday consisting of 8 hours starting between 6:00 AM and 10:00 AM Overtime Hours: Monday through Friday in excess of an 8-hour regular work day and Saturday Premium Time Hours: Sundays and Holidays.
3.15 Holiday/ Premium Pay Rate
For payment purposes, only the following days listed below will be treated as Holiday/Premium payrate.
Work performed on all other State Holidays or State Paid Days Off, such as snow days, will be treated as regular work days. Any hours worked by the Contractor to be billed at an hourly rate on these regular work days will be paid at straight hourly rates.
A. New Year's Day
B. President's Day
C. Memorial Day
D. Juneteenth Day
E. Independence Day
F. Labor Day
G. Election Day
H. Veterans Day
I. Thanksgiving Day
J. Christmas Day
These recognized holidays are subject to change based upon Legislative approval or other directives.
Should a holiday fall on a weekend, the day designated by the State shall be recognized as the holiday.
3.16 Shift Differentials
The Agency shall pay the Contractor in accordance the DLWD rates for the trade(s) being utilized. A shift differential can only be paid to an employee who has worked five (5) consecutive days outside of the normal work hours.
3.17 Performance Review
All work will be inspected by the Facilities Maintenance Manager and/or Director of Operations to verify completion. All work unsatisfactorily performed must be promptly corrected and made acceptable to the
Facilities Maintenance Manager and/or Director of Operations.
4.0 INSURANCE
4.1 Contractor’s Insurance
The Contractor must assume all risks connected with their work. The Contractor shall comply with all
State laws and regulations concerning Workers’ Compensation and shall maintain such insurance as will protect him/her against all claims for damages for personal injury, including death, which may arise during the performance of the Contract, either by him/her or by any Subcontractor or anyone directly or indirectly employed by either of them. Any insurance company providing Workers’ Compensation coverage must be authorized to do business in the State of New Jersey and must have a minimum Financial Strength
Rating of A- and with a minimum Financial Size Category of VIII per A. M. Best Company.
The Contractor shall provide the Agency with current Certificates of Insurance for Workers’
Compensation coverages and renewals thereof. Certificates of Renewal shall be provided to the Agency within thirty (30) days of expiration of such insurance.
The Contractor shall further comply with all Insurance Requirements in Section 4.2 of this RFP. Any and all insurance coverages shall be with an insurance company authorized to do business in the State of New
Jersey and must have a minimum Financial Strength Rating of A- and with a minimum Financial Size
Category of VIII per A. M. Best Company.
The Agency shall be named an ADDITIONAL INSURED on the General Liability and Cyber Liability policies and the Contractor shall provide to the Agency Certificates of Insurance and Policy Endorsements evidencing same. Insurance coverages shall remain in effect until the Contract is completed or the project is accepted by the Agency, and at all times thereafter when the Contractor may be removing or replacing defective work.
The Contractor shall not commence work under the Contract until the Contractor has obtained all insurance as required and such insurance has been approved by the Agency in writing, nor shall the
Contractor allow any Subcontractor to commence work, in his/her subcontract until all similar insurance required of the Subcontractor has been so obtained and approved by the Agency in writing.
The Contractor’s insurance shall apply to and provide coverage for all Subcontractors and/or suppliers unless the Contractor forwards to the Agency the Certificate of Insurance for the Subcontractor and/or supplier in which case all insurance applicable to the Subcontractor and/or supplier shall fully comply with all insurance requirements applicable to the Contractor and shall be subject to the approval by the
Agency in writing.
The Contractor, or the Subcontractor and/or supplier if applicable, shall give the Agency thirty (30) days written notice of any material change in, cancellation of, or expiration of the policies.
4.2 Insurance Requirements
The following are mandatory minimum insurance requirements, if indicated by an (X) shall be applicable to this Contract and shall provide for, but are not limited to the following coverages. Certificates of Insurance and applicable Policy Endorsements for those policies required below shall be submitted by the successful Contractor. Such coverages shall be with an insurance company authorized to do business in the State of New Jersey and shall have a minimum Financial
Strength Rating of A- and with a minimum Financial Size Category of VIII per A. M. Best
Company and shall name the Agency as an Additional Insured, with the exception of Workers’
Compensation Insurance and Professional Liability coverages. A Waiver of Subrogation, in favor of the Agency, shall be included on all policies unless inclusion is not allowed by state law.
