This is a Frequently Asked Questions (FAQ) document related to the WRWWTF Electrical Building Progressive Design-Build project in Florida. The document addresses inquiries from potential bidders regarding the scope, requirements, and procedures for this progressive design-build contract. Key project details covered in the FAQs include clarification on the electrical building construction scope, design-build delivery methods, qualification requirements for design-build teams, and procedures for submitting questions and proposals. The document confirms that this is a progressive engagement model where design and construction phases occur concurrently, with specific emphasis on the phased approach to project delivery. Responses outline the evaluation criteria, insurance and bonding requirements, and technical specifications relevant to the electrical building component of the wastewater treatment facility upgrade.
The FAQs provide guidance on pricing submission procedures, insurance coverage minimums, and prevailing wage requirements applicable to the project. The document clarifies that the project follows progressive design-build contracting procedures, which typically involve initial design phase engagement followed by construction phase initiation pending approval of guaranteed maximum price (GMP) and design documents. Responses address questions regarding bonding, performance requirements, safety protocols, and compliance with applicable Florida statutes and local ordinances. The FAQs confirm that standard contract terms, warranties, and insurance requirements will apply to the selected design-build team, with emphasis on qualifications, experience with similar projects, and financial stability of participating firms.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PBCWUD PROJECT NO. 26-014R Frequently Asked Questions (FAQ)-1 Rev. 06-12-2026
Western Region Wastewater Treatment Facility Phase 2 Electrical Building & Resiliency Improvements Progressive Design-Build
PBCWUD Project No. 26-014R
Frequently Asked Questions (FAQ)
Q1 – What changes were made in the RFP compared with the original RFP?
Everything is the same except a PPT of electrical components was added. The PPT was based on a BODR developed earlier for this project.
Q2 –Can I resubmit the same proposal?
The same proposal may be submitted, however please change the project number to
26-014R and re-sign and re-date all required documents.
Q3 – How does SBE percent get calculated?
This project is grant funded so no affirmative procurement initiatives (APIs) are required.
Q4-Will you cancel this RFP again if you receive less than 3 proposals?
Palm Beach County has done extensive outreach to attract potential firms. If the above scenario happens, County will evaluate all proposals and make a decision per the County procurement code.
Q5-Do I need to resubmit plan holder request if I already did it in the original RFP?
Yes. This is a new RFP.
Q6. Can I request the information that was sent out in the original RFP?
Please submit a plan holder request and the documents will be provided.