2026-CH-034 Addendum No. 1.pdf

PDF 564 KB Posted

Attached to
Pavement Improvements - Putnam Pike
Solicitation number
TCB26006443
Issued by
Providence County, Rhode Island

About this file

This is Addendum No. 1 to Rhode Island Department of Transportation Contract No. 2026-CH-034 for pavement improvements on Putnam Pike, issued August 6, 2026. The addendum modifies the original contract documents, which encompass full-width micro-milling and overlay, traffic signal installation and upgrades, ADA-compliant sidewalks and curbing, drainage improvements, and miscellaneous incidental work across 106 line items. Key modifications include revisions to Job Specific (JS) pages addressing specification changes for section 938.1000 (Price Adjustments), section 109.06.b (Payment Frequency), and section 702.9902 (ADA Frame and Grate). The Distribution of Quantities (DOQ) sheet was revised to correct mathematical errors in Item 401.3005 (Class 9.5 HMA for Miscellaneous Work), reducing the quantity from 1,000 tons to 500 tons to exclude asphalt quantities already accounted for in other line items. Item specifications and quantities were updated, with Item 401.3005 specifically revised to reflect the corrected calculations. Federal wage rates were updated from the May 18, 2026 determination to the July 30, 2026 determination, effective for all prevailing wage requirements under the Davis-Bacon Act.

The addendum establishes a Base Price for Liquid Asphalt Cement at $712.50 per ton and Diesel Fuel at $3.3513 per gallon, with current price adjustments available on the Rhode Island Department of Transportation website. Progress payments will be made on a minimum bi-weekly and maximum monthly basis, subject to a 2 percent retainage. The updated federal wage determination reflects rates for multiple trade classifications including laborers, equipment operators, truck drivers, carpenters, electricians, and other skilled trades, with effective dates ranging from 2022 to 2025. Questions and answers appended to the addendum address clarifications regarding the scope of stormwater management work (infiltration swales and sand filter systems), confirmation that polymer injection for soil stabilization is not included in the contract, and technical corrections to the distribution of quantities for asphalt materials. The addendum was issued in response to bidder inquiries and mathematical discrepancies identified in the original contract documents, with all modifications incorporated as integral parts of the contract documents for the August 14, 2026 bid deadline.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO PROSPECTIVE BIDDERS

RI CONTRACT NO. 2026-CH-034

TCB 26006433

Pavement Improvements – Putnam Pike

ADDENDUM NO. 1

August 6, 2026

Prospective bidders and all concerned are hereby notified of the following changes in the Plans, Specifications, Proposal, and Distribution of Quantities for this contract. These changes shall be incorporated in the Plans, Specifications, Proposal, and Distribution of Quantities, and shall become an integral part of the Contract Documents.

A. JS Pages

1. Page JS-i

Remove Page JS-i in its entirety and replace it with revised Page JS-i (R-1) attached to this Addendum No. 1. Table of Contents has been revised.

2. Page JS-14

Remove Page JS-14 in its entirety and replace it with revised Page JS-14 (R-1) attached to this Addendum No. 1. Specification 938.1000 has been revised.

3. Page JS-42

Add new Page JS-42 attached to this Addendum No. 1. Section 109.06.b has been revised.

B. DOQ

1. Sheet TOC-1

Remove Sheet TOC-1 in its entirety and replace it with revised Sheet TOC-1(R-1) attached to this Addendum No. 1. Revisions have been marked in red.

2. Sheet 19

Remove Sheet 19 in its entirety and replace it with revised Sheet 19 (R-1) attached to this

Addendum No. 1. Revisions have been marked in red.

