This is a Request for Proposal (RFP) issued by Detroit Public Schools Community District for general contractor services to renovate the athletic field at Cass Technical High School in Detroit, Michigan. The project scope includes demolition of the existing field and utilities, relocation of visitor bleachers, installation of new field drainage systems, synthetic turf playing surface with shock pad, new scoreboard, field and athletic equipment, field lighting, fencing renovations, school marquee sign, paving upgrades for pedestrian circulation, minor locker room and concessions building renovations, site restoration, and car barricade systems. The RFP was released on July 31, 2026, with an optional pre-bid conference and mandatory walkthrough scheduled for August 6, 2026. Written questions must be submitted by August 11, 2026, at 12 p.m., and proposals are due electronically by August 21, 2026, at 12 p.m. The public opening will occur on August 21, 2026, at 12 p.m. The estimated project timeline includes bidding and award through November 10, 2026, contract execution and purchase order issuance through December 31, 2026, planning and procurement through March 31, 2027, construction from March 31, 2027, through August 13, 2027, and closeout through October 29, 2027.

Pricing must be all-inclusive of labor, materials, supplies, transportation, applicable taxes, premiums, assessments, and other incidental costs, with detailed cost breakdowns required. Contractors must hold five allowances: $132,000 for AHJ permitting, $100,000 for contaminated soils haul away, $50,000 for underground stormwater piping and detention, $100,000 for soil undercut and stabilization, and $50,000 for dewatering measures, with unused funds returned to the owner at actual cost with no markups. Bid security of five percent of the total bid amount is required, with performance and payment bonds equal to one hundred percent of the bid amount required upon award. The project is subject to Michigan State Prevailing Wage Laws, and contractors must include certified payroll documentation and prevailing wage compliance. Minimum qualifications include ten consecutive years in business, Michigan licensure, successful completion of at least three projects within five years with construction values of $8,000,000 or greater involving similar scope, an Experience Modification Rate (EMR) below 1.0, and the ability to meet bonding and insurance requirements. The City of Detroit serves as the authority having jurisdiction for inspections, and the contractor is responsible for obtaining and closing all necessary permits.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL (RFP)

27-0015

General Contractor Services for Cass Tech High School- Athletic Field Renovation

RFP Release Date: July 31, 2026

Optional Pre-Bid Conference: August 6, 2026 See page 45 for additional information

Mandatory Walk-Through Date: August 6, 2026 See page 45 for additional information

Written Questions Due: August 11, 2026 On or before 12p.m.

Proposals Due: August 21, 2026 On or before 12p.m.

ELECTRONIC SUBMISSIONS ONLY

(See ‘Submission Instructions’)

Detroit Public Schools Community District 3011West Grand Blvd.

Detroit, Michigan 48202

PREFACE

Background

Operations and Demographics

Detroit Public Schools Community District (DPSCD) provides a standard, traditional curriculum to a student body of approximately 50,000 students ranging from pre-kindergarten through the 12th grade. DPSCD also provides adult education at a variety of facilities during non-school hours. In addition to the standard curriculum, DPSCD offers a variety of specialized technical training programs for the higher-grade levels. The District encompasses an area of approximately 139 square miles. DPSCD operates 100 schools, including elementary (K-5), combination (K-8), middle schools, high schools, and technical center schools.

SCHEDULE

Supplier shall provide necessary labor, material, equipment, transportation, and supervision for general contractor services.

PRICING

Pricing must be all-inclusive of labor, materials, supplies, travel, or any other necessary items.

Pricing should include an applicable cost breakdown. All proposals for the services, and for all other work thereunder, shall include all applicable taxes, including social security, unemployment, sales or use taxes, and any other taxes specifically levied on the work or on wages by local, city, state, or federal government, except real property taxes on the site. Proposals shall also include all premiums, assessments, and other like payments, charges, and costs incidental to the services covered by the contract documents. No fees or costs shall be incurred or paid by the Owner for labor, professional, reimbursables, etc. accumulated in response to this RFP.

This Request for Bid describes a particular implementation. All bids must provide pricing on the “base bid” as described herein referencing bid document attachments. The manufacturer listed/noted is only the Basis of Design and alternate manufacturers are acceptable and require project team review and approval. The Basis of Design materials and performance criteria must be met regardless of the manufacturer. Voluntary alternatives providing comparable functionality with significant cost reduction and/or performance enhancement may be proposed. Voluntary alternatives are encouraged but must be identified as “Voluntary Alternates” and detailed on Attachment F - Bid Proposal Form. Voluntary alternates may be further detailed and/or explained in attachments to the bid form. Exceptions to the Request for Bid specifications must be clearly noted and explained for each voluntary alternate proposed.

As DPSCD strives to remain economically prudent, the construction firm is expected to work with the District, A/E firm(s), and Plante Moran Realpoint (PMR) on pricing and documentation for any alternates and/or value engineering.

Pricing must be submitted using Attachment F- Bid Proposal Form. All back up pricing documentation supporting fees outlined in Attachment F are required as part of the proposal submission.