ACORD 25 forms “Certificates of Liability Insurance” may be utilized to provide evidence of
General Liability, Cyber Liability, Workers’ Compensation coverages and Professional Liability policies as are applicable. All applicable information on the ACORD 25 must be completed and information noted must reflect actual terms and conditions as contained in the underlying policies and be in conformity with the New Jersey Certificates of Insurance Act (N.J.S.A. 17:29A-54 et seq.).
ACORD 25 “Certificates of Liability Insurance” forms are to indicate the Agency as the Certificate
Holder as follows:
New Jersey Housing and Mortgage Finance Agency
ATTN: Insurance Division PO Box 18550
Trenton, NJ 08650-2085
Copies of Policy Endorsements which effectuate the Additional Insured status of the Agency with respect to General Liability and Cyber Liability Insurance shall be provided.
Worker's Compensation Insurance
Workers’ Compensation and Employers’ Liability. This insurance shall be maintained in force during the life of the Contract covering all employees engaged in performance of the Contract pursuant to N.J.S.A. 34:15-12(a) and N.J.A.C. 12:235-1.6. Coverage A limit is Statutory and
Coverage B limits are $500,000 per occurrence; $500,000 per employee disease limit and $500,000 policy limit for disease. If the Contractor or Subcontractor is a Sole Proprietor, Partnership or
Limited Liability Company, the sole proprietor, partners or members shall be included in the coverage.
General Liability Insurance
General Liability Insurance shall be provided with limits of not less than $1,000,000 per occurrence and $2,000,000 General Aggregate and shall be maintained in full force during the life of the Contract.
X
Agency to be named as an Additional Insured. Contractual Liability that will respond to the Indemnification
Clause in the Contract shall be included.
Umbrella/Excess Liability Insurance
Umbrella/Excess Liability Insurance shall be provided with limits of not less than $5,000,000 per occurrence and $5,000,000 General Aggregate and shall be maintained in full force during the life of the Contract. Umbrella/Excess Liability coverages shall be in addition to required General
Liability coverages. Agency to be named as an Additional Insured. Contractual Liability that will respond to the Indemnification Clause in the Contract shall be included.
Automotive Liability Insurance
Automotive Liability Insurance Covering Contractor for claims arising from owned, hired and non-owned vehicles with limits of not less than $1,000,000 combined single limit shall be maintained in full force during the life of the Contract. Agency to be named as an Additional Insured.
Professional Liability Insurance
Errors and Omissions, Professional Liability Insurance and/or Professional Liability Malpractice
Insurance to protect the Contractor from any liability arising out of the professional obligations performed, shall be maintained in full force during the life of the Contract. The insurance shall be in the amount of not less than $2,000,000 on an unimpaired basis and with a deductible not exceeding $50,000. If the Contractor has Professional Liability Insurance coverages which exceed the minimum requirements noted herein, those actual policy coverage limits shall apply. In instances where the Contractor has a deductible in excess of $50,000, the Agency may consider acceptance of same subject to the review by the Agency of the most recent Certified Financial Statements of the Contractor to determine the financial wherewithal of the Contractor to fund a deductible in excess of $50,000. If the Contractor has claims-made coverage and subsequently changes carriers during the term of the Contract, Contractor shall obtain from its new carrier an endorsement for retroactive coverage with a Retroactive Date that predates the start of the Contract.
Cyber Liability Insurance Cover
Cyber Liability Insurance Cover shall be provided with limits on an unimpaired basis of not less than
$1,000,000 per occurrence and $1,000,000 General Aggregate and shall be maintained in full force during the life of the Contract. Agency to be named as an Additional Insured. Coverage shall include data breach, privacy crisis management, multimedia liability, extortion and network security liability. If the Contractor has claims-made coverage and subsequently changes carriers during the term of the Contract, Contractor shall obtain from its new carrier an endorsement for retroactive coverage with a Retroactive Date that predates the start of this Contract.
