2026-CU-032_Addendum 3.pdf
PDF 2 MB Posted
- Solicitation number
- TCB26006227
- Issued by
- Rhode Island
About this file
This is an Addendum 3 document for the Rhode Island Department of Transportation's Statewide Stormwater Improvements PROTECT Grant project (Rhode Island Contract No. 2026-CU-032). The project will construct 89 stormwater treatment units (STUs) across 10 watersheds throughout Rhode Island. The scope of work encompasses soil management and disposal services, field office support, traffic control, mobilization, and installation of various treatment systems including hydrodynamic separators, infiltration swales, infiltration basins, underground infiltration systems, sand filters, wet basins, and disconnection systems. Major line items include hauling and stockpiling of contaminated soils (59,241 tons), soil disposal operations (approximately 14,353 to 50,000 tons depending on type), maintenance of erosion and sediment controls (lump sum with $30,000 minimum), 24 months of field office support, and one stabilized gravel paved lot. Bids are due September 25, 2026 at 1:00 PM EDT via electronic submission through Ocean State Procures. Questions must be submitted by September 16, 2026 at 12:00 PM EDT to M. Scott Stephens at (401) 574-8152.
The project is a federal-aid initiative subject to Davis-Bacon Act prevailing wage rates and the Work Hours Act of 1962, funded with an 80 percent FHWA and 20 percent State of Rhode Island cost share. Bidders must submit a proposal guaranty (bid bond) equal to 5 percent of the total bid amount from a surety company authorized to do business in Rhode Island, with the successful bidder required to furnish a performance bond equal to 100 percent of the contract price. Required insurance includes general liability ($1,000,000 per occurrence), workers compensation ($100,000 each accident), and automobile liability ($1,000,000 combined single limit). A contract administrative fee of 0.33 percent will be withheld from all payments. All proposals must be submitted electronically through Ocean State Procures; mailed, faxed, emailed, or hand-delivered proposals will not be accepted. Vendors must register in Ocean State Procures prior to bid submission and comply with anti-collusion, debarment certifications, and Title VI assurances. Detailed engineering drawings and site-specific specifications are provided in the Volume 2 Plan Set.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 3
ATTACHMENTS Page 1 of 4
September 24, 2026
STATE OF RHODE ISLAND
DEPARTMENT OF ADMINISTRATION
DIVISION OF PURCHASES BID NO. TCB. 26006227
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
RHODE ISLAND CONTRACT NO. 2026-CU-032
FEDERAL-AID PROJECT NO. STP-PROT(005)
STATEWIDE STORMWATER IMPROVEMENTS – PROTECT GRANT
This project includes constructing 89 stormwater treatment units (STUs) statewide (within 10 watersheds) in
Rhode Island. Work will be construction of the STUs and include, but not be limited to, installation of erosion controls; handling, hauling, stockpiling, and management of contaminated soil; storm drainage; utility adjustments; temporary and permanent striping; flagpersons; temporary construction signs; new signage; field office; mobilization; maintenance and protection of traffic.
CITIES OF CRANSTON, EAST PROVIDENCE, PAWTUCKET, PROVIDENCE & WOONSOCKET
TOWNS OF COVENTRY, CUMBERLAND, EAST GREENWICH, JOHNSTON, LINCOLN, NORTH KINGSTOWN, NORTH PROVIDENCE, NORTH SMITHFIELD, PORTSMOUTH, SMITHFIELD & WEST GREENWICH
NOTICE TO PROSPECTIVE BIDDERS
ADDENDUM NO. 3 Prospective bidders and all concerned are hereby notified of the following changes in the
Plans, Specifications, Proposal and Distribution of Quantities for this contract. These changes shall be incorporated in the Plans, Specifications, Proposal and Distribution of Quantities, and shall become an integral part of the Contract Documents.
A. Vendor Questions & Answers
Question 15. Sheet CS-11 paragraph 17 states the requirements for a designated SWPPP contact person that needs to be available on site throughout the duration of the project – can you state the requirements or the qualification such a person must possess in order to qualify for said role?