ALLOWANCES

1. The contractor is to hold an allowance in the amount of One Hundred Thirty-Eight

Thousand dollars ($132,000.00) for AHJ permitting allowances in the project scope. This allowance is reserved for all permitting fees that the contractor is responsible for. If a portion or all of the funds are not used the remaining amount should be returned to the owner at actual cost and with no associated mark-ups.

2. The contractor is to hold an allowance in the amount of One Hundred Thousand dollars ($100,000.00) for contaminated soils haul away as needed. If a portion or all of the funds are not used the remaining amount should be returned to the owner at actual cost and with no associated mark-ups.

3. The contractor is to hold an allowance in the amount of Fifty Thousand dollars ($50,000.00) for underground stormwater piping and detention measures as needed for contaminated soils. If a portion or all of the funds are not used the remaining amount should be returned to the owner at actual cost and with no associated mark-ups.

4. The contractor is to hold an allowance in the amount of One Hundred Thousand dollars ($100,000.00) soil undercut and stabilization measures as needed. If a portion or all of the funds are not used the remaining amount should be returned to the owner at actual cost and with no mark-ups.

5. The contractor is to hold an allowance in the amount of Fifty Thousand dollars ($50,000.00) dewatering measures as needed based on the Geotechnical report findings. If a portion or all of the funds are not used the remaining amount should be returned to the owner at actual cost and with no associated mark-ups.

SCOPE OF SERVICE

DPSCD is seeking general contracting firms as detailed for preconstruction, construction phase, and construction closeout phase services as detailed in the attached agreement. See Attachments C and D for the form contracts (A101-2017 and A201-2017).

The City of Detroit is the authority having jurisdiction for DPSCD. All construction inspections will be conducted by the City of Detroit. The contractor is responsible for obtaining and closing out all necessary permits. Permit fees are to be included in the bidders detailed pricing form.

DPSCD reserves the right to add or delete scope at its sole discretion at other locations, as necessary.

Bid security equal to five percent (5%) of the total bid amount, must accompany each base bid.

Bid security shall be either a Bid Bond issued by a company licensed in the State of Michigan to furnish bid security or Certified Check made payable to the Detroit Public Schools Community District.

Selected Firm will be required to provide a performance bond and payment bond in an amount equal to one hundred percent (100%) of the bid amount including any accepted alternates at the District’s discretion. Such bonds shall be issued by surety licensed by the State of Michigan and acceptable to the District. The surety of the performance bond shall remain in effect until all acceptances and final contract close-out requirements herein have been executed by the District.

Withdrawal of any Bids after the opening time without specific approval by the District may result in forfeiture of required bid security by Bidder.

Projects under this RFP are subject to Michigan State Prevailing Wage Laws (Michigan Public Act 10 of 2023). The contractor must pay prevailing wages and fringe benefits to all of the contractors, subcontractors, and construction mechanics working on the Project in accordance with Michigan Public Act 10 or 2023. The schedule of prevailing rates of wages and fringe benefits for all classes of construction mechanics are called for in the contract (specifications of work). A schedule of these rates shall be made a part of the specifications for the work to be performed and shall be printed on the bidding forms. Contractors are responsible for including certified payroll in their application for payment, job signage, and documentation on site. See Attachment I- Prevailing Wage.

This is the link to the Wayne County Prevailing Wage Rates - LEO - Prevailing Wages By County

The project endeavors to renovate the existing Cass Technical High School Stadium. The work will include, but not limited to, demolition of the existing field and utilities, relocation of the existing visitor bleachers, new field drainage system, synthetic turf playing surface with shock pad, new scoreboard, new field and athletic equipment, new field lighting, fencing renovations, new school marquee sign, paving upgrades for pedestrian circulation minor renovations to the locker room and concessions building, site restoration and a car barricade systems.

https://nam04.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.michigan.gov%2Fleo%2Fbureaus-agencies%2Fber%2Fwage-and-hour%2Fprevailing-wage%2Fprevailing-wages-by-county&data=05%7C02%7Cahmed.beasley%40plantemoran.com%7C5476bfb6379542c5217708de263cf51e%7C64591f40df924ba4b17ab8f7aac94a4e%7C0%7C0%7C638990240445651868%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=oHZnWvLhQaWBCnsOEAIXLsZSQJLkFphWm8nOc6YRXXI%3D&reserved=0

Estimated Schedule

Bidding and Award: 7/31/2026 – 11/10/2026 Contract Execution and PO Issuance: 11/11/2026 – 12/31/2026 Planning and Procurement: 1/2/2027 – 3/31/2027 Construction: 3/31/2027 – 8/13/2027 Closeout: 8/13/2027 – 10/29/2027

A detailed project schedule including start date, critical milestones, substantial completion, and final completion will be required prior to mobilization. Firms are to bid the project in its entirety as described in this document and attachments.

PLEASE NOTE: DPSCD reserves the right, in its sole and absolute discretion, to make modifications to the timelines and scope of work set forth in this RFP as it determines to be in its best interest.

General Contractor- Responsibilities

1. Notwithstanding anything contained herein to the contrary, the Owner, in its sole discretion, shall work with the general contractor in determining how the construction contingency allocated for the project shall be utilized.