The New Jersey Housing and Mortgage Finance Agency (NJHMFA) reserves the right to specify alternative insurance requirements in Contract/Agreement language on a case by case basis so long as such alternative insurance requirements are substantively consistent with the intent of NJHMFA’s insurance requirements hereinabove, as NJHMFA shall determine in its sole discretion, and shall not, in any instance, be in conflict with or in violation of any and all applicable State Statutes and/or
Administrative Code Regulations.
X
5.0 SPECIFIC SUBMISSION REQUIREMENTS
5.1 The purpose of the following requirements is to assist the Agency in determining the ability of a Bidder to provide the services described in this RFP. All items listed below must be included with your proposal. Please follow the organization and numbering below when preparing and submitting your proposal. An Evaluation Committee will review all submissions to determine if the RFP requirements are satisfied. Proposals that do not include the information requested may be considered non-responsive.
Bidder must supply the following:
1. A list of technicians who will be assigned to this contract detailing their relevant experience. (Workforce must have minimum of five (5) years of relevant experience) • Please include name and title of person who will be responsible for overseeing this contract
2. A detailed listing of contracts of similar size and scope
3. Copy of current Electrical License issued by the State of New Jersey
4. Copy of Public Works Contractor Registration Certificate (must be submitted prior to award of contract)
While not a mandatory requirement, Bidders are encouraged to include copies of Computer Networking
Certifications and/or any certifications they deem relevant to this project.
5.2 Bid Evaluation Criteria
The following evaluation criteria will be used to evaluate, score and rank bid proposals received in response to this RFP. Proposals shall first be reviewed for completeness and shall then be evaluated, scored and ranked. The criteria and specific weighting are as follows:
Experience 25
Qualifications 25
Cost 50
6.0 ADDITIONAL INFORMATION FOR BIDDERS
6.1 Key Events
6.1.1 Pre-Bid Meeting/Site Visit (if required by requesting Division)
A pre-bid site visit/meeting will be held for bidders on DATE & TIME at the New Jersey Housing and Mortgage Finance Agency located at 637 South Clinton Avenue, Trenton, New Jersey.
Please email: Procurement-Mailbox@njhmfa.gov to advise of your attendance. It is strongly recommended that all Bidders attend to obtain valuable information that can help to ensure the completeness and accuracy of all bids and eliminate any discretionary decisions by bidders that could impact the outcome of a Contract award (Exhibit I).
6.1.2 Bid Opening
All bids must be submitted electronically through the Agency’s Procurement Portal at https://njhmfa.bonfirehub.com by 11:00 AM on, March 4, 2026 to be considered. For sufficient time, it is strongly recommended that the uploading process and finalizing of the bid submission documents begin at least ONE (1) day before the bid opening time. No bids will be received after the bid opening date and time. Only those bids submitted electronically will be accepted.
The Agency reserves the right to reject any and all bids for any reason including but not limited to the Agency’s determination of cost vs. benefit.
mailto:Procurement-Mailbox@njhmfa.gov https://njhmfa.bonfirehub.com/
The Agency reserves the right to request any and all information which may assist in making a
Contract award, including information or documentation related to the bidder’s financial capabilities to perform the Contract. The Agency also reserves the right to request from any bidder a detailed explanation of a bid price.
It is highly improper for a Bidder, after bid opening, to contact a staff member of the
Procurement division or Agency to discuss the bids. Should there be any questions concerning the bid(s) submitted, the Bidder will be contacted in writing by a member of the
Procurement staff.
6.2 Questions and Inquiries
It is the policy of the Agency to accept questions and inquiries from all potential Bidders receiving this
RFP. Questions must be submitted electronically at https://njhmfa.bonfirehub.com through the Agency’s
Procurement Portal.
6.3 Question Protocol
Questions should be directly related to the RFP by the Bidder. Questions should be asked in consecutive order, from beginning to end, following the organization of the RFP. Each question should begin by referencing the RFP page number and section number to which it relates.
6.4 Cut-Off Date for Questions and Inquiries
All questions and inquiries relating to this RFP must be received by 2:00 PM (Eastern Standard Time) on
February 11, 2026. Questions received after this time will not be acknowledged or considered.