Answer:
The requirements are stated on CS-11 Paragraph 17.
The Contractor must designate a SWPPP contact person, experienced in storm water management on construction sites, who is available on site throughout the life of the project, and who has the authority to direct contractor’s personnel and/or subcontractor’s personnel in carrying out corrective actions requested by RIDOT’s Qualified Plan Inspector and/or
Construction Manager.
The Contractor’s designated SWPPP contact person must be available to oversee all SWPPP related activities and to accompany the RIDOT’s Qualified Inspector, as requested, when inspections are performed. The Contractor shall identify the SWPPP contact person at the Pre-
Construction Meeting. The SWPPP contact person should be at the Pre-Construction Meeting, if possible.
Please note that the SWPPP inspector can be a different individual.
Please be advised that revisions to Specifications Section 206-212 now indicates that erosion and pollution controls shall be routinely inspected and maintained by the Contractor’s certified inspector, at the Contractor’s own expense (in accordance with the SWPPP and
SESC Plan & 212.03 Construction Methods).
PROTECT - GRANT
Addendum No. 3
ATTACHMENTS Page 2 of 4
A Certified Inspector (see 212.03.2a) is required and can be a Certified Professional in
Erosion and Sediment Control (CPESC), a Certified Professional in Stormwater Quality
(CPSWQ) or a RI Registered Professional (if competency is equal to CPESC or CPSWQ).
Question 16. Several project sites call for new epoxy pavement markings. Epoxy pavement markings are typically not applied until 2 weeks after asphalt paving is completed and are also not installed in colder temperatures as they require certain surface temp to allow proper adhesion. Please confirm that temporary waterborne pavement markings will allow the closeout of any STU items requiring epoxy pavement markings and the contractor is allowed to circle back when asphalt is set and/or temperature permits to install final epoxy pavement markings.
Installation of temporary waterborne pavement markings is acceptable to achieve the Interim
Completion, as defined in JS Section 108.10000, for locations requiring epoxy pavement markings. The contractor is allowed to install final epoxy pavement markings when asphalt is set and/or temperature permits. Final epoxy pavement markings will be required to achieve
Substantial Completion for these locations.
Question 17. Item 44, Item Code 999.9931 – Infiltration Basin (SCP-MOS-052):
The SCAP boundary shown by the shorter dotted line terminates at each end near the LOD line and does not appear to form a closed area. Please clarify the intended limits of the SCAP.
Is the SCAP boundary intended to follow the LOD line between the two termination points to complete the area, or should the two ends of the SCAP boundary be connected by a straight line?
Yes, the SCAP boundary is intended to follow the LOD/curb along the Exit 39C ramp to form a closed area.
Question 18. Item 44, Item Code 999.9931 – Infiltration Basin (SCP-MOS-052):
Is the approximately 50' x 86' area shown to the right of the gabion baskets intended to be a sand filter? The plans do not appear to provide any notes or material callouts identifying what material or treatment is required within this area. Please clarify the intended material and construction requirements for this area.
In the 50' x 86' area shown on Drainage & Utility Plan No. 8, there is a callout that reads
"SCP MOS 052 INFILTRATION BASIN." The STU should be constructed in accordance with the Infiltration Basin details and cross-sections shown on Details No. 2. Additionally, Note No. 4 on Drainage & Utility Plan No. 8 states "Test Pits indicate approximate 12-inch layer of organic material at elevation 28.00 to be over excavated and replaced with suitable material from the site."
Question 19. At STU locations where the State/EOR pre-characterization sampling identified soils as non-jurisdictional, the Contractor intends to live-load excess soil and transport it to the
Contractor’s privately owned facility for future reuse as clean soil. The facility is not a licensed disposal facility and will accept the soil based on the State/EOR analytical data provided in the Contract Documents.