C. OSP File

1. Item Specifications and Quantities

Item and quantity changes include the following:

Item 401.3005 – Quantity changed.

https://webprocure.proactiscloud.com/BidReport/state/ri?dc=1&nexturl=BidList&bid=134271&editSol=false

NOTICE TO PROSPECTIVE BIDDERS

RI CONTRACT NO. 2026-CH-034

TCB 26006433

Pavement Improvements – Putnam Pike

ADDENDUM NO. 1

August 6, 2026

D. Federal Wage Rates

1. Federal Wage Rate Determination

Remove Federal Wage Rates – 05-18-2026 Pages 1 through 23 in their entirety and replace them with revised Federal Wage Rates - 07-30-2026 Pages 1 (R-1) through 17 (R-1), attached to this Addendum No. 1. Federal Wage Rates have been updated.

E. Other

1. Questions and Answers

Questions and answers that have been submitted are attached to this Addendum No. 1.

https://webprocure.proactiscloud.com/BidReport/state/ri?dc=1&nexturl=BidList&bid=134271&editSol=false

INDEX (R-1)

SPECIFICATIONS – JOB SPECIFIC

CODE TITLE PAGE

Addendum No. 1 JS-i

Rhode Diesel Emissions Reduction Program JS-1

106.01.1 Buy American JS-2

108.1000 Prosecution and Progress JS-5

401.9901 Modified Class 9.5 HMA With Pay Adjustments PG76e-34 JS-6

702.9902 ADA Frame and Grate JS-7

704.9901 Reconstruct Drainage Structure JS-8

711.9901 Infiltration Swale (STU-PRW-100) JS-9

711.9902 Sand Filter System (STU-PRW-518) JS-11

817.9901 Repairs to Reaper Brook Culvert JS-13

938.1000 Price Adjustments JS-14

999.9901 Miscellaneous Work JS-15

T11.9910 Dual Mast Arm (25x50) Gal Steel Traffic Signal Post & Fndn. Std 19.2.0 JS-16

T12.0300 Modify Existing Traffic Signal Controller/Cabinet JS-17

T12.9901 Field Monitoring Unit (FMU) JS-18

T12.9904 Point to Point Ethernet Radio Unit JS-24

T12.9910 Remove Existing Controller And Appurtenances And JS-27

Install In New Cabinet On New Foundation

T12.9911 Remove Existing Cabinet, Controller, And Appurtenances and Install On New Foundation

T12.9921 Reconfigure Adaptive Control JS-29

T12.9922 Remove, Relocate, Reconfigure Antenna JS-31

T13.9901 Video and Radar Vehicle Detection System JS-32

T13.9904 Extension Bracket for Pedestrian Detector JS-40

T13.9911 Meter Socket w Manual Bypass JS-41

109.06 Payment for Work JS-42

(R-1) Date: 6/26/26

RICN: 2026-CH-034

Addendum No. 1 JS-14

CODE 938.1000

PRICE ADJUSTMENTS

DESCRIPTION:

a. Liquid Asphalt Cement.* The Base Price of Liquid Asphalt Cement as required to implement Subsection 938.03.1 of the Standard Specifications is $ 712.50 per ton.

* In the case of modified asphalt binder, this price adjustment provision shall only apply to the neat liquid asphalt component. This provision shall not apply to the modifier component, manufacture, storage, transportation or other associated costs.

b. Diesel Fuel. The Base Price of Diesel Fuel as required to implement Subsection

938.03.2 of the Standard Specifications is $ 3.3513 per gallon.

Current price adjustments can be found at the following web address:

http://www.dot.ri.gov/business/contractorsandconsultants.php

Date: 8/3/26

RICN: 2026-CH-034

Addendum No. 1 JS-42

Remove Section 109.06 b from the RIDOT Standard Specifications for Road & Bridge

Construction, February 2026 in its entirety and replace with:

109.06 PAYMENT FOR WORK.

b. Frequency. The Department will make progress payments a minimum of bi-weekly and maximum of monthly based on the Contractor Invoice provided according to established Department procedures. Progress payments will be subject to a 2 percent retainage.