2. The General Contractor shall consult with the Owner on all fast-tracking, equipment and material expediting and bid-packaging deemed necessary in order to meet the Owner’s schedule included in the RFP. The General Contractor shall cause all subcontractors to include all such costs required to comply with Owner’s schedule.

3. General contractor agrees to commit the proposed team members throughout the duration of the Project. General contractor shall promptly notify the Owner if services of any one of the listed team members become unavailable due to circumstances beyond the General Contractor’s control – e.g., extended illness or disability, death, or termination of employment, etc. Owner shall have the right to interview and select alternate team member(s) employed by the General Contractor to replace the unavailable team member.

General Contractor shall agree to provide the services of the alternate team member(s) selected by Owner. General Contractor is not entitled to additional compensation for any such substitution(s) of the project team members. The assignment of key team members shall also include members of the General Contractor’s consultants.

4. The General Contractor shall identify a representative authorized to act on behalf of the

General Contractor with respect to the project.

5. The parties agree that where there is a conflict between the terms of this Agreement and the General Contractor’s proposal, this agreement shall take precedence.

6. Any other paragraph in this agreement or any other document to the contrary notwithstanding, all services provided by the General Contractor under this agreement shall be performed in a reasonably prompt manner and in accordance with the standard of reasonable care and skill exercised by a General Contractor of recognized experience and expertise similar to the General Contractor’s in the construction of public school facilities.

The General Contractor shall be responsible for the degree of care and skill for all services provided hereunder whether such services are provided directly by the General Contractor, by the General Contractor’s employees or agents, or by any consultants hired by the General Contractor. The General Contractor represents that it has experience with similar educational construction projects which are governed by the Michigan Revised School Code (MCL 380.1 et seq., as amended) the School Building Construction Act (the “Act”) (MCL 388.851 et seq., as amended), the Occupational Code (MCL 339.2011, as amended), the Stille-Derossett-Hale Single State Construction Code Act (MCL 125.1501 et seq.) and the Michigan Building Code. The General Contractor shall also assist the Owner in complying with all of the Owner’s competitive bidding requirements under Sections 1267 and 1274 of the Michigan Revised School Code, as amended. Further, the General Contractor shall be responsible for all costs incurred to correct any action taken by the Owner based on the General Contractor’s services which are inconsistent with the requirements of those statutes. Finally, the General Contractor acknowledges that for purposes of the Act, the General Contractor is designated as the person qualified to supervise and is in charge of construction.

7. The General Contractor shall provide its services in conjunction with the services of an

Architect as described in the agreement between Owner and Architect, as modified. The General Contractor shall not be responsible for the negligence, breach of contract or wrongful conduct of the Owner or the Owner’s separate contractors, suppliers, or consultants, any contractor or subcontractor or supplier of any tier, the Architect or its consultants, or any of their agents or employees, or any other person(s) or entities performing portions of the work. However, nothing herein shall relieve the general contractor of its duties pursuant to this agreement.

8. The General Contractor shall maintain insurance coverage as defined in the RFP during and for the duration of this agreement. The General Contractor shall provide to the Owner certificates of insurance evidencing compliance with the requirements in the RFP. The certificates will show the Owner and Owner Representative Consultant as an additional insured on the Comprehensive General Liability, Automobile Liability, umbrella, or excess policies.

9. The General Contractor shall provide to the Owner a comprehensive warranty log for all material and equipment installed as part of the project including but not limited to field turf, major site infrastructure systems, electrical systems, mechanical systems, bleacher systems, architectural finishes, etc.. The warranty log shall include, at a minimum, equipment descriptions, manufacturer and model numbers, warranty terms, warranty start and expiration dates, warranty contacts, and the specific building locations and systems served by each piece of equipment. The General Contractor shall update the warranty log prior to Substantial Completion and Final Completion and shall provide the finalized log in a format acceptable to the Owner, including any additional information reasonably requested by the District.

General Contractor

1. The General Contractor’s Basic Services include those described in the Agreement, unless specifically designed as an additional service herein, and include but shall not be limited to usual and customary construction coordination and scheduling, and allocation of construction activities among the subcontractors for a complete scope of Work.

2. The General Contractor accepts the relationship of trust and confidence established by the

Agreement, covenants with the Owner to cooperate with the Architect, and exercise the General Contractor’s skill, judgment, and fiduciary responsibilities in furthering the interests of the Owner; to furnish efficient construction administration, management services and supervision; and to perform its services in an expeditious and economical manner consistent with the Owner’s interests. The General Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others.

3. The General Contractor’s responsibility to provide Construction Phase Services commences with the award of any contract for construction and terminates 30 days after the date the Owner accepts the final Certificate for Payment, issued by the Architect or 30 days after final payment to all contractors is due, whichever is earlier.

4. The General Contractor shall provide a staffing plan to include one or more representatives who shall be in attendance at the project site whenever the Work is being performed. The General Contractor shall provide qualified daily, full-time, on-site field supervision any time construction is taking place.