6.5 Revisions to the RFP
Only written modifications issued via Addendum are considered to be alterations to the RFP. Oral comments are not binding. An Addendum will be issued by the Agency for any revisions, modifications, clarifications or alterations to the RFP and will become part of the final Contract resulting from this RFP.
If it becomes necessary to amend the RFP, an Addendum will be issued by the Agency and publicly advertised for a minimum of five (5) calendar days in advance of the bid opening date and time. The bid opening date and time will be extended, if necessary, in order to meet the five (5) day requirement.
6.6 Bidder’s Responsibility
The Bidder assumes sole responsibility for the complete effort required in this RFP. No special consideration will be given after bids are opened because of a Bidder’s failure to be knowledgeable of all the requirements of this RFP. By submitting a bid in response to this RFP, the Bidder shall be deemed to have understood all the requirements of the RFP.
6.7 Cost Liability
The Agency assumes no responsibility and bears no liability for costs incurred by Bidders in the preparation and submittal of the bids in response to this RFP.
6.8 RFP Preparation and Submission Requirements
6.8.1 The proposal must be uploaded, submitted, and finalized prior to the bid opening date and time. We strongly recommend that you allow sufficient time and at least ONE (1) day prior to bid opening date and time to begin the uploading process and to finalize your submission.
Important Notes:
• Uploading large documents may take significant time, depending on the size of the file(s) and your Internet connection speed.
https://njhmfa.bonfirehub.com/
• An email receipt with a unique confirmation number will be sent once you finalize your submission.
• Minimum system requirements: Internet Explorer 11, Microsoft Edge, Google Chrome, or
Mozilla Firefox. JavaScript must be enabled. Browser cookies must be enabled.
Need Help?
New Jersey Housing and Mortgage Finance Agency uses a Bonfire portal for accepting and evaluating proposals digitally. Please contact Bonfire at Support@GoBonfire.com for technical questions related to your submission. You can also visit their help forum at:
https://bonfirehub.zendesk.com/hc
6.8.2 The proposal submitted in response to this RFP must include the following. Failure to submit or sign any of the required documents may result in disqualification.
1. Specific Requirements as detailed in Section 5.0 of this RFP
2. Mandatory Affirmative Action Language, N.J.S.A. 10:5-31 et seq., N.J.A.C.17:27-1 et seq.
(Exhibit A)
3. References (Exhibit B)
4. Chapter 51/Executive Order 333 (2023) Vendor Certification and Disclosure Forms (See
Appendix 3 to determine applicability)
5. Signed Source Disclosure Form (Exhibit D)
6. Code of Ethics for Vendors (Exhibit E)
7. Ownership Disclosure Form (Exhibit F)
8. Subcontractor Utilization (Exhibit G)
9. Signed Cost Sheet (Exhibit H)
10. Federal Grant Program Rider (Exhibit I) – Applicable for Federal funds only
11. Copy of your New Jersey Business Registration Certificate (It is not required to submit this certificate with the proposal; however, Bidder and any named Subcontractors must submit a copy of their certificate and those of any named Subcontractors prior to entering into a Contract with the Agency).
12. Copy of Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Small
Business Enterprise (SBE), Veteran-owned Business (VOB), or Disabled Veteran-owned
Business (DVOB) certification if applicable. According to Section 5.2 - Bid Evaluation Criteria the Bidder will receive additional points during the evaluation process for submission of qualifying documents.
6.9 Exceptions to the RFP
Bidders may find instances where they must take exception with non-material requirements or specifications of the RFP. All exceptions shall be clearly identified, and written explanations shall include the scope of the exceptions, the ramifications of the exceptions for the Agency, and a description of the advantages to be gained, or disadvantages to be incurred by the Agency as a result of these exceptions.
All exceptions must be included with the electronic submission.
6.10 Rights to Submitted Material
All proposals, responses, inquiries, and/or correspondence relating to or in reference to this RFP, and all reports, charts and other documentation submitted by Bidders shall become the property of the Agency when received.
mailto:support@gobonfire.com https://bonfirehub.zendesk.com/hc
6.11 Rejection of Bids
The failure of bidders to fulfill all bid requirements may result in rejection of bid. The Agency reserves the right to accept or reject any or all bids or to waive minor elements of non-compliance of any respondent’s bid with regard to the requirements outlined in the RFP.