Date:8/5/2026

Item Item Code Description UM Quantity Page

1 201.0321 CLEARING AND GRUBBING SY 300 1

2 201.0414 REMOVE AND DISPOSE PIPE - ALL SIZES LF 10 2

3 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES LF 1,600 3

4 201.0418 REMOVE AND DISPOSE HYDRANT EACH 1 4

5 201.0428 REMOVE AND DISPOSE FRAME AND GRATE OR FRAME AND COVER EACH 146 5

6 201.0436 REMOVAL AND DISPOSAL OF CURBING LF 13,800 6

7 201.0437 REMOVAL AND DISPOSAL OF DRAINAGE AND UTILITY STRUCTURES EACH 20 7

8 201.0610 REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, SERVICE, AND STREET SIGNS EACH 165 8

9 201.0628 REMOVE AND DISPOSE GROUND MOUNTED SIGN PANEL AND STRUCTURE EACH 2 9

10 202.0100 EARTH EXCAVATION CY 3,700 10

11 206.0301 COMPOST FILTER SOCK LF 4,200 11

12 209.0220 SACK INSERT INLET PROTECTION EACH 135 12

13 212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS LS 1 13

14 213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL LF 1,400 14

15 302.0100 GRAVEL BORROW SUBBASE COURSE CY 3,700 15

16 303.0100 SPECIAL GRADED AGGREGATE FOR SHAPING AND TRIMMING DRIVEWAYS OR SHOULDERS CY 10 16

17 401.0510 HOT MIX ASPHALT PREPARATION - PARTIAL DEPTH SY 100,500 17

18 401.2100 MODIFIED CLASS 12.5 HMA TON 1,000 18

19 401.3005 CLASS 9.5 HMA FOR MISCELLANEOUS WORK TON 500 19

20 401.3100 MODIFIED CLASS 9.5 HMA TON 1,300 20

21 401.9901 MODIFIED CLASS 9.5 HMA WITH PAY ADJUSTMENTS PG76E-34 TON 16,500 21

22 416.0100 PAY ADJUSTMENTS EACH 150,000 22

23 701.4311 SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE - ALL SIZES LF 15 23

24 702.0501 FRAME AND GRATE - ALL SIZES AND TYPES EACH 126 24

25 702.0502 FRAME AND COVER - ALL SIZES AND TYPES EACH 18 25

26 702.0529 INLET STONE - ALL SIZES AND TYPES EACH 12 26

27 702.0545 APRON STONE - ALL SIZES AND TYPES EACH 66 27

28 702.1000 MANHOLE, CATCH BASIN, OR DROP INLET ASSEMBLY - (0' - 12' DEPTH) EACH 2 28

29 704.0500 RECONSTRUCT DRAINAGE STRUCTURE EACH 33 29

30 706.9000 PLUG AND CAP PIPE - ALL SIZES EACH 1 30

31 707.0100 ADJUST DRAINAGE OR UTILITY STRUCTURE TO GRADE EACH 90 31

32 708.9040 CLEANING AND FLUSHING PIPE ALL SIZES LF 15,000 32

33 708.9044 CLEANING AND FLUSHING VERTICAL STRUCTURE EACH 160 33

34 709.0400 CONCRETE FOR THRUST BLOCKS, HEADWALLS, AND MISC PURPOSES CY 5 34

35 711.0400 WATERWAY SY 20 35

36 711.9901 INFILTRATION SWALE STU-PRW-100 LS 1 36

37 711.9902 SAND FILTER SYSTEM SCP-PRW-518 LS 1 37

38 712.0300 GATE BOX - ALL TYPES EACH 50 38

39 713.0100 ADJUST CURB STOP OR UTILITY BOX TO GRADE EACH 240 39

40 714.8163 POST TYPE HYDRANT EACH 1 40

41 817.9901 REPAIRS TO REAPER BROOK CULVERT LS 1 41

42 901.1000 STEEL BEAM GUARDRAIL LF 1,400 42

43 901.1050 GUARDRAIL CONNECTION TO END POST EACH 1 43

44 901.1100 STEEL BEAM GUARDRAIL APPROACH END TREATMENT EACH 2 44

45 901.1200 GUARDRAIL END TREATMENT PLATFORM EACH 2 45

46 901.1300 STEEL BEAM GUARDRAIL ANCHORAGE TRAILING END SECTIONS EACH 3 46

47 905.1000 PORTLAND CEMENT CONCRETE SIDEWALKS AND DRIVEWAYS SY 15,000 47

48 905.2000 ASPHALT CONCRETE SIDEWALKS AND DRIVEWAYS SY 2,000 48

49 906.0310 GRANITE CURB LF 800 49

50 906.0320 PRECAST CONCRETE CURB LF 13,600 50

51 906.0700 REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT, CIRCULAR ALL TYPES LF 4,500 51