5. The General Contractor shall provide administrative, management, and related services to coordinate scheduled activities and responsibilities of the subcontractors with each other and with those of the General Contractor, the Owner, and the Architect. The General Contractor shall coordinate the activities of the subcontractors in accordance with the latest approved Project schedule, cost estimates, and the Contract Documents. Such duties shall include verification that all necessary submittals of the Contractors, including but not limited to insurance certificates, are timely received from the Contractors. The General Contractor shall provide sufficient organization, personnel, and management to carry out the requirements of this Agreement. The Owner reserves the right, in its sole discretion, to remove or change any of the General Contractor’s personnel. Prior to actual removal and/or substitution, the Owner shall notify the General Contractor of its intent to remove such employee and the General Contractor shall replace such employee as soon as reasonably possible with an employee which the Owner deems acceptable.

6. Utilizing the construction schedules provided by the Sub-Contractors, the General

Contractor shall update the Project schedule, in writing, at least monthly or as otherwise agreed by the parties, incorporating the activities of the Owner, Architect, and Sub- Contractors on the Project, including activity sequences and durations, allocation of labor and materials, processing of Shop Drawings, Product Data and Samples, and delivery and procurement of products, materials and equipment, including those that must be ordered well in advance of construction.

7. The General Contractor shall schedule and conduct meetings at least bi-weekly with the

Owner and other relevant parties, to discuss such matters as procedures, progress, coordination, and scheduling of the Work. The General Contractor shall prepare and promptly distribute minutes to the Owner, Owner Representative Consultant, Architect, Contractors, and other Owner Consultants.

8. The General Contractor shall schedule all tests and inspections required by the Trade

Contract Documents or governmental authorities having jurisdiction and arrange for the delivery of test and inspection reports to the Owner and Architect. The City of Detroit is the Authority Having Jurisdiction for this project.

9. The General Contractor shall develop cash flow reports and forecasts for the Project, for review and approval by the Owner, on a monthly basis, and when requested by the Owner.

10. The General Contractor’s accounting and control systems shall be satisfactory to the

Owner. The Owner and the Owner’s auditors shall, during regular business hours and upon reasonable notice, be afforded access to, and shall be permitted to audit and copy, the General Contractor’s records and accounts, including complete documentation supporting accounting entries, books, correspondence, instructions, drawings, receipts, subcontracts, Subcontractor’s proposals, purchase orders, vouchers, memoranda, and other data relating to this Contract. Owner’s auditors, authorized representative, or designee shall have reasonable access to the Contractor’s facilities, shall be permitted to interview all current or former employees to discuss matters pertinent to the performance of this Agreement and shall be provided adequate and appropriate work space, in order to conduct audits. If an audit inspection or examination in accordance with this article discloses overcharging, or inappropriate charges of any nature by the General Contractor to the Owner that is in excess of one-half percent (0.5%) of the total contract billings, the General Contractor shall reimburse the Owner the actual cost of Owner’s audit expenses in addition to making adjustments for over and/or inappropriate charges. Adjustments and/or payments that must be made as a result of any such audit or examination of the General Contractor’s invoices and/or records shall be made within sixty (60) days from presentation of Owner’s findings to General Contractor.

11. The General Contractor shall develop and implement procedures for the review and processing of Applications for Payment for progress and final payments.

12. The General Contractor’s certification for payment shall constitute a representation to the

Owner, based on the General Contractor’s visits, inspections, and evaluations of the Work and on the data comprising the Contractors’ Applications for Payment, that the Work has progressed to the point indicated and that, to the best of the General Contractor’s knowledge, information, and belief, the quality of the Work is in accordance with the Contract Documents.

13. The General Contractor shall develop and implement project safety programs for each project. The General Contractor will also conduct regular periodic safety inspections and timely inform both the Owner and the contractors of any unsafe conditions discovered during these inspections or disclosed to General Contractor at any time and shall direct the relevant contractor to correct such conditions.

14. The general contractor shall determine in general that the Work is being performed in accordance with the requirements of the Contract Documents and notify and guard the Owner against, contractor and Architect of defects and deficiencies in the Work. In order to make such determination, the General Contractor shall Inspect the site and Work, as often as necessary and appropriate to the stage of construction, to familiarize the General Contractor with the progress and quality of the Work and to determine for the Owner’s benefit and protection if the Work is proceeding in accordance with the Contract Documents and construction schedule, and shall provide prompt notice in writing to the Owner and Architect of any major or material deviations from the Contract Documents in the Work. Additionally, General Contractor shall prepare as-built documents and turn over to Architect for preparation of record drawings.

15. The General Contractor shall provide services at no additional cost, made necessary by major defect or deficiencies in the Work of the Contractor(s) which, through reasonable care, should have been discovered by the General Contractor and promptly reported to the Owner and the Contractor(s), but which the General Contractor failed to so discover and/or report. For purposes of this Agreement, the term “Inspect” and “Inspection” shall be defined as the evaluation of construction and materials used therein, sufficient to permit the General Contractor to render his or her professional opinion as to the Work conforming with the Contract Documents.