The following grounds may be utilized for the rejection of the bid:
1. Failure to submit the bid on or before the date and time specified in the RFP document.
2. Failure to sign documents where indicated.
3. Failure to fully complete the Source Disclosure Certification Form (Executive Order 129).
4. Failure to submit an executed fee schedule or cost sheet.
5. Submission of contracts or other documents materially inconsistent with the requirements of the RFP or which represent general disclaimers of the terms thereof.
6. Failure to withdraw proposed exceptions deemed by the Agency to be unacceptable.
7. Failure to provide information or other supplemental materials/requirements specified in the
RFP.
6.12 Bid Errors
No alterations or corrections to the bids are permitted after the bids are opened. If an error is discovered after the bid opening but before Contract award, the Bidder may request that their bid be withdrawn. This request must be submitted in writing to Mary Miller, Director of Operations, and signed by an officer or authorized representative of the firm. The decision to permit withdrawal of the bid will be at the discretion of the Agency.
The Agency may, under extraordinary circumstances, allow for a bid to be withdrawn after Contract award. In this case, the Bidder requesting withdrawal will be liable for any administrative expenses incurred as a result of Contract cancellation and subsequent award to another Bidder.
6.13 Indemnification
The Contractor shall assume all risk of and responsibility for and agrees to indemnify, defend, and hold harmless the Agency, its officers, employees and agents from and against any and all claims, demands, suits, actions, recoveries, judgments and costs and expenses which shall relate to, arise from, or result directly or indirectly from the services, work and/or materials supplied under this Contract. This indemnification obligation is not limited by, but is in addition to the insurance obligations contained in this agreement.
The Agency assumes no obligation to indemnify or hold harmless the Contractor, its agents, servants, employees or Subcontractors for any claim that may arise out of its performance of the Contract.
6.14 Negotiation and Best and Final Offer (BAFO)
Following the opening of bid proposals, the Agency reserves the right to negotiate with Bidders, after bid opening, the final terms and conditions of any procurement, including price, the technical services offered, the terms and conditions and/or the price of a proposed Contract award with any Bidder. In response to the Agency’s request to negotiate the Bidder must continue to satisfy all mandatory RFP requirements but may improve upon original technical proposal in any revised technical proposal. However, any revised technical proposal that does not continue to satisfy all mandatory requirements will be rejected as non-responsive and the original technical proposal will be used for any further evaluation purposes, in accordance with the following procedures:
The Agency will conduct an initial review and determine whether and with which Bidder(s) it will negotiate, and will communicate its request to each such Bidder. In response, the Bidder will submit any required revisions to its proposal.
In response to the Agency’s request for a BAFO (“Best and Final Offer”), the Bidder may submit a revised price proposal that is equal to or lower in price than its original submission but must continue to satisfy all mandatory requirements.
After receipt of the results of the negotiation and/or the BAFO(s), the Evaluation Committee will complete its evaluation and recommend to the Agency for award that responsible Bidder(s) whose bid proposal, conforming to this RFP, is most advantageous to the Agency, price and other factors considered.
All contact, records of initial evaluations, any correspondence with Bidders related to any requests for negotiation or BAFO, any revised technical and/or price proposals, the Agency’s evaluation and the award recommendation, will remain confidential until an Intent to Award notice is issued.
6.15 Retainage
If retainage is required on a Contract, the Agency will retain the stated percentage or retainage from each invoice. Payment of retainage will be authorized after satisfactory completion and submission of all services, deliverables or work products by the contractor and acceptance by the Agency of all services, deliverables or work products required by the Contract.
6.16 Bidder’s Status
In the event the Bidder is awarded the Contract, the Bidder/Contractor shall be an independent Contractor of the Agency and not an employee of the Agency.
6.17 Contract Award
Award shall be made with reasonable promptness by notice to the responsible Bidder whose bid, conforming to this RFP, will be most advantageous to the Agency.