ATTACHMENTS Page 3 of 4
The STRA allows off-site reuse sampling “or as alternatively agreed to” by the destination owner, RIDEM and RIDOT. Please confirm whether RIDOT/RIDEM will accept the existing
State/EOR analytical data as the required characterization, allowing these soils to be transported directly to the Contractor’s facility without additional Contractor sampling, testing, or temporary stockpiling.
The initial sampling was performed to assess the feasibility of the STUs at each location.
Excavated soil is considered Unclassified. Section 202.03.4.7 of the Blue Book requires the
Contractor to "Maintain the unclassified soil stockpile until the soil has been reused to backfill the excavation at the point of origin. Test, classify, and approve the excess unclassified stockpile soil for proper disposal off-site. See Subsection 202.02.3 for testing criteria."
Sampling shall consist of 1 sample for every 500 cubic yards collected via multi-point composite as described in the STRA work plan.
Question 20. The response to the following question appears to be incomplete:
"In Response to Q&A #7 below - RIDOT’s previous response states that the Contractor shall perform testing on soil to be disposed of off-site in accordance with the receiving facility’s requirements. Please clarify whether this requires the Contractor to collect & analyze new soil samples in all cases. If the Contractor’s proposed receiving facility reviews the State/EOR pre-characterization analytical data included in the Contract Documents & confirms that the existing data is sufficient for acceptance of soil from STU's identified as non-jurisdictional, with no additional sampling required by that facility, will RIDOT/RIDEM allow the
Contractor to dispose of that soil based upon the existing project analytical data without performing additional Contractor sampling?
If additional Contractor sampling is still required under that circumstance, please identify the required sampling frequency, analytical parameters, the spe?
Yes due to the limitations of the number of characters the response was truncated, therefore all vendors should review the posted Addendums where all Q&A is posted as well.
B. Document Attachments
1. 2026-CU-032 Plan Files – Volume 1
a. Drainage & Utility Plan No. 34 - Plan Sheet 44
Delete Plan Sheet 44 in its entirety and replace it with revised Plan Sheet 44 (R-1) attached to this
Addendum No. 3. The sheet has been revised.
b. Drainage & Utility Plan No. 35 - Plan Sheet 45
Delete Plan Sheet 45 in its entirety and replace it with revised Plan Sheet 45 (R-1) attached to this
c. Details No. 10 - Plan Sheet 56
Delete Plan Sheet 56 in its entirety and replace it with revised Plan Sheet 56 (R-1) attached to this
ATTACHMENTS Page 4 of 4
2. 2026-CU-032 CS Pages
a. Sequence of Construction – Page CS-9
Delete Page CS-9 (R-1) in its entirety and replace it with Page CS-9 (R-2) attached to this
Addendum No. 3. The Sequence of Construction has been revised.
D
P.O.B.
BK. 9836, PG. 342
& SURVEYOR'S DESCRIPTION
PROPOSED EASEMENT
HISTORICAL DISTRICT OVERLAY
ZONE "M-1"
P.O.B.
BK. 9836, PG. 342
Z O
N E
"M -1"
(M
IX
E D
U
SE
IN
D
U
ST
R
IA
L
Z O
N E
"M -M
U -90"
ZONE "M-2"
T O
V E
R
LA
Y
D
P.O.B.
BK. 9836, PG. 342
& SURVEYOR'S DESCRIPTION
PROPOSED EASEMENT
HISTORICAL DISTRICT OVERLAY
ZONE "M-1"
P.O.B.