16. The General Contractor shall have the authority to reject Work that does not conform to the Contract Documents and shall consult with and timely notify the Architect about the rejection. The General Contractor shall promptly notify the Owner in writing of the intent to reject such Work and shall reject such nonconforming Work unless the Owner stops the Architect and the General Contractor in writing within twenty-four (24) hours after being notified. Upon rejection, the General Contractor shall direct the contractor(s) to take appropriate corrective action and advise the Owner of the corrective action. The failure of the Architect and/or General Contractor to reject Work shall not constitute the acceptance of the Work. The General Contractor shall record any rejection of Work in its daily log and include information regarding the rejected Work in its progress reports to the Architect and Owner.

17. The General Contractor shall have direct control over, charge of, or responsibility for the construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Work. The General Contractor shall be responsible for a Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents, provided that on the basis of its on-site inspections, the General Contractor has reported to the Owner any construction means, methods, techniques, sequences or procedures that do not appear to conform with industry standards and has also reported to the Owner any Work that appears not to be in conformance with the Contract Documents. The General Contractor shall be responsible for the General Contractor’s negligent acts or omissions, but shall not have control over or charge of, and shall not be responsible for, acts or omissions of the Owner, its separate consultants, the Architect or its consultants, or their agents or employees, or any other persons or any other persons or entities performing portions of the Work.

18. The General Contractor shall transmit to the Architect and Owner requests for interpretations and requests for information of the meaning and intent of the Drawings and Specifications with its written recommendation and assist in the resolution of questions that may arise.

19. The General Contractor shall review requests for changes, assist in negotiating Sub- Contractors’ proposals, submit recommendations to the Architect and Owner, and, if they are accepted and approved by the Architect and Owner, prepare Change Orders and Construction Change Directives that incorporate the Architect’s modifications to the Contract Documents. The General Contractor will create, update, and provide to the Owner a numbered change order log in conjunction with each contractor’s submitted progress reports.

20. The General Contractor shall prepare, and revise as necessary, a Project submittal schedule incorporating information from all the participants on the Project under the management of the General Contractor. The Project submittal schedule and any revisions shall be submitted to the Architect for approval. The General Contractor shall promptly review all Shop Drawings, Product Data, Samples, and other submittals for compliance with the submittal requirements of the Contract, coordinate submittals with information contained in related documents, and transmit to the Architect those that the General Contractor recommends for approval. The General Contractor’s actions shall be taken in accordance with the Project submittal schedule approved by the Architect and in all instances with such reasonable promptness as to cause no delay in the Work critical path of the Work and without financial impact to the Owner. The Architect will evaluate the cost of substitutions proposed by the General Contractor.

21. The General Contractor shall keep a daily log containing a record of weather, each

Contractor’s Work on the site, number of workers, identification of equipment, Work accomplished, problems encountered, delays and other similar relevant data as the Owner may require. The log shall be available to the Owner and Architect.

22. The General Contractor shall record the progress of the Project. On a monthly basis, or otherwise more frequently as agreed to by the Owner, the General Contractor shall submit written progress reports to the Owner and Architect, showing percentages of completion and other information identified below:

a) Work completed for the period for each Contractor and the Project as a whole, including percentage of completions;

b) Project schedule status; including a variance schedule against the baseline schedule.

c) Submittal schedule and status report, including a summary of remaining and outstanding Submittals;

d) Request for information, Change Order, and Construction Change Directive status reports;

e) Tests and inspection reports;

f) Status report of nonconforming and rejected Work;

g) Daily logs;

h) Summary of all Applications for Payment;

i) Cumulative total of the Cost of the Work to date including the General Contractor’s compensation and reimbursable expenses at the job site, if any;

j) Cash-flow and forecast reports;

k) Any other items the Owner may require.

23. General Contractor shall maintain at the project site one copy of all contracts, drawings, specifications, addenda, change orders, and other modifications, in good order and marked currently to record all changes and selections made during construction, and in addition, approved shop drawings, product data, samples, purchases, materials, equipment, applicable handbooks, maintenance and operating manuals and instructions and similar required submittals. The General Contractor shall maintain records, in duplicate, of principal building layout lines, elevations of the bottom of footings, floor levels and key site elevations certified by a qualified surveyor or professional engineer. The General Contractor shall keep at the project site all necessary prevailing wage rate documentation required. The General Contractor shall make all such records available to the Architect, Owner, and the Owner’s Representative, and upon completion of the Project, shall deliver them to the Owner.

24. The General Contractor shall arrange for the delivery, storage, protection, and security of

Owner-purchased materials, systems, and equipment that are a part of the project until such items are incorporated into the Work.

25. With the Architect and the Owner’s maintenance personnel, the General Contractor shall arrange, observe, coordinate, and facilitate the final testing and start-up of utilities, operational systems, and equipment, and observe any commissioning as the contract documents may require. Conduct training, including a video recording of training for MEP systems and other systems as noted in the project specifications (i.e., turf system, scoreboard system, etc.).

26. When the General Contractor considers the Work or a designated portion thereof is substantially complete, the General Contractor shall prepare for the Architect a list of incomplete or unsatisfactory items and a schedule for their completion. The General Contractor shall assist the Architect in conducting inspections to determine whether the Work or designated portion thereof is substantially complete.

