140L6221R0046_AMD_0001_Question_and_Answer_0001.docx
DOCX document 17 KB Posted
- Attached to
- RED WASH WETLANDS FENCE
- Solicitation number
- 140L6221R0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6221R0046_Amd_0001.pdf | ||
| MAPS.pdf | ||
| 6_Work_Data_Sheet_1_of_2__MVO_6_23_21.docx | DOCX document | |
| 2__01009_general_mvo.docx | DOCX document | |
| 7_Work_Data_Sheet_2_of_2_MVO_6_23_21.docx | DOCX document | |
| 0_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Red_Wash_Wetlands_Fence_Drawings.pdf | ||
| 3_02835_wood_fences_and_gates_mvo.docx | DOCX document | |
| Sol_140L6221R0046.pdf | ||
| 4_02829_End_and_Stress_Panels_mvo.doc | DOC document | |
| 5_Fence_Material_specs_mvo.doc | DOC document | |
| 1_SOW_mvo.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6221R0046 Amendment 0001 Red Wash Wetlands Fence
1. Can the Red Wash Wetlands Fence 140L6221R0046 period of performance be extended to Nov 15, 2022? Since the wildlife stip is SEP 15- NOV 15, the extension would allow the fence to be constructed next year since material procurement is currently difficult.
All work will need to be performed during dates of SEP 15 – Nov 15 due to wildlife stipulations. The Period of Performance (POP) end date has been changed to 11/30/2022 for the correction of any punch list items and for invoice submittal. All other work must be completed NLT 11/15/2022.