52 915.0200 HIGHWAY BOUNDS REINFORCED CONCRETE STANDARD 14.1.0 EACH 27 52

53 917.0105 REMOVE AND REPLACE RURAL MAILBOX POST WITH STANDARD 15.1.0 EACH 14 53

54 917.0106 REMOVE AND REPLACE MULTIPLE MAILBOX MOUNTING WITH STANDARD 15.2.0 EACH 9 54

55 918.0200 RURAL MAILBOXES 2-DOOR EACH 46 55

56 919.0101 TEST PITS EACH 10 56

57 920.0320 RIPRAP R-3, R-4, R-5 STANDARD 8.3.0 SY 20 57

58 929.0110 FIELD OFFICE PMO 36 58

59 936.0110 MOBILIZATION LS 1 59

60 937.0100 FURNISH, INSTALL, MAINTAIN, AND MOVE TEMPORARY TRAFFIC PROTECTION LS 1 60

Quantity Backup Table of Contents

PUTNAM PIKE

R.I. Contract No. - 2026-CH-034

TCB26006443

KMikolazyk Text Box (R-1)

KMikolazyk Text Box Addendum No. 1

KMikolazyk Text Box

TOC-1

Project: Putnam Pike Estimator Date

RICN GAF 6/2/2026

PTS ID Rev. Date

OSP ID GAF 7/30/2026

Office ID

Sheet 19

ITEM CODE: 401.3005 CLASS 9.5 HMA FOR MISCELLANEOUS WORK

UM: TON

2.0" Factor

PROJECT WIDE *Ave. Roundup

LF Width* SY SY Tons

800 1 88.89 89 12

13,600 1 1511.11 1512 196

4500 1 500.00 500 65

2000.00 2000 0

1000.00 1000 130

As Directed by Engineer 72

TOTAL 500 TON

2026-CH-034

2607Q

TCB26006443

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

42132.01

DISTRIBUTION OF QUANTITIES

Temp. driveways, Ref 905.2000

Patching & Potholes

Curb Installation, Pot Hole Repair, Ref. Item 906.0310

Ref. Item 906.0320

Ref. Item 906.0700

Ref. Item 905.2000

Bituminous Sidewalks & Driveways

KMikolazyk Text Box Addendum No. 1

KMikolazyk

(R-1)

"General Decision Number: RI20260001 07/30/2026

State: Rhode Island

Construction Types: Building, Heavy and Highway

Counties: Rhode Island Counties of Bristol, Kent, Newport, Providence and Washington

Includes Marine Construction Projects

Modification Number Publication Date 2 01/30/2026 3 05/18/2026 4 07/30/2026

ASBE0006-006 09/01/2024

Rates Fringes

HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,

WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,

BAGGING & DISPOSING OF ALL INSULATION MATERIALS,

WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM

MECHANICAL SYSTEMS).................................$ 49.91 36.63

ASBE0006-008 09/01/2024

Rates Fringes

ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF

ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,

COATINGS & FINISHES TO ALL TYPES OF MECHANICAL

SYSTEMS)............................................$ 49.91 36.63

BOIL0029-001 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 50.62 28.82

BRRI0003-001 06/01/2022

Rates Fringes

BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14

BRRI0003-002 09/01/2022

Rates Fringes

MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34

BRRI0003-003 09/01/2022

Rates Fringes

MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61

CARP0330-001 06/02/2025

Rates Fringes

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 1/17

KMikolazyk Text Box (R-1)

KMikolazyk

Addendum No. 1

DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE

DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER

RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR

ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.)