BK. 9836, PG. 342
Z O
N E
"M -1"
(M
IX
E D
U
SE
IN
D
U
ST
R
IA
L
Z O
N E
"M -M
U -90"
ZONE "M-2"
T O
V E
R
LA
Y
LOD
PROMENADE STREET
PT-BATH-SOIL CELLS
SUBSURFACE
BIORETENTION CELLS
SEE DETAIL
CB
RIM=10.16
INV=8.3
12" STEEL
TP-BATH-1P
SHGT EL. <5.9
10+00 11+00 12+00 12+25
20' - 6" SOLID-WALL PVC
S=0.010 FT/FT
TRANSITION TO 6'' PERFORATED PVC
DISTRIBUTION PIPE
INV. = 11.2'
6" PERFORATED PVC
UNDERDRAIN
INV. = 8.8'
TRANSITION TO 6'' SOLID-WALL PVC
INV. = 8.8'
6'' PERFORATED PVC
DISTRIBUTION PIPE
INV. = 11.2'
Y-SPLIT TRANSITION TO SOLID-WALL PVC
INV. = 10.6'
6" PERFORATED PVC UNDERDRAIN
INV. = 8.6'
TRANSITION TO 6'' SOLID-WALL PVC
INV.=8.6'
TRANSITION TO 6'' PERFORATED PVC
INV. = 10.5'
6'' PERFORATED PVC DISTRIBUTION PIPE
INV.=10.5
BATH
STR
EET
DSW
43.1.0
43.3.0
BATH-1
TNP
CCB
IP
BATH-2
6.3.1
IP
BATH-3
IP
LOD
SEE NOTE 2
PBM-2
DFP
200 FT CRMC CONTIGUOUS AREA
FIELD DELINEATED TOP OF BANK
(MAN MADE SHORELINE)
14' - 6'' SOLID-WALL PVC
S =0.007 FT/FT
52' - 6'' SOLID-WALL PVC
S=0.007 FT/FT
26' - 6'' SOLID-WALL PVC
S=0.007 FT/FT
6'' SOLID-WALL PVC JUNCTION
INV. = 8.5'
37' - 6'' SOLID-WALL PVC
S=0.007 FT/FT
7' - 6'' SOLID-WALL PVC
S=0.007 FT/FT DFP
FDP-2
DRAINAGE STRUCTURE TABLE
STR. #
BATH-1
BATH-3
STATION & OFFSET
STA. 11+31, 47' LT.
STA. 11+40, 100' LT.
RIM ELEVATION
RIM=10.16
RIM=14.30
INVERTS
INV.(OUT)=8.30
INV.(IN)=8.30
INV.(OUT)=11.40
NOTES
EX. CB
RI STD. 4.4.0 CB W/ 4' SUMPINV.(IN)=11.00
BATH-2 STA. 10+48, 81' LT. RIM=14.25 RI STD. 4.4.0 CB W/ 4' SUMP
S76°45'38"E 225.00'
BATH STREET CONST.
4.4.0 4'
6.3.1
4.4.0 4'
CFS
CFS
WOONASQUATUCKET RIVER
FLOW
EBB
RHH
7.6.0M
RHH
7.6.0M
PT-BATH-PM
PAVEMENT REMOVAL
STA 10+00.00
N: 271866.5025 E: 348730.4501
STA 12+25.00
N: 271814.9724 E: 348949.4699
24'-1"±
18'-9"±
4'-11"
5'-4" 9'-4"
19'-9"
18'-2"
'-9
SEE NOTE 7
DRAINAGE & UTILITY PLAN NO. 34
PT-BATH-PM & PT-BATH-SOIL CELLS BATH STREET, PROVIDENCE
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
1 Cedar Street Suite 400 Providence, RI 02903 401.272.8100
RHODE ISLAND
STATEWIDE STORMWATER IMPROVEMENTS
PROTECT GRANT
STATEWIDE VOLUME 1
NOTES (MODIFIED):
1. SEE DETAILS NO. 10 FOR SITE-SPECIFIC DETAILS.
2. EXISTING 6-INCH DUCTILE IRON FIRE SERVICE TO REMAIN AND BE
PROTECTED IN PLACE. CONTRACTOR TO VERIFY UTILITY DEPTH.
3. MAINTAIN A MINIMUM SLOPE OF 0.007 FT/FT ON SOLID-WALL
DRAIN PIPES.
