3. Schedule.docx

DOCX document 14 KB Posted

Attached to
127EAW22R0028 - Caldor Fire Gates
Solicitation number
127EAW22R0028
Issued by

View the file

Other files

File Type Posted
RFI Official Responses - 3 .pdf PDF
RFI Official Responses - 4.pdf PDF
A00002 - RFIs 3 and 4.pdf PDF
A00001 - RFIs Round 1 and 2.pdf PDF
RFI Official Responses - 2.pdf PDF
RFI Official Responses - 1.pdf PDF
Gate Pictures.pdf PDF
7. RFI.docx DOCX document
127EAW22R0028 - Caldor Fire Gates.pdf PDF
5. Gate Locations and Type.pdf PDF
1. Statement of Work.pdf PDF
2. Fire Plan.pdf PDF
4. Drawings and Maps.pdf PDF
6. Davis-Bacon Act WD # CA20210007.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Item
Construction Items
Qty
UOI
Unit Price
Total Price
0001
Mobilization
1
LS
0002
Gate Type A (includes fabrication and installation)
7
EA
0003
Gate Type B (includes fabrication and installation
2
EA
0004
Gate Type C (includes fabrication and installation
6
EA
0005
Gate Type D (includes fabrication and installation
1
EA
BASE TOTAL:
___________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.