This is Addendum No. 1 to a Progressive Design-Build Request for Proposal issued by the Palm Beach County Water Utilities Department for the Western Region Wastewater Treatment Facility Phase 2 Electrical Building & Resiliency Improvements (Project No. 26-014R). The project requires the procurement of new generator(s) with options of either one 1500kW or two 750kW units, along with a new elevated enclosure. The scope includes specifications for fuel type, voltage, emissions standards, and enclosure design, though final selections will be determined during the progressive design phase. The contract is rebid to increase competition after only one proposal was received on the initial solicitation, which was not opened. The Pre-Proposal Meeting has already occurred, with minutes distributed to interested parties. The deadline for submitting questions is Monday, November 2, 2026, at 5:00 PM, and the Design-Build firm selection is expected in December 2026 or January 2027. Proposals should be submitted as either a combined PDF and hard copy or thumb drive format.
Qualification requirements for Design-Build entities are detailed in the separate "26-014R WRWWTF Electrical Building Min Qualifications" document and the accompanying Advertisement. Firms must demonstrate integrated design-build team experience and comply with Palm Beach County Policy CW-O-094 regarding scoring and evaluation criteria. The SF330 form should include resumes and be completed by the Design-Builder entity along with any subconsultants or subcontractors. Bidders must complete the Conflict-of-Interest Disclosure Form and Prime Consultant Questionnaire as the Design-Builder. Interested Design-Build entities should submit a plan holder form to be contacted by trade contractors, and equipment suppliers may reach out to prospective D/B entities for technical discussions prior to final team selection. All equipment must comply with Palm Beach Water Utilities Minimum Design Standards, available at the referenced link.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
ADDENDUM NO. 1
PALM BEACH COUNTY WATER UTILITIES DEPARTMENT
WESTERN REGION WASTEWATER TREATMENT FACILITY PHASE 2
ELECTRICAL BUILDING & RESILIENCY IMPROVEMENTS
PROGRESSIVE DESIGN-BUILD
PBCWUD PROJECT NO. 26-014R
Date 10-01-2026
QUESTIONS AND ANSWERS:
Q1 – Please verify if the scope of the project requires new generators and a custom elevated enclosure, or if the project will be for a new enclosure only.
A1 –The project will need new generator(s) and new elevated enclosure. BODR has choices of (1)1500KW or (2) 750KW generators. Please note the choices in BODR are neither final nor the only choices. In design phase, we can discuss generator size, enclosure type (outdoor or in a building) and its location. For RFP purposes, please present your best idea.
Q2 – Whether the generator is expected to be newly manufactured, owner furnished/relocated or determined during progressive design.
A2 – Newly manufactured. It will be purchased through D/B team. The design regarding generator size, enclosure type, and location will be determined during progressive design.
Q3-When the selected Design-Build Entity/procurement authority is expected to be public.
A3- We expect to select the D/B firm in12/ 2026 or 01/2027. The result will be public.
Q4-Whether fuel, voltage, emissions, enclosure, controls/paralleling and approved manufacturer/equal requirements are currently available.
A4-For approved material/equipment list, please check Water Utilities Minimum Design Standards. Other mentioned components will be determined in progressive design.
Q5-Whether equipment suppliers should wait for the selected Design-Build Entity before submitting any technical information.
A5-Equipment suppliers are welcome to contact interested D/B entities and provide ideas.
To get a list of interested D/B entities, please email dzheng@pbcwater.com and ask for a plan holder list. D/B entities, please submit plan holder form if you want to be contacted by interested trade contractors.
Q6-Whether Brown & Caldwell and/or Wharton-Smith are eligible to participate.
A6-Both firms can participate.
https://discover.pbc.gov/waterutilities/Pages/MinimumDesignStandards.aspx https://discover.pbc.gov/waterutilities/Pages/MinimumDesignStandards.aspx mailto:dzheng@pbcwater.com
Page | 2
Q7-Could you please clarify why the County is rebidding this contract?
A7-Only 1 proposal was received. That proposal was not opened and returned to the firm. Per County policy, rebidding is chosen to increase the competition.
Q8- What is the scoring/evaluation criteria for proposals?
A8-Please see the link for County Policy CW-O-094.
cw-o-094.pdf
Q9-Is there an option for potential bidders to join the pre-proposal meeting virtually?
A9-Sorry. No. The meeting is in person and already happened. Meeting minutes was distributed.
Q10-Please confirm that we should provide a combination of narrative and exhibits to describe how we meet/exceed the requirements listed in the document titled '26-014R WRWWTF Electrical Building Min Qualifications.' Please confirm that this should be included as Section 7 of the combined PDF/hard copy document.
A10- Firm can choose the best way to demonstrate its qualification. How and where to demonstrate should be decided by the firm.
Q11-In the file named '26-014R WRWWTF Electrical Building Advertisement Signed' in the numbered section on the first page, under number 7, each of the first 6 sub-bullets aligns with requirements listed in the document titled '26-014R WRWWTF Electrical Building Min Qualifications' except the last bullet "Integrated Design-Build Team Experience." Please confirm, if there are specific items that should be covered in a narrative for this bullet point.
A11- For “Integrated Design-Build Team Experience” please refer to Min Qualification first page bullets 4. No specific requirement.
Q12-Should the file named '26-014R WRWWTF Electrical Building Design-Build D-B Entity Qualifications Questionnaire' also be included within Section 7 of the combined PDF/hard copy document after the above mentioned narrative and exhibits?
A12-There is no hard requirement where the document is included.
Q13-Should the GS-330 be completed as one entity (Contractor & Engineering Subconsultant) or should separate ones be submitted?
A13-In the past GS-330 is usually completed by D/B firm including the subconsultants or subcontractors.
Q14-What should be included and what can be included in the 20-page Letter of Interest document?
A14-No specific requirement for letter of interest.
Q15-The Conflict-of-Interest Disclosure Form refers to a Consultant/Annual Consultant.
The Prime Consultant Questionnaire also refers to the Prime Consultant. Should we fill out the forms as the "Design-Builder" as the entity submitting the forms?
https://www.pbcgov.com/pubInf/ppm/pdf/cw-o-094.pdf
Page | 3
A15-Yes, please fill out the forms as “Design-Builder”. We use the same forms for all
CCNA contracts, most of them are for “Prime Consultant”.
Q16-The SF330 includes a section for resumes. Are we also required to submit a separate set of resumes under Item 7, Design-Build Entity Minimum Requirements, in the advertisement?
A16-No, no separate set of resumes is needed if you already include in with SF330.
Q17-Please consider allowing submission of the proposal on a thumb drive instead of a
CD.
A17-Yes, thumb drive is good.
Q18-Should the file named '26-014R WRWWTF Electrical Building Design-Build Entity Volume of Work Form' also be included within Section 7 of the combined PDF/hard copy document after the above mentioned narrative and exhibits?
A18-Design-Build Entity Volume of Work is no longer required.
PROJECT CLARIFICATION
Deadline to ask questions: Monday November 2, 2026 5:00PM