...................................................$ 60.83 30.50

DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER,

THE DIVER AND DIVER TENDER SHALL RECEIVE THE

PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00

PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING

THE DIVER.) ......................................$ 48.68 30.50

CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON

FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC

UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35

FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR

ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL

GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION

OR ON SETBACK: $.50 PER HOUR ADDITIONAL.)...........$ 47.88 30.50

PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE

SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,

WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:

$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE

SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND

ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.

THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"":

$1.00 PER HOUR ADDITIONAL...........................$ 41.53 29.35

WELDER (WORK ON FREE-STANDING STACKS, CONCRETE

SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,

WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:

$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR

CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE

ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR

ADDITIONAL.) .......................................$ 48.68 30.50

CARP1121-002 04/21/2025

Rates Fringes

MILLWRIGHT..........................................$ 45.72 31.50

ELEC0099-002 06/01/2025

Rates Fringes

ELECTRICIAN (WORK OF A HAZARDOUS NATURE, OR WHERE

THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR,

EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER

HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL

IN COMBINED SEWER OUTFALL: 20% PER HOUR

ADDITIONAL.)........................................$ 56.11 24.74

TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS

NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE

FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED

LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS

BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%

PER HOUR ADDITIONAL.)...............................$ 42.09 19.71

ELEV0039-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC (ADDTIONAL FRINGE TO BE PAID A.

PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8%

BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF

6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF

SERVICE AS VACATION PAY CREDIT.)....................$ 64.52 38.44

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 2/17

KMikolazyk Text Box (R-1)

KMikolazyk

ENGI0057-001 12/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND

DERRICKS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET

AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;

210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $

5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND

OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400

FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW

YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY

FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,

VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY

EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A

HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)

(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 51.30 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER,

LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,

SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,

GRADERS, FRONT END LOADER (3 YDS. AND OVER),

VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,

FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL

BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE

PLANTS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET

AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;

210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $

5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND

OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400

FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW

YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY

FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,

VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY

EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A

HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)

(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 49.30 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS,

INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180

FEET AND OVER + $ 3.00; 210 FEET AND OVER + $

4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND

OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350

FEET AND OVER + $ 9.00; 400 FEET AND OVER +

$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO

WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS

SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:

$5.00 PER HOUR ADDITIONAL.).........................$ 44.92 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 3/17

KMikolazyk Text Box (R-1)

KMikolazyk

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM

LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $

2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND

OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270

FEET AND OVER + $ 7.00; 300 FEET AND OVER + $

8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND

OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO

WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS

SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:

$5.00 PER HOUR ADDITIONAL.) ...$ 42.07 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER

LOADER, TRACTOR, SCRAPER, COMBINATION LOADER

BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3

YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.

CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM

LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +

$2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND

OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270

FEET AND OVER + $ 7.00; 300 FEET AND OVER + $

8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND

OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO

WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS

SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:

$5.00 PER HOUR ADDITIONAL.).........................$ 48.35 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM

LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $

2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND

OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270

FEET AND OVER + $ 7.00; 300 FEET AND OVER + $

8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND

OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO

WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS

SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:

$5.00 PER HOUR ADDITIONAL.).........................$ 39.15 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL

PERSONS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET

AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;

210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 4/17

KMikolazyk Text Box (R-1)

KMikolazyk

5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND

OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400

FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW

YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY

FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,

VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY

EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A

HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)

(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 33.15 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE

CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT

PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR

COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS: 150

FEET AND OVER + $ 2.00; 180 FEET AND OVER + $

3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND

OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300

FEET AND OVER + $ 8.00; 350 FEET AND OVER + $

9.00; 400 FEET AND OVER + $10.00); (PAID

HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,

CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE

WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE

HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.).....$ 45.00 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS,

INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180

FEET AND OVER + $ 3.00; 210 FEET AND OVER + $

4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND

OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350

FEET AND OVER + $ 9.00; 400 FEET AND OVER +

$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO

WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS

SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:

$5.00 PER HOUR ADDITIONAL.).........................$ 48.92 29.95

ENGI0057-003 12/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND

DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT.

AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00;

210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $

5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND

OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400

FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S

DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,

VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 5/17

KMikolazyk Text Box (R-1)

KMikolazyk

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00

PER HOUR ADDITIONAL.)...............................$ 50.57 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 2: DIGGING MACHINE, ROSS CARRIER,

LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,

SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,

FRONT END LOADER (3 YDS. AND OVER), VIBRATORY

HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING

JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND

OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240

FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $

7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND

OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID

HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL

DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS

DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS

DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK

IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE

HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)

............................$ 48.57 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE

PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS,

INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180

FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $

4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND

OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350

FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +

$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S

DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR

DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL.)........................................$ 48.35 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS,

INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180

FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $

4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND

OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350

FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +

$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S

DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR

DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL.)........................................$ 44.35 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS,

INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180

FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 6/17

KMikolazyk Text Box (R-1)

KMikolazyk

4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND

OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350

FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +

$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S

DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR

DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL.)........................................$ 41.50 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS,

TRACTOR, GRADER, SCRAPER,COMBINATION LOADER

BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3

YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.

CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM

LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $

2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND

OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270

FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $

8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND

OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00

PER HOUR ADDITIONAL.)...............................$ 47.65 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 7: WELL POINT INSTALLATION CREW. (BOOM

LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $

2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND

OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270

FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $

8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND

OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00

PER HOUR ADDITIONAL.)...............................$ 47.22 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER,

WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND

ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM

LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $

2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND

OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270

FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $

8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND

OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:

$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00

PER HOUR ADDITIONAL.)...............................$ 44.54 29.95

ENGI0057-005 12/01/2025

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 7/17

KMikolazyk Text Box (R-1)

KMikolazyk

Rates Fringes

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1:

CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,

HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE

DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE

PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S

DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,

VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 46.45 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2:

DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN

HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD

PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,

FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,

DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER

BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,

CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER

MACHINES, ROTATING TELEHANDLERS, SPMT TYPE

EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S

DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR

DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY.......................................$ 44.45 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3:

WELLPOINT INSTALLATION AND DRILL/BORING MACHINE

ASSISTANTS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 39.15 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4:

UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE

DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE

PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S

DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,

VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 25.75 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5:

SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS

IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID

FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 33.15 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 8/17

KMikolazyk Text Box (R-1)

KMikolazyk

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6:

OILERS ON CRANES AND DECKHANDS. (ANY EMPLOYEE WHO

WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY. PAID

HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL

DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS

DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS

DAY.)...............................................$ 39.73 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7:

COMBINATION LOADER / BACKHOES, FRONT-END LOADERS

(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,

BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF

ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,

OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES.

(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN

WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE

HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 43.43 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8:

GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS,

LIGHT PLANTS, WELDING MACHINES, PUMPS AND

COMPRESSORS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 38.70 29.95

IRON0037-001 09/16/2025

Rates Fringes

IRONWORKER..........................................$ 43.03 33.53

LABO0271-001 12/03/2023

Rates Fringes LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems............$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator.........$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors.........................$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster.............................................$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 5: Toxic

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 9/17

KMikolazyk Text Box (R-1)

KMikolazyk

Waste Remover.......................................$ 39.00 26.90

LABO0271-002 11/27/2022

Rates Fringes

LABORER (HEAVY AND HIGHWAY CONSTRUCTION):

COMPRESSED AIR: GROUP 1:Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner:

motor person & all others in compressed air ........$ 55.40 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION):

COMPRESSED AIR: GROUP 2: Change house attendant, powder watchperson, top person on iron ............$ 52.93 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION):

COMPRESSED AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone...............................$ 42.45 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator....................................$ 46.00 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:

GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:

