233600 - Air Terminal Units R1.doc

DOC document 48 KB Posted

Attached to
Expand and Upgrade Building 42 for Laboratory
Solicitation number
36C25520R0073-0007
Issued by

About this file

This file contains technical specifications for air terminal units and related HVAC equipment for the Expand and Upgrade Building 42 for Laboratory project at the Department of Veterans Affairs. The specifications cover requirements for air terminal units, air flow control valves, coils, controls, and related components. Products must meet standards for leakage, sound levels, pressure independence, and airflow accuracy. Submittals are required addressing manufacturer qualifications, product data, test reports, and operation manuals. The project will be carried out under solicitation number 36C25520R0073-0007 issued by VA Veterans Health Administration VISN 15 to upgrade HVAC infrastructure in Building 42 at the specified location.

View the file

Other files

File Type Posted
MC-101.pdf PDF
36C25520R0073 0007.docx DOCX document
FINAL QUESTIONS AND ANSWERS 657-502.docx DOCX document
MQ-011.pdf PDF
MQ-008.pdf PDF
MQ-009.pdf PDF
074213.23 SF - METAL COMPOSITE MATERIAL WALL PANELS.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Expand & Upgrade Building 42 for Laboratory

VA Project No. 657-502

11-10-17

SECTION 23 36 00

AIR TERMINAL UNITS

PART 1 ‑ GENERAL

1.1 DESCRIPTION

Air terminal units, air flow control valves.

1.2 RELATED WORK

A.

Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic restraints for equipment.

B.

Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION: General mechanical requirements and items, which are common to more than one section of Division 23.

C.

Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT: Noise requirements.

D.

Section 23 31 00, HVAC DUCTS AND CASINGS: Ducts and flexible connectors.

E.

Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Valve operators.

F.

Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC: Flow rates adjusting and balancing.

G.

Section 23 82 16, AIR COILS: Heating and Cooling Coils pressure ratings.

1.3 QUALITY ASSURANCE

Refer to Paragraph, QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION.

1.4 SUBMITTALS

A.

Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.

B.

Manufacturer's Literature and Data:

1.

Air Terminal Units: Submit test data.

2.

Air flow control valves.

C.

Samples: Provide one typical air terminal unit for approval by the COR. This unit will be returned to the Contractor after all similar units have been shipped and deemed acceptable at the job site.

D.

Certificates:

1.

Compliance with paragraph, QUALITY ASSURANCE.

2.

Compliance with specified standards.

E.

Operation and Maintenance Manuals: Submit in accordance with paragraph, INSTRUCTIONS, in Section 01 00 00, GENERAL REQUIREMENTS.

1.5 APPLICABLE PUBLICATIONS

A.

The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B.

Air Conditioning and Refrigeration Institute (AHRI)/(ARI):

880‑08 Air Terminals Addendum to ARI 888-98 incorporated into standard posted 15th December 2002

C.

National Fire Protection Association (NFPA):

90A-09 Standard for the Installation of Air Conditioning and Ventilating Systems

D.

Underwriters Laboratories, Inc. (UL):

181‑08 Standard for Factory-Made Air Ducts and Air Connectors

E.

American Society for Testing and Materials (ASTM):

C 665-06 Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing

1.6 GUARANTY

In accordance with the GENERAL CONDITIONS

PART 2 ‑ PRODUCTS

2.1 General

A. Coils:

1. All Air-Handling Units: Provide aluminum fins and copper coils for all hot water reheat coils.

2.

Water Heating Coils:

a.

ARI certified, continuous plate or spiral fin type, leak tested at 2070 kPa (300 PSI).

b.

Capacity: As indicated, based on scheduled entering water temperature.

c.

Headers: Copper or Brass.

d.

Fins: Aluminum, maximum 315 fins per meter (8 fins per inch).

e.

Tubes: Copper, arrange for counter-flow of heating water.

f.

Water Flow Rate: Minimum 0.032 Liters/second (0.5 GPM).

g.

Provide vent and drain connection at high and low point, respectively of each coil.

h.

Coils shall be guaranteed to drain.

3.

Electric Heating Coils:

a.

ARI certified, spiral fin type.

b.

Capacity: As indicated, based on scheduled data.

c.

Coil: Enclosed copper tube, aluminum finned element of coiled nickel-chrome resistance wire centered in tubes and embedded in refractory material. Exposed helical coil of nickel-chrome resistance wire with refractory ceramic support bushings will not be allowed.

B.

Labeling: Control box shall be clearly marked with an identification label that lists such information as nominal CFM, maximum and minimum factory-set airflow limits, coil type and coil connection orientation, where applicable.

C.

Factory calibrate air terminal units to air flow rate indicated. All settings including maximum and minimum air flow shall be field adjustable.

D.

Dampers with internal air volume control: See section 23 31 00 HVAC DUCTS and CASINGS.

E.

Terminal Sound Attenuators: See Section 23 31 00 (HVAC DUCTS AND CASINGS).

2.2 AIR TERMINAL UNITS (BOXES)

A.

General: Factory built, pressure independent units, factory set‑field adjustable air flow rate, suitable for single duct applications. Use of dual-duct air terminal units is not permitted. Clearly show on each unit the unit number and factory set air volumes corresponding to the contract drawings. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC work assumes factory set air volumes. Coordinate flow controller sequence and damper operation details with the drawings and Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. All air terminal units shall be brand new products of the same manufacturer.

B.