4. CONTRACTOR SHALL RESTRIPE ANY LOCATIONS THAT ARE
AFFECTED BY THE IMPROVEMENTS WITH EPOXY RESIN
PAVEMENT MARKINGS TO THEIR PRE-EXISTING CONDITIONS.
5. CONSTRUCTION FOR THIS LOCATION MUST BE COMPLETED BY
JUNE 30, 2027.
6. CONTRACTOR SHALL FIELD SURVEY EXISTING WHEELCHAIR
RAMP TO ESTABLISH GRADES PRIOR TO REPLACEMENT.
CONTRACTOR SHALL REPLACE RAMP TO MEET GRADES, MATCH
PRE-EXISTING DIMENSIONS, AND BE COMPLIANT. INSTALL A 5'
DETECTABLE WARNING SYSTEM PANEL TO MATCH THE WIDTH OF
THE RAMP STONE.
R-1
200 FT CRMC
CONTIGUOUS AREA
TOE OF EMBANKMENT
1-100
1-101
1-102 1-103
1-104
1-105
1-106
FIELD DELINEATED
INLAND EDGE OF
COASTAL FEATURE6"
6" CI
15 14
TP-DESOTO-1P
SHGT EL.=8.5
4+00 5+00 5+70
LOD
CFS
CCP
3'-12" RCP
S=0.010'/FT
A
B CCP
LS
RRB
CFS
RIMS=15.1±
INV OUT=12.6
SUMP EL.=9.6
RIMS=15.2±
INV OUT=12.7
SUMP EL.=9.7
7.3.0S
3'-12" RCP
S=0.010'/FT
7.3.0
7.3.1
W
OONASQUATUCKET RIVER
DFP
FDP
CCB
IP
7.3.7
6.3.2
3.5.0
CCB
IP
7.3.7
6.3.2
3.5.0
LOD
43.1.0
RHH
DSW
43.1.0
RHH
DSW
LOR
PBM-2
LOR
PBM-2
PT-SOTO-UIS
UNDERGROUND INFILTRATION
SYSTEM (R-TANK UD) (SEE DETAIL)
INVS IN=12.5
INV OUT=12.7
PT-SOTO-BS
ARMORED CHANNEL
(SEE DETAIL)
PT-SOTO-BS
INLET SETTLING STRUCTURE
(SEE DETAIL)
TOP EL.= 15.1
INVERT IN (PAVED WATERWAY) = 14.3
INVERT OUT=12.5
INSPECTION
PORT (TYP)
100-YEAR FLOODWAY
NO FILL BEYOND THIS POINT
MAINTAIN DRIVEWAY
ACCESS THROUGHOUT
CONSTRUCTION
39' - 12'' RCP
EXTENTS OF DOUBLE
LAYER R-TANK UD UNITS
VEGETATED AREA
BRUSH LINE
EDGE OF RIVER (BASE FLOW)
APPROXIMATE
PROPERTY LINE (TYP.)
DESOTO STREET CONST.
N25°06'54"E 270.00'
STA 4+64.8 ±
12.0' RT ±
STA 4+91.1 ±
11.2' RT ±
STA 4+66.7 ±
12.0' LT ±
STA 5+05.9 ±
11.9' LT ±
DE SOTO STREET
EXTENTS OF TRIPLE
LAYER R-TANK UD UNITS
FLOW
EBB
FDP-T
INSTALL TEMPORARY PAVEMENT PRIOR TO BLOCKING
DE SOTO STREET FOR STU CONSTRUCTION (SEE
DETAIL). FOLLOWING ROADWAY REPAVING, REMOVE
TEMPORARY PAVEMENT AND LOAM AND SEED.
2.3.0
STA 3+75.00
N: 269116.3012 E: 344957.0632
STA 5+70.00
N: 269292.8655 E: 345039.8281
EXTENTS OF STONE
BACKFILL
14.7±
14.3
8.4.0M
EXISTING SIGN
TO REMAIN
ROAD
WORK
AHEAD
W20-1 30"X30"
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
1 Cedar Street Suite 400 Providence, RI 02903 401.272.8100
RHODE ISLAND
STATEWIDE STORMWATER IMPROVEMENTS
PROTECT GRANT
STATEWIDE VOLUME 1
DRAINAGE & UTILITY PLAN NO. 35
PT-SOTO-BS & PT-SOTO-UIS DE SOTO STREET, PROVIDENCE
NOTES:
1. SEE DETAILS NO. 11 FOR SITE-SPECIFIC DETAILS.
2. CONTRACTOR SHALL RE-USE LOAM FROM SITE FOR FINAL
GRADING AND PLANTINGS. IMPORTED LOAM SHALL ONLY BE
ALLOWED AT DIRECTION OF ENGINEER.
3. CONTRACTOR SHALL RESTRIPE ANY LOCATIONS THAT ARE
AFFECTED BY THE IMPROVEMENTS WITH EPOXY RESIN
PAVEMENT MARKINGS TO THEIR PRE-EXISTING CONDITIONS.
4. CONSTRUCTION FOR THIS LOCATION MUST BE COMPLETED BY
JUNE 30, 2027.
5. CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN FULL
USER ACCESS TO THE GREENWAY BIKE PATH AT ALL TIMES.
TEMPORARY BARRIER AND TEMPORARY CONSTRUCTION
FENCING SHALL BE INSTALLED AS NEEDED TO PROTECT USERS
FROM THE CONSTRUCTION SITE.
PT-BATH-PM & PT-BATH-SOIL CELLS
SUBSURFACE BIORETENTION CELLS
NOT TO SCALE
4" PINE BARK MULCH OVER 4" LOAM BORROW
INSPECTION RISER
1" AIR SPACE BETWEEN SILVA CELL DECK AND PLANTING SOIL
SCREW CELL DECKS TO FRAMES AFTER SNAPPING IN PLACE, TYP.
GEOGRID 'J' 6'' MIN. BELOW BACKFILL AT BASE
3/16'' X 14'' ZIP TIES, ATTACHING GEOGRID TO SOIL CELLS AT EACH
LEVEL AND AT CELL DECK
BACKFILL INSTALLED IN 8'' LIFTS, WITHIN 4''-6'' FROM TOP OF
DECKS, COMPACTED TO 95%
ANCHOR EACH SOIL CELL TO GROUND WITH FOUR (4) 10'' SPIKES,
<10MM DIA., SEE CELL BASE FOR SPIKE HOLE, TYP.SUBGRADE BELOW GEOTEXTILE FABRIC AND AGGREGATE BASE
COURSE, COMPACTED TO 95%
4'' AGGREGATE SUB BASE, COMPACTED TO 95%
PLANTING SOIL PER SOIL CELL SPECIFICATIONS, INSTALLED IN 8''
LIFTS (2 LIFTS PER CELL)
FILTER FABRIC
SOIL CELL BASE SLOPE TO MAX. 5%
GEOTEXTILE FABRIC, 18" MIN. OVERLAP PAST EXCAVATION
GENERAL NOTES (MODIFIED)
1. THE STORMWATER TREATMENT UNIT (STU) SHALL BE CONSTRUCTED IN CONFORMANCE WITH APPENDIX F.5
(CONSTRUCTION STANDARDS/SPECIFICATIONS FOR FILTER BMPs) OF THE RHODE ISLAND STORMWATER
DESIGN AND INSTALLATION STANDARDS MANUAL (RISDISM) AMENDED MARCH 2015.
2. POLYPROPYLENE SOIL CELL UNITS SHALL BE SILVA CELLS MANUFACTURED BY DEEPROOT GREEN
INFRASTRUCTURE, LLC OR APPROVED EQUAL.
3. CARE SHALL BE TAKEN TO AVOID COMPACTION OF NATIVE SUBGRADE MATERIAL IN ALL INFILTRATION AND FILTER BED AREAS. IF CONSTRUCTION VEHICLES ARE DRIVEN OVER THE PREPARED SUBGRADE, THE SOIL MUST BE SUITABLY AMENDED AND TILLED TO RESTORE ITS INFILTRATION CAPACITY AS DIRECTED BY THE
ENGINEER.