GROUP 3: Hazardous waste work within the ""HOT"" zone.$ 42.45 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1:

Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries........$ 33.05 24.05

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2:

Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder;

Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer ...........$ 35.75 24.85

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3:

Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster...........$ 36.50 24.85

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4:

Flagger & signaler..................................$ 29.00 24.85

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5:

Toxic waste remover ................................$ 33.05 24.05

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR

CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM

MAN.................................................$ 41.50 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR

CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN

& LABORER...........................................$ 35.60 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST

BORING: DRILLER.....................................$ 41.95 24.15

LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 10/17

KMikolazyk Text Box (R-1)

KMikolazyk

BORING: LABORER.....................................$ 41.95 24.15

PAIN0011-005 06/01/2025

Rates Fringes

PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60

PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &

STRUCTURAL STEEL)...................................$ 41.57 26.60

PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60

PAINTER (TAPER).....................................$ 38.82 25.80

PAINTER (WALL COVERER)..............................$ 38.57 25.80

PAIN0011-006 06/01/2024

Rates Fringes

GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL.

PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)..........$ 41.63 26.15

PAIN0011-011 06/01/2024

Rates Fringes

PAINTER (BRIDGE WORK)...............................$ 57.85 26.40

PAIN0035-008 06/01/2011

Rates Fringes

SIGN PAINTER........................................$ 24.79 13.72

PLAS0040-001 01/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (BUILDING

CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING

SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR

MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE:

$.30 PER HOUR ADDITIONAL.)..........................$ 44.75 29.10

PLAS0040-002 01/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY

CONSTRUCTION).......................................$ 40.45 25.30

PLAS0040-003 01/01/2025

Rates Fringes

PLASTERER...........................................$ 45.52 29.43

PLUM0051-002 08/25/2025

Rates Fringes

PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50

ROOF0033-004 12/01/2025

Rates Fringes

ROOFER..............................................$ 47.49 31.44

SFRI0669-001 04/01/2025

Rates Fringes

SPRINKLER FITTER....................................$ 53.76 33.44

SHEE0017-002 06/01/2025

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 11/17

KMikolazyk Text Box (R-1)

KMikolazyk

Rates Fringes

SHEET METAL WORKER..................................$ 44.42 41.94

TEAM0251-001 05/01/2025

Rates Fringes

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS

(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1

YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED

150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL

RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2

WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S

PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST

SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS

FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A

MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL

DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB

SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER

APPLICABLE RATE.) ...................$ 31.86 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE

PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON

THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5

YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR

OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;

5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE

YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE.) .....$ 32.01 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE

PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON

THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5

YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR

OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;

5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE

YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE.) .....$ 32.06 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 12/17

KMikolazyk Text Box (R-1)

KMikolazyk

4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE

PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON

THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5

YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR

OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;

5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE

YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE.) .....$ 32.11 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL

FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1

YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED

150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL

RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2

WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S

PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST

SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS

FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A

MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL

DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB

SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER

APPLICABLE RATE.) ...................$ 32.21 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO

BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY

AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS

DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE

EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE

CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE

WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT

LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING

THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S

PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID

VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID

VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL

BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR

EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A

MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL

DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB

SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER

APPLICABLE RATE.) ...................$ 32.61 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING

2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 13/17

KMikolazyk Text Box (R-1)

KMikolazyk

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON

THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5

YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR

OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;

5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE

YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE.)

.................................................$ 32.81 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35

TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1

YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED

150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL

RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2

WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S

PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST

SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS

FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A

MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL

DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB

SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER

APPLICABLE RATE.) ...................$ 32.31 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR

OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1

YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED

150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL

RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2

WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S

PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST

SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS

FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A

MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL

DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB

SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER

APPLICABLE RATE.) ...................$ 32.56 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID:

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON

THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5

YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR

OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;

8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 14/17

KMikolazyk Text Box (R-1)

KMikolazyk

5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE

YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .