Attachment+2+Change+Order.docx
DOCX document 18 KB Posted
- Contract number
- 329
- Issued by
- North Dakota
About this file
This document appears to be a Change Order template for Term Contract #329 related to On-Site Event Production and Staging Services. The template provides a structured framework for documenting proposed changes to an existing contract, with designated sections for request description, reasons, recommendations, impacts, and solution details. While the specific details are not fully completed in this template, it is designed to facilitate modifications to a contract's terms, scope, or conditions.
The change order template is intended for On-Site Event Production and Staging Services, suggesting a contract for professional event management and technical production services. The template allows for comprehensive documentation of potential contract modifications, including assessments of cost, scope, schedule, and quality implications. Key sections include space for detailing the change request, underlying reasons, potential recommendations, impact analysis, and ultimately, a proposed solution that requires multiple levels of signature approval from relevant project authorities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment+1+Task+Order.docx | DOCX document | |
| 329_State+Contract+Summary.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
CHANGE ORDER
TERM CONTRACT #329 ON-SITE EVENT PRODUCTION AND STAGING SERVICES CONTRACT POOL
| Project Name: |
| Date of Request: |
| Task Order Number: |
| Change Order Number: |
Requested By:
Request Description
Reasons/Goals for Change
Recommendations (Include recommendations by the party that is bringing the change request forward. There is a potential for multiple recommendations for solutions based on analysis.)
Impacts on Cost, Scope, Schedule, Quality
Solution (Define the most appropriate solution to attain the desired objective. This is determined by the approving authority.)
Approval Signature(s) and Date(s). The project manager will identify the appropriate approval body and forward for final approval.
Signature
Date
Signature
Date
Signature
Date
File details come from the government source that posted it. Updated .