The Agency reserves the right to accept or reject any or all bids or to waive minor elements of non-compliance of any respondent’s proposal with regard to the requirements outlined in the RFP.
6.18 Notification of Award
The intended awardee will receive a Notice of Intent to Award letter. This Notice may also contain certain contingency requirements that must be satisfied within seven (7) business days of receipt of the letter.
Failure to comply with all provisions of the Notice of Intent to Award letter may disqualify that Bidder.
6.19 Bidder Right to Protest Award
Except in cases of emergency, Bidders have the right to protest the Agency’s proposed award or notice of intent to award of the Contract. Unless otherwise stated, a Bidder’s protest must be submitted to the
Executive Director of the Agency within three (3) business days after receipt of written notification that his bid has not been accepted or that notice of intent to award has been made to another Bidder. Written objections with supporting facts and arguments must be addressed to the Executive Director. The
Executive Director will review the protest(s) and make a determination of the validity of the claim within ten (10) business days of receipt of written objection. In case of emergency, as stated in the record, the
Agency may waive the protest period.
6.20 Subcontracting or Assignment
The Contract may not be subcontracted or assigned by the Contractor, in whole or in part, without the prior written consent of the Agency. Such consent, if granted, shall not relieve the Contractor of any of their responsibilities under the Contract.
In the event the Bidder proposes to subcontract for the services to be performed under the terms of the
Contract award, he/she shall state so in their bid and attach for approval a list of said Subcontractors and an itemization of the products and/or services to be supplied by them. All Contractors and subcontractors must be appropriately identified and registered and at all times comply with N.J.S.A. 52:32-44.
Nothing contained in the specifications shall be construed as creating any contractual relationship between any Subcontractor and the Agency.
6.21 Right to Inspect Facilities and Records
The Agency reserves the right to inspect the Contractor's establishment for the purposes of ascertaining whether the Contractor has the necessary facilities for performing the Contract.
The Agency may also consult with clients of the Bidder during the evaluation of bids. Such consultation is intended to assist the Agency in making a Contract award that is most advantageous to the Agency.
6.22 Confidentiality
In the course of performing services required under this Contract, the Agency may be providing certain information that the Agency may wish to keep confidential. Contractor shall not disclose Confidential
Information, as defined below, to any third party unless, prior to any such disclosure, Contractor has obtained the Agency’s written permission.
“Confidential Information” shall mean any information or data of a confidential nature, which is not considered public record as determined by the Agency, including but not limited to: (a) personal information about individuals and entities, including but not limited to social security numbers and financial data; (b) technical, developmental, marketing, sales, operating, performance, cost, know-how, methodologies, business and process information; (c) computer programs and related documentation, including related programming know-how and techniques; and (d) all record-bearing media containing or disclosing such information, know-how, and techniques disclosed under this Contract.
6.23 Ownership of Material
The Agency shall retain all of its rights and interest in and to any and all documents and property, both hard copy and digitally furnished by the Agency to the Contractor, for the purpose of assisting the
Contractor in the performance of this Contract. All such items shall be returned immediately to the Agency at the expiration or termination of the work or Contract. None of such documents and/or property shall be disclosed to others or used by the Contractor or permitted by the Contractor to be used by third parties at any time except in the performance of the Contract.
All data, technical information, materials gathered, originated, developed, prepared, used or obtained in the performance of the Contract, including, but not limited to: all reports, plans, charts, literature, brochures, recordings (audio and/or video), analyses, documentation and print-outs, notes and memoranda, written procedures and documents, regardless of state of completion, which are prepared for or are a result of the services required under this Contract shall be and will remain the property of the
Agency and shall be delivered to the Agency upon 30 days’ notice by the Agency.
6.24 Proprietary Information/ Public Disclosure
Subsequent to bid opening, all information submitted by Bidders in response to the bid solicitation is considered public information, except as may be exempted from public disclosure by the Open Public
Records Act, N.J.S.A. 47:1A-1, et seq., and the common law. If the Agency determines it will request
Best and Final Offers, bid proposals will not be made public until the Letter of Intent to Award is issued.