Capacity and Performance: The Maximum Capacity of a single terminal unit shall not exceed 566 Liters/second (1,200 CFM) with the exception of operating rooms and Cystoscopy rooms, which shall be served by a single air terminal unit at a maximum of 1,250 Liters/second (3,000 CFM).

C.

Sound Power Levels:

Acoustic performance of the air terminal units shall be based on the design noise levels for the spaces stipulated in Section 23 05 41 (Noise and Vibration Control for HVAC Piping and Equipment). Equipment schedule (…) shall show the sound power levels in all octave bands. Terminal sound attenuators shall be provided, as required, to meet the intent of the design.

D.

Casing: Unit casing shall be constructed of galvanized steel no lighter than 0.85 mm (22 Gauge). Air terminal units serving the operating rooms and Cystoscopy rooms shall be fabricated without lining. Provide hanger brackets for attachment of supports.

1.

Lining material: Suitable to provide required acoustic performance, thermal insulation and prevent sweating. Meet the requirements of NFPA 90A and comply with UL 181 for erosion as well as ASTMC 665 antimicrobial requirements. Insulation shall consist of 13 mm (1/2 IN) thick non-porous foil faced rigid fiberglass insulation of 4-lb/cu.ft, secured by full length galvanized steel z-strips which enclose and seal all edges. Tape and adhesives shall not be used. Materials shall be non-friable and with surfaces, including all edges, fully encapsulated and faced with perforated metal or coated so that the air stream will not detach material. No lining material is permitted in the boxes serving operating rooms and Cystoscopy rooms.

2.

Access panels (or doors): Provide panels large enough for inspection, adjustment and maintenance without disconnecting ducts, and for cleaning heating coils attached to unit, even if there are no moving parts. Panels shall be insulated to same standards as the rest of the casing and shall be secured and gasketed airtight. It shall require no tool other than a screwdriver to remove.

3.

Total leakage from casing: Not to exceed 2 percent of the nominal capacity of the unit when subjected to a static pressure of 750 Pa (3 inch WG), with all outlets sealed shut and inlets fully open.

4.

Octopus connector: Factory installed, lined air distribution terminal. Provide where flexible duct connections are shown on the drawings connected directly to terminals. Provide butterfly-balancing damper, with locking means in connectors with more than one outlet. Octopus connectors and flexible connectors are not permitted in the Surgical Suite.

E.

Construct dampers and other internal devices of corrosion resisting materials which do not require lubrication or other periodic maintenance.

1.

Damper Leakage: Not greater than 2 percent of maximum rated capacity, when closed against inlet static pressure of 1 kPa (4 inch WG).

F.

Provide multi-point velocity pressure sensors with external pressure taps.

1.

Provide direct reading air flow rate table pasted to box.

G.

Provide static pressure tubes.

H.

Externally powered DDC variable air volume controller and damper actuator to be furnished under Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC for factory mounting on air terminal units. The DDC controller shall be electrically actuated.

2.3 AIR FLOW CONTROL VALVE (AFCV)

A.

Airflow control device shall be a venturi valve type air flow control valve.

B.

Pressure independent over a 150 Pa-750 Pa (0.6 inch WG – 3.0 inch WG) drop across valve.

C.

Volume control accurate to plus or minus 5% of airflow over an airflow turndown range of 16 to 1. No minimum entrance or exit duct diameters shall be required to ensure accuracy or pressure independence.

D.

Response time to change in command signal and duct static pressure within three seconds.

E.

16 gauge spun aluminum valve body and control device with continuous welded seam and 316 stainless steel shaft and shaft support brackets. Pressure independent springs shall be stainless steel. Shaft bearing surfaces shall be Teflon or polyester.

H.

Constant volume units:

1.

Actuator to be factory mounted to the valve.

2.

Closed loop control of airflow by way of flow feedback signal with less than 1 second response time.

3.

Shaft positioned using direct potentiometer measurement to produce a linear factory calibrated feedback.

4.

The maximum and minimum airflows shall be as scheduled.

I.

Variable volume units:

1.

Actuator to be factory mounted to the valve.

2.

Closed loop control of airflow by way of flow feedback signal with less than 1 second response time.

3.

Shaft positioned using direct potentiometer measurement to produce a linear factory calibrated feedback.

J.

Certification:

1.

Control device: factory calibrated to airflows detailed on plans using NIST traceable air stations and instrumentation having a combined accuracy of plus or minus 1% of signal over the entire range of measurement.

2.

Electronic airflow control devices: further calibrated and their accuracy verified to plus or minus 5% of signal at a minimum of eight different airflows across the full operating range of the device.

3.

All airflow control devices: individually marked with device specific, factory calibration data to include: tag number, serial number, model number, eight point characterization information (for electronic devices), and quality control inspection numbers.

PART 3 ‑ EXECUTION

3.1 INSTALLATION

A.

Work shall be installed as shown and according to the manufacturer’s diagrams and recommendations.

B.

Handle and install units in accordance with manufacturer's written instructions.

C.

Support units rigidly so they remain stationary at all times. Cross‑bracing or other means of stiffening shall be provided as necessary. Method of support shall be such that distortion and malfunction of units cannot occur.

D.

Locate air terminal units to provide a straight section of inlet duct for proper functioning of volume controls. See VA Standard Detail.

3.2 OPERATIONAL TEST

Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION.

‑ ‑ ‑ E N D ‑ ‑ ‑

AIR TERMINAL UNITS
23 36 00 - 5

File details come from the government source that posted it. Updated .