2026-CH-034 Addendum No. 1.pdf
PDF 564 KB Posted
- Attached to
- Pavement Improvements - Putnam Pike
- Solicitation number
- TCB26006443
- Issued by
- Providence County, Rhode Island
About this