27. When the Work or designated portion thereof is substantially complete, the General

Contractor shall prepare a certificate of substantial completion and the General Contractor and Architect shall execute, a Certificate of Substantial Completion. The General Contractor shall submit the executed Certificate to the Owner. The General Contractor shall coordinate the correction and completion of the Work with the assistance of the Owner and Architect. Following issuance of a Certificate of Substantial Completion of the Work or a designated portion thereof, the General Contractor shall evaluate the completion of the Work and make recommendations to the Architect when Work is ready for final inspection.

The General Contractor shall assist the Architect in conducting final inspections.

28. Duties, responsibilities, and limitations of authority of the General Contractor as set forth in the Contract Documents shall not be restricted, modified, or extended without written consent of the Owner.

29. As part of its Basic Services, the General Contractor shall review and discuss any outstanding issues with the Owner at 12 months following the Date of Substantial Completion. General Contractor will assist the Owner in resolving such outstanding issues, as necessary, and will provide call-back services related to such outstanding issues, facility operations, and performance for a period of twenty-four (24) months following the date of Substantial Completion.

30. As a part of its Basic Services, the General Contractor shall assist the Owner and the Architect in determining existing conditions so as to avoid surprises during construction.

31. The Owner shall provide prompt written notice to the General Contractor and Architect if the Owner becomes aware of any fault or defect in Project that it knows to be a fault or defect in the Project, including errors, omissions or inconsistencies in the Architect’s Instruments of Service or any fault or defect in the General Contractor’s services but the Owner’s failure or omission to do so shall not relieve the General Contractor of its responsibilities hereunder and the Owner shall have no duty of observation, inspection, or investigation. The General Contractor shall provide the Architect and the Owner prompt notice if it becomes aware of a fault or defect in the Project or nonconformance with the Contract Documents.

32. When necessary for the Project and requested by the General Contractor in writing, the

Owner shall furnish, with assistance from the Architect and General Contractor, services of geotechnical engineers, which may include but are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil conditions, with written reports and appropriate recommendations, if such surveys are reasonably required by the scope of the Project.

33. When necessary for the project and requested by the General Contractor in writing, the

Owner shall furnish, with assistance from the Architect and General Contractor, surveys to describe physical characteristics, legal limitations, and utility locations for the site of the project, and a written legal description of the site, if such surveys are reasonably required by the scope of the project. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures;

designated wetlands; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a project benchmark.

34. The Owner shall furnish tests, inspections, and reports required by law or the contract documents, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.

DATA CONFLICTS

Where conflicts occur within this RFP and its contents and addenda, the Standard Form of Agreement, general, supplemental, and other conditions, etc. the more restrictive requirements shall govern - all in favor of the Owner.

MINIMUM QUALIFICATIONS

1. Firm has been in business for at least the last ten (10) consecutive years

2. Be licensed to perform the work in the State of Michigan

3. Firm to demonstrate successful completion of at least three (3) projects within the last five (5) years with a construction value of $8,000,000 or greater that included substantial earthwork, site development, underground utility installation, athletic facility improvements, municipal infrastructure, educational facilities, parks and recreation facilities, or other projects of similar scope and complexity

4. Firm shall have EMR of less than 1.0

5. Firm must be able to comply with Bonding and Insurance requirements as noted in the Agreement and this RFP.

LIST OF ATTACHMENTS

Attachment A- Bidding Drawings Attachment B- Bidding Specs

Attachment C- A101-2017 Attachment D- A201-2017 Attachment E- Schedule

Attachment F- Bid Proposal Form Attachment G- ESA Phase 1

Attachment H- Prevailing Wage

REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF CONTRACTORS OR RESPONDENT

1. By submission of this Proposal, the Contractor certifies that neither it nor its principals it presently debarred, suspended, proposed for debarment, declare ineligible, or voluntarily excluded from participation in this transaction by any Federal, State or Local departments or agencies.

2. Should the Contractor be unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this Proposal.

3. The following forms are required to be completed to validate the Proposal and upon acceptance of the contract will confirm compliance with DPSCD eligibility requirements.

FORMS REQUIRED OF ALL CONTRACTORS:

1. Contractor’s Cover Sheet

2. Pre-Award Survey Documents

3. Hold Harmless, Copyrighted Material, Trade Secrets and Disclosure of other Proprietary

Information

4. Legal Disclosure

5. Proof of Insurance

6. Notice of Non-Discrimination

7. Equal Employment Opportunity Documents

8. Affidavit for Vendor/Supplier – Form 7506 (must be notarized)

9. Conflict of Interest Disclosure Statement – Form 7507 (must be notarized)

10. Familial Disclosure Form (for construction, repair, and renovations)

11. Affidavit – Iran Economic Sanctions

12. Subcontractors and/or Proposed Subcontracting Areas

13. Detroit-based Business - Must include copies of Certifications

14. Personnel Survey – Form 4450 Revised

15. Statement of Ownership

16. Internship Program Description

17. Suspension and Debarment and Other Responsibility Matters

18. Certifications

i. Certificate of Independent Price Determination

ii. Clean Air and Water Certificate

iii. Disclosure of Lobbying Activities (Certification)

CONTRACTOR’S COVER SHEET

Legal Status of Contractor:

1. Name of Firm:

2. Type of Business: The Contractor represents as part of its offer that it operates as (Mark one with an ‘X’) An Individual ____; A Corporation ___; Partnership ___;

Joint Venture ___________; or Other: ______________ (please specify).

