2__01009_general_mvo.docx

DOCX document 28 KB Posted

Attached to
RED WASH WETLANDS FENCE
Solicitation number
140L6221R0046
Issued by

View the file

Other files

File Type Posted
Sol_140L6221R0046_Amd_0001.pdf PDF
140L6221R0046_AMD_0001_Question_and_Answer_0001.docx DOCX document
MAPS.pdf PDF
6_Work_Data_Sheet_1_of_2__MVO_6_23_21.docx DOCX document
7_Work_Data_Sheet_2_of_2_MVO_6_23_21.docx DOCX document
0_Bid_Schedule.xlsx XLSX spreadsheet
Red_Wash_Wetlands_Fence_Drawings.pdf PDF
3_02835_wood_fences_and_gates_mvo.docx DOCX document
Sol_140L6221R0046.pdf PDF
4_02829_End_and_Stress_Panels_mvo.doc DOC document
5_Fence_Material_specs_mvo.doc DOC document
1_SOW_mvo.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01009

GENERAL INFORMATION AND REQUIREMENTS

PART 1: GENERAL

1.1 SUMMARY:

A. Description of Work: Furnishing labor, equipment and materials to construct approximately 6,916 linear feet of four wire wildlife friendly fence, 379 linear feet of rail-top 3 wire fence, and 8,797 linear feet of existing 4-wire fence removal.

B. Existing Conditions: Area where the fence is to constructed will be staked by the Government.

C. Debris: Debris consisting of wood posts and poles shall become the property of the Contractor and shall be removed from the work site. The Contractor shall be responsible for disposal of construction debris in a legal manner, and for payment of any fees required. Burning of debris is not permitted on the work site.

1.2 REFERENCES

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/ standards referred to herein may be procured by the Contractor, from the following:

ALSC American Lumber Standards Committee PO Box 210 Germantown, MD 20875

ANSIAmerican National Standards Institute
11 W 42nd St.
New York, NY 10036

AWPA American Wood Preservers' Association P.O. Box 286 Woodstock MD 21163

AWPA C 1-95All Timber Products, Pressure Treatment
AWPA C 5-95Fence Posts, Pressure Treatment
AWPA M 4-95Care of Pressure Treated Wood Products
AWPA P 5-95Waterborne Preservatives
AWPA P 8-95Oil-Borne Preservatives
AWPA P 9-92Solvents for Organic Preservative Systems

CFR Code of Federal Regulations (Available from the Government Printing Office) N. Capitol St. between G and H St., NW Washington, DC 20402

FSFederal Standard
General Services Administration

Specifications Branch Room 6039, GSA Building 7th and D Streets, S.W.

Washington, DC 20407

GSAGeneral Services Administration
F St. and 18th St., NW
Washington, DC 20405
OSHAOccupational Safety and Health Administration
US Department of Labor
200 Constitution Ave., NW
Washington DC 20210

OSHA 2207-91 Construction Industry

WWPAWestern Wood Products Association
522 SW 5th Avenue, Yeon Bldg
Portland, OR 97204-2122
1.3SUBMITTALS
(There are no applicable requirements)

1.4 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit to the site.

B. Storage: The Contractor shall provide temporary storage facilities for products. Storage shall comply with the manufacturer’s instructions. The storage area shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage.

1.5 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.6 PROJECT/SITE CONDITIONS:

A. Access to the Work:

1. Work under this contract is located at the Red Wash Wetland near Dad, WY. The work locations are shown on the drawings.

2. Access to the work shall be provided by and at the Contractors expense. No roads shall be constructed by the Contractor or off road driving permitted without prior written permission from the Contracting Officer.

3. Contractor shall exercise care to prevent unnecessary surface disturbance to existing grass, vegetation, and to existing roads and two-tracks.

4. Public, State, or private access roads damaged by the Contractor shall be restored, at the Contractor’s expense, to the same condition they were in at the commencement of work.

B. Environmental Considerations:

1. No blading will be allowed.

1.7 SEQUENCING AND SCHEDULING:

A. Work Schedule: The schedule shall be submitted at the prework conference. When requested, the Contractor shall submit an updated schedule within three calendar days. As a minimum, the estimated start and completion dates shall be shown in the schedule.

B.

PART 2: PRODUCTS and MATERIALS

A. Materials for the Rail Top 3-wire fence shall be bark on of uniform length and grade. Posts shall be at 15 foot intervals and be of 5 inch to 6 inch diameter at 6 ½ feet in length, rails 4 inch nominal diameter and 16 foot in length.

PART 3: EXECUTION

3.1 PROJECT MEETINGS:

A. PreWork Conference:

1. A prework conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. The Contractor shall be prepared to summarize and explain procedures planned for the project.

B. Progress Meetings:

1. Meetings shall be held at the project site, or as determined by the Contracting Officer.

2. Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.

C. Final Inspection:

1. Meeting shall be held at the project site, or as determined by the Contracting Officer.

2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.

3. The Contractor shall require the superintendent to be present during this inspection.

3.2 PREPARATION

A. Work Limits and Control Points: Will be established by the Contracting Officer.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: Work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT:

A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.

END OF SECTION

Red Wash Wetland Fence 2021 GENERAL INFORMATION AND REQUIREMENTS

01009 - 3