22-0022 Runway Rubber Removal - Technical Factors (02-02-22)

A. RUNWAY RUBBER REMOVAL

The Contractor shall provide a detailed course of action and work plan for the scope of work submitted under this request for proposal:

A1. Contractor shall provide a detailed course of action and work plan describing the following tasks:

Provide rubber removal and airfield markings as shown in the attached project drawings. The work plan shall follow all the requirements specified in the contract specifications and drawings, coordination for runway closure, phasing plan and material submittals; it shall also include a list of all equipment proposed to be used to accomplish all required tasks and the quantities that apply for each per the scope of work. Contractor shall include references to the contract specifications and drawings. Ensure schedule complies with runway working conditions. Performance period for this work is 210 days.

Runway closures are limited to weekends when aircraft operations are minimal and only prior coordination with the airfield manager.

A2. Past performance requirements:

The prime contractor and/or its sub-contractor shall have successfully completed a minimum of 3 projects within the past 3 years having similar scope of work per this contract and particularly have successfully performed a minimum of 348,000 SF of rubber removal in one weekend and painted a minimum total of 23,000 square feet of pavement markings on an active airfield within that same weekend period. Contractor shall submit points of contact of previous contracts to verify project information.