3. If incorporated or organized, please identify State of incorporation or organization:

_______________________________. If not Michigan, Contractor represents that it is or, prior to the commencement of any work for the District, will be qualified to do business in the state of Michigan.

4. Date of incorporation or organization: _______________________________________ Date of qualification to do business in Michigan (if not a Michigan organized company):

5. The ID Number/Registration Number assigned to your company by the State named above: ____________________. Data Universal Numbering System (DUNS) & BRADSTREET Number: ___________________________.

6. Office which will be responsible for providing the Detroit Public Schools Community District the specified services:

Address:

Contact Person: _____________________________ Title: ____________________

Telephone Number: ___________________ Fax Number: ___________________

E-Mail Address: _____________________________________________________

7. Name, title, and signature of individual duly authorized as representative to execute contracts:

Name: _______________________________________________________________________

Title: _________________________________________________________________________

Signature: ____________________________________________________________________

8. The undersigned understands that the Detroit Public Schools Community District reserves the right to reject any and all solicitation and to waive informalities and irregularities if there is a mistake in the offer.

8a. The undersigned further understands that the contents within this solicitation will become a part of the contract when awarded to the above named proposed contractor.

8b. The signature below certifies that the proposal as submitted complies with all terms and conditions as set forth within the Request for Proposal.

8c. The signature also certifies that the accompanying solicitation is not the result of, or affected by, any unlawful act of collusion with another person or company engaged in the same line of business, or any act of fraud. Furthermore, the company understands that fraud and unlawful collusion are crimes under Federal Law and can result in fines and/or civil damage awards.

I hereby certify that I am a duly authorized representative of the forenamed firm and have the authority to enter an agreement if so awarded by the Detroit Public Schools Community District:

Authorized Representative Signature: ________________________ _____________________________

Printed Name: ___________________________________________ ____________________________

Position: __________________________________________ ___________________________

Dated this _______________day of ________________, 20__

PRE-AWARD SURVEY DOCUMENTS

This statement is an integral part of a Contractor’s proposal. All references and information shall be current and traceable. If the Contractor is a joint venture, each vendor, who is part of the joint venture, shall prepare a separate form.

SOLICITATION NUMBER:

NAME OF CONTRACTOR: ____________________________________________________

ADDRESS: ___________________________________________________________________

TELEPHONE: _______________________________________________________________

1. Name your principal financial institution for financial reference:

Name of Bank: ______________________________________________________________________

Point of Contact: _____________________________________________________________________

Address: ___________________________________________________________________________

Telephone Number: __________________________________________________________________

Contractor hereby authorizes the release of credit information for verification of financial responsibility.

Contractor’s Signature (Date)

Name (typed or written)

2. State your firm’s average receipts over the past 3 years: $ ____________________________

a. Please list names and addresses of the persons in control of the company (e.g., If your firm is a partnership, list names, and addresses of partners; if a corporation, list names of directors and addresses of corporation; if a joint venture, list names, and addresses of ventures).

(Name) (Address)

(Name) (Address)

(Name) (Address)

4. How many years has your firm been in business as a contractor under your present name? ______ years.

5. How many people are currently employed by your firm? ___________

6. Have your firm failed to complete a contract? Yes ___ No ___ (check one)

If yes, give details _____________________________________________________________

7. List the names of four references for whom you have furnished the same or similar type services and of equal magnitude:

LIST OF REFERENCES

Reference #1

Name of Entity:

Contact Person:

Phone No:

Reference #2

Reference #3

Reference #4

HOLD HARMLESS COPYRIGHTED MATERIAL, TRADE SECRETS OR

DISCLOSURE OF OTHER PROPRIETARY INFORMATION

The undersigned duly authorized representative, on behalf of the named Contractor declares:

“that the Contractor will indemnify the Detroit Public Schools Community District and hold it harmless from any claim or liability and defend any action brought against the Detroit Public Schools Community District for its refusal to disclose copyrighted material, trade secrets, or other proprietary information to any person making a request therefore relative to the solicitation and subsequent determination of awarding the desired contract.”

Name of Firm

Signature of Authorized Representative

Printed/Typed Name

Date

LEGAL DISCLOSURE

CIVIL PROCEEDINGS

a) Has the applicant company, its parent, a subsidiary, associate or holding company, or related corporation or business entity had a claim successfully made against it in the last three (3) years in any jurisdiction? Include orders, judgments, administrative sanctions taken, disciplinary hearings, fines and penalties imposed, if any.

No Yes – Provide the following details for each proceeding i.Description of claim ii.Name of other parties to the proceeding iii.Outcome of the proceeding iv.Date of proceeding v.Name of court vi.Court file number (if known) vii.Judgment order

b) Does the applicant company, its parent, subsidiary, associate or holding company, related corporation or business entity have any outstanding claims filed against it and pending dispositions or in the process of being filed in any jurisdiction?

