1. Statement of Work.pdf

PDF 203 KB Posted

Attached to
127EAW22R0028 - Caldor Fire Gates
Solicitation number
127EAW22R0028
Issued by

View the file

Other files

File Type Posted
RFI Official Responses - 3 .pdf PDF
RFI Official Responses - 4.pdf PDF
A00002 - RFIs 3 and 4.pdf PDF
A00001 - RFIs Round 1 and 2.pdf PDF
RFI Official Responses - 2.pdf PDF
RFI Official Responses - 1.pdf PDF
Gate Pictures.pdf PDF
7. RFI.docx DOCX document
127EAW22R0028 - Caldor Fire Gates.pdf PDF
5. Gate Locations and Type.pdf PDF
2. Fire Plan.pdf PDF
4. Drawings and Maps.pdf PDF
6. Davis-Bacon Act WD # CA20210007.pdf PDF
3. Schedule.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: ENF Caldor Fire Closure boundary gate installation

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SCOPE OF CONTRACT

This project includes fabrication and installation of 16 gates (4 different styles depending on location) for the Eldorado National Forest along the boundary of the Caldor Fire Closure. The Contractor shall be responsible for the off-site fabrication of the gates per the drawings and specifications. The Contractor shall install the gates at the 16 locations along the edge of the closure area. All locations are accessible by vehicle and located on or near Class 3 or better FS roads.

Contractor shall supply and install all associated hardware and appurtenances, as shown in the drawings. Contractor will fabricate and provide lock bar set (as shown in drawings) for each gate Contractor will be responsible for supplying all gate signs and markers in compliance with MUTCD requirements.

Contracting Officer Representative will verify location of gate and swing direction. Contractor is responsible for verifying length of gate prior to fabrication and gate layout. Note that subsurface ground conditions are unknown. Gate location may need to be field adjusted to facilitate excavation of gate posts. Over excavated post holes shall be filled with concrete, and cost will be considered incidental to bid items. Contractor is responsible for cleanup and any damage at install site. If during installation any bones or artifacts are found, contractor will immediately cease work and notify COR.

Any work not completed prior to unsuitable construction conditions will be postponed and completed at the earliest acceptable conditions.

PROJECT LOCATION

This project is located at 16 different locations along the boundary of the Caldor Fire which is generally defined as Mormon Emigrant Trail east to HWY 88, SW along HWY 88 to Omo Ranch Road, north to Mormon Emigrant through Grizzly Flats. A Google Map, kmz file and list of locations in lat/long with gate type will be provided

ESTIMATED START DATE

May 1st, 2022 – 365 Day Period of Performance

RESTRICTIONS ON WORK

Work shall be performed during daylight hours between 0730 hrs and 1800 hrs local time.

Exceptions to these times are:

1. In accordance with the fire plan, if included in Section J.

2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

3. Federal Holidays will be considered non-work days unless previously approved by the CO or COR

4. Requests to work outside of these times will be sent to the COR and CO for approval.

INSURANCE & CERTIFICATIONS

The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

MAPS

A list of locations by latitude and longitude is provided. Contractor and COR will verify actual locations in the field and adjust as needed to meet the intent and constructability. A link to a Google Map with locations is provided here:

https://www.google.com/maps/d/edit?mid=1HO3xmUgsNkCQvTElPy5aDMqq9rBX3nKH&usp=s haring

DRAWINGS AND SPECIFICATIONS

Drawings are provided. Any requested changes must be submitted and approved by the COR and CO before fabrication. Request Contractor visit sites prior to fabrication to verify gate width needed.

Specifications:

[X ] Construction Standard Institute (CSI) specifications These specifications are physically incorporated in the solicitation.

[ ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 (US Customary Units) This document is incorporated by reference and is available on the web in electronic PDF https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf

[ X ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 (US Customary Units) This document is incorporated by reference and is available on the web in electronic PDF

(https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf)

[ ]1996 road and bridge specifications-- Standard Specifications applicable to this project can be found in Forest Service Specifications for Construction of Roads & Bridges, August 1996 (EM-7720-100), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock https://www.google.com/maps/d/edit?mid=1HO3xmUgsNkCQvTElPy5aDMqq9rBX3nKH&usp=sharing https://www.google.com/maps/d/edit?mid=1HO3xmUgsNkCQvTElPy5aDMqq9rBX3nKH&usp=sharing https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf number is 001-001-00660-2. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad

[ ] 1985 road and bridge specifications-- Standard Specifications applicable to this project can be found in Forest Service Specifications for Construction of Roads & Bridges, April 1985, which is incorporated by reference. The publication is out of print. Contact the issuing office for copies of relevant specifications.

[ ] Trail specifications-- Standard Specifications applicable to this project can be found in Standard Specifications for Construction and Maintenance of Trails, September 1996 (EM-7720-103), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00661-1. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad

Special Project Specifications are physically incorporated within this solicitation, beginning on the next page.

http://www.fs.fed.us/.ftproot/pub/acad http://www.fs.fed.us/.ftproot/pub/acad

File details come from the government source that posted it. Updated .