A Bidder may designate specific information as not subject to disclosure when the Bidder has a good faith legal/factual basis for such assertion. The Agency reserves the right to make the determination and will advise the Bidder accordingly. The location in the bid proposal of any such designation should be clearly stated in a cover letter. The Agency will not honor any attempt by a Bidder either to designate its entire bid proposal as proprietary and/or to claim copyright protection for its entire proposal.
6.25 Maintenance of Records: Authority to Audit or Review Contract Records – N.J.A.C. 17:44-
2.2
The Contractor shall maintain all documentation related to products, transactions or under this Contract for a period of five (5) years from the date of final payment. Such records shall be made available to the
Agency and the New Jersey Office of the State Comptroller upon request.
7.0 PROJECT TERM AND TERMINATION
7.1 Contract Term
This Contract will be awarded for a one (1) year term. The Contract may be extended for two (2) additional two (2) year terms, upon mutual written consent of both parties. If, in the opinion of the Agency, it is in the best interest of the Agency to extend any Contract entered into as a result of this Request for Proposal, the
Contractor will be so notified of the Agency’s intent at least thirty (30) days prior to the expiration date of the existing Contract. The Contractor shall have fifteen (15) calendar days to respond to the Agency’s request to extend the Contract. If the Contractor agrees to the extension, all terms and conditions of the original Contract, including price, will be applicable.
7.2 Project Suspension and Termination of the Contract Award
A. SUSPENSION OF PROJECT: If, for any reason, the Project for which the Contractor's services were contracted should be suspended, the Agency may suspend this Contract upon seven (7) business days’ written notice to the Contractor. Upon receipt of such notice, unless otherwise directed in writing by the Agency, the Contractor shall immediately discontinue all work under the Contract. Upon such notification, the Contractor shall be paid a proportion of the fee which the services actually and satisfactorily performed by it shall bear to the total services completed under the Contract, less payments previously made. The Agency may order that the work on the Project be stopped temporarily, and upon seven (7) business days’ written notice from the Agency, the Contractor shall cease all work on the Project except as necessary to properly secure the Project. If the Agency directs that the work on the Project resume within six (6) months, the Contractor shall be obliged to complete the Project for the basic fee provided for in this Contract, plus additional compensation for any work necessitated by the stop order as approved by the Agency in writing.
However, in the event that services are scheduled to end either by Contract expiration or by rescission of the Contract award by the Agency, it shall be incumbent upon the Contractor to continue the services if requested by the Agency to do so, until new services, if any, are completely operational. At no time shall this transitional period extend more than ninety (90) calendar days beyond the expiration or termination date of the existing Contract, except by agreement of the parties. The Contractor will be reimbursed for this service at the rate in effect when this transitional period clause is invoked by the Agency.
B. TERMINATION OF THE CONTRACT AWARD: The Agency may terminate the Contract award at any time during the duration of the Contract, without penalty, subject to the following provisions:
(1) Change of Circumstances: Where circumstances change and/or the needs of the Agency change, or the Contract is otherwise deemed by the Agency to no longer be in the public interest, the Agency may terminate the Contract award upon no less than thirty (30) calendar days’ notice to the Contractor. In the event of such a termination of the Contract award, the Contractor shall furnish to the Agency, free of charge, such closeout reports as may reasonably be required.
(2) For Cause:
(a) Where a Contractor fails to perform or comply with the Contract and/or fails to provide information requested by the Agency, the Agency may terminate the Contract award upon ten (10) calendar days’ notice to the Contractor with an opportunity to protest said termination and/or request an informal hearing, if necessary, and issue a final Agency decision regarding termination of the Contract.
(b) Where a Contractor continues to perform a Contract poorly as demonstrated by written findings issued by the Agency and provided to the Contractor, the Agency may issue a Notice of Intent to
Terminate the Contract award with a ten (10) calendar day opportunity for the Contractor to protest such termination and/or request an informal hearing. If the Contractor protests, the Agency will complete the hearing, if necessary, and issue a final Agency decision regarding termination and related issues including, but not limited to, damages payable to the State.
(c) The Agency's right to terminate award for cause includes any reason set forth in any other…