No Yes – Provide the following details for each proceeding i.Description of claim ii.Name of other parties to the proceeding iii.Date of proceeding iv.Name of court v.Court file number (if known)

BIDDER:____________________

By: ________________________

Its: ________________________

Date:

PROOF OF INSURANCE

Attach a copy of your Commercial General Liability declaration page, which illustrates the coverage and limits for this solicitation, following this cover page.

Attach a copy of your Automobile Liability declaration page, which illustrates the coverage and limits for this solicitation, following this cover page.

Attach a copy of your Workers’ Compensation declaration page, which illustrates the

Attach a copy of your Employer’s Liability declaration page, which illustrates the coverage

Attach a copy of your Professional Liability declaration page, which illustrates the

Attach a copy of your Pollution Liability declaration page, which illustrates the coverage

Attach a copy of your Umbrella/Excess Liability declaration page, which illustrates the

Attach a copy of your Builder’s Risk Liability declaration page, which illustrates the

The undersigned duly authorized representative, on behalf of the named Contractor declares that the attached declaration pages are true copies of the specific policies.

Name of Firm

Signature of Authorized Representative

Printed/Typed Name

NOTICE OF NON-DISCRIMINATION

DPSCD does not discriminate on the basis of race, color, national origin, sex, disability, age, religion, height, weight, citizenship, marital or family status, military status, ancestry, genetic information, or any other legally protected category, in its educational programs and activities, including employment and admissions opportunities. The following staff member is designated to handle inquiries regarding the non-discrimination policy:

Jenice C. Mitchell Ford, General Counsel Address: 3011 W. Grand Blvd, Suite 1002, Detroit, MI 48202 Phone: (313) 873-4528 Email: dpscd.compliance@detroitk12.org

EQUAL EMPLOYMENT OPPORTUNITY DOCUMENTS

MISSION

The procurement policy of Detroit Public Schools Community District is to acquire goods, services, materials, and programs for its students based upon a matrix award system of quality, cost, cycle time, and human resources.

EQUAL EMPLOYMENT OPPORTUNITY

The General Superintendent of the Detroit Public Schools Community District is committed to ensure that as a condition of doing business with DPSCD, all contractors and subcontractors must certify that their firm’s employment practices comply with the District’s Equal Employment Opportunity Department. All Contractors must submit with their Proposal:

1) A copy of their company’s equal employment policy, or non-discrimination policy prohibiting discrimination based on race, sex, religion, color, national origin, age, or handicap that is unrelated to the individual’s ability to perform the duties of a particular job position.

2) Complete, sign, notarize and return the following forms:

i) Affidavit for Vendor/Contractor – Form 7506 (must be notarized)

ii) Conflict of Interest Disclosure Statement – Form 7507 (must be notarized)

iii) Subcontractors and/or Proposed Subcontracting Areas

iv) Detroit-based Business, Minority Business Enterprise and Women Business Enterprise

3) Identify business opportunities with Detroit-based businesses by: name of firm, contact person, address, telephone, award amount, and services to be rendered.

RIGHT TO REJECT

The Contracting Officer expressly reserves the right to reject, in its sole discretion; any Contractor for any contract that the Contracting Officer determines is not an offer that is capable of providing quality service to the District. The Contracting Officer further expressly reserves the right to reject all proposals in response to the Request for Proposal.

EQUAL EMPLOYMENT OPPORTUNITIES AND CONTRACT RELATIONS

Detroit Public Schools Community District

Fisher Building – 11th Floor 3011 W. Grand Blvd Detroit, MI 48202

AFFIDAVIT FOR VENDOR/CONTRACTOR

This form must be notarized as a condition of being awarded business by Detroit Public Schools Community District.

I, the undersigned, being first duly sworn, depose and say that I have read the STANDARDS

RELATED TO CONFLICTS OF INTEREST INVOLVING MEMBERS OR EMPLOYEES OF

THE DETROIT PUBLIC SCHOOLS COMMUNITY DISTRICT, understand them and that neither I, nor the owner/officers of the firm, nor any member of it, is involved, directly or indirectly, in a business relationship with any member or employee of the Detroit Public Schools Community District, and that, to the best of my knowledge, a conflict of interest situation, within the meaning of the STANDARDS RELATED TO CONFLICTS OF INTEREST INVOLVING

MEMBERS OR EMPLOYEES OF THE DETROIT PUBLIC SCHOOLS COMMUNITY

DISTRICT does not exist.

Name: ________________________________________________________________________ (type or print)

Signature: _____________________________________________________________________ (Must be signed by President or Vice President)

Social Security Number or Federal ID Number: _______________________________________

Position: ______________________________________________________________________

Firm: _________________________________________________________________________

Subscribed and sworn to before me this ______ day of _____________________________ 20__

Notary Public, __________________________________________________________________

My Commission expires: _________________________________________________________

Form 7506

EQUAL EMPLOYMENT OPPORTUNITIES AND CONTRACT RELATIONS

Detroit Public Schools Community District

Fisher Building – 11th Floor 3011 W. Grand Blvd Detroit, MI 48202

CONFLICT OF INTEREST DISCLOSURE STATEMENT

This form must be…