3_02835_wood_fences_and_gates_mvo.docx
DOCX document 28 KB Posted
- Attached to
- RED WASH WETLANDS FENCE
- Solicitation number
- 140L6221R0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6221R0046_Amd_0001.pdf | ||
| 140L6221R0046_AMD_0001_Question_and_Answer_0001.docx | DOCX document | |
| MAPS.pdf | ||
| 6_Work_Data_Sheet_1_of_2__MVO_6_23_21.docx | DOCX document | |
| 2__01009_general_mvo.docx | DOCX document | |
| 7_Work_Data_Sheet_2_of_2_MVO_6_23_21.docx | DOCX document | |
| 0_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Red_Wash_Wetlands_Fence_Drawings.pdf | ||
| Sol_140L6221R0046.pdf | ||
| 4_02829_End_and_Stress_Panels_mvo.doc | DOC document | |
| 5_Fence_Material_specs_mvo.doc | DOC document | |
| 1_SOW_mvo.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02825
WOOD FENCES AND GATES
PART 1: GENERAL
1.1 SUMMARY:
A. Section Includes: Installing a four wire wildlife friendly fence and a three wire top rail fence at locations and as detailed on the drawings.
B. Wire Gates: Construct one three wire gates at location marked in the field and drawings. Gates shall be constructed using equally spaced wooden 3” stays. As shown on the gate drawing,
| C. Related Sections: | General Information and Requirements | Section 01009 | ||
| Government Furnished Material | Section 01019 |
1.2 REFERENCES:
A. West Coast Lumber Inspection Bureau:
Red Wash Wetland Fence 2021 WOOD FENCES AND GATES
02825-1
WCLIB Standard Grading Rules for West Coast Lumber
1.3 SUBMITTALS:
(There are no applicable requirements).
1.4 PROJECT/SITE CONDITIONS:
A. Requirements: Access roads shall not be constructed along fence lines and to the construction site unless written approval is granted by the Contracting Officer. Cross-country travel shall be only to and along fence lines.
PART 2: PRODUCTS
2.1 Refer to Section 01019 for materials to be supplied by the Government.
PART 3: EXECUTION
3.1 PREPARATION:
A. Clearing: Clearing will be the responsibility of the Contractor.
3.2 INSTALLATION:
A. Carriage bolts: 5/8” dia. By 12” long bolts with 2 nuts and 2 washers shall be used to secure rails to posts. No spikes.
B. Installing Rails: Rails shall be saddle cut to fit securely to upright posts.
C. The Government will stake locations in the field showing the alignment of the fence.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: The work described in this section will be measured and paid for by the linear foot, as measured along the ground surface next to the completed fence. Clearing is considered incidental work during fence construction and will not be measured for payment.
4.2 BASIS OF PAYMENT:
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
02825(01) Three wire, top rail fence Linear Foot 02825(02) Wire Gates. Each
END OF SECTION