4. UNLESS NOTED, ALL FILTER FABRIC SHALL BE MIRAFI 140N OR APPROVED NON-WOVEN GEOTEXTILE EQUAL.
5. AGGREGATE FOR BASE SHALL BE CRUSHED GRAVEL CONFORMING TO SUBSECTION M01.09, COLUMN II OF
THE STANDARD SPECIFICATIONS.
6" PERFORATED PVC UNDERDRAIN (TYP.)
OUTLET HOOD DETAIL
NOT TO SCALE
NOTE: OUTLET HOOD SHALL BE A SNOUT MODEL 12R
MANUFACTURED BY BMP INC, LYME CT OR APPROVED EQUAL.
.0
0"
7.75"
9.00"
5.
FRONT SIDE
PLAN
1" PVC ANTI-SIPHON
PIPE ADAPTER
6.50"
7.
9.
7.
.2 5"
18.00"
14.00"
0.75"
REMOVABLE
WATERTIGHT ACCESS
PORT, 6" OPENING
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
1 Cedar Street Suite 400 Providence, RI 02903 401.272.8100
RHODE ISLAND
STATEWIDE STORMWATER IMPROVEMENTS
PROTECT GRANT
STATEWIDE VOLUME 1
DETAILS NO. 10
CS-9
The Woonasquatucket River Watershed Council (WRWC) will be performing work on the Bath Street Pocket Park immediately following completion of these
STUs.
The Contractor must request a partial final completion on these STUs on or before June 30, 2027 in order for RIDOT to schedule an interim final inspection.
The Contractor must complete the punchlist work items, receive partial acceptance, and release the site to the WRWC.
o STUs PT-SOTO-BS & PT-SOTO-UIS (Volume 1 – Drainage & Utility Plan No. 35) shall be constructed before June 30, 2027.
The WRWC will be performing work on the Soto Street immediately following completion of these STUs.
The Contractor must request a partial final completion on these STUs on or before June 30, 2027 in order for RIDOT to schedule an interim final inspection.
The Contractor must complete the punchlist work items, receive partial acceptance, and release the site to the WRWC.
o STU PT-EPVD-BSE/BSW (Volume 1 – Drainage & Utility Plan No. 36) shall be constructed between July 1, 2027 and August 20, 2027.
o SCP-LWR-016, STU-WB-021B, SCP-LWR-022, and STU-WB-118B shall be constructed between June 15, 2028 and August 30, 2028.
• The Contractor shall coordinate, cooperate and schedule his work and all segments thereof with the Engineer, other contractors, utility owners, and applicable local authorities, so as to minimize impacts to the construction schedule.
• The Department expects the Contractor to work year-round. There is no Winter Shutdown for this project. The standard Winter Shutdown is being overridden with three working days/week during the typical Winter Shutdown period. The Contractor shall consider this time period when developing the baseline schedule.
• In accordance with the Endangered Species Act, all tree removal/trimming shall be completed between November 1 and April 14. See conservation measures in Appendix O for details.
• In accordance with the Endangered Species Act, temporary lighting shall be directed away from suitable habitat between April 15 and October 31, using downward-facing, full cutoff lens lights when installing new or replacing existing permanent lights. See conservation measures in
Appendix O for details.
• In cases of emergency and/or as directed by the Engineer, the Contractor shall move equipment to allow for the passage of emergency vehicles and/or open closed lanes to maintain traffic flow.
7. Transportation Management Plan
The Transportation Management Plan (TMP) is provided in the Appendix B. In the event of a discrepancy between information in the TMP and information elsewhere in the Contract Documents, the TMP shall govern.
The Contractor’s TMP Implementation Manager shall sign and return the TMP to the Department’s
Project Manager in advance of the Pre-Construction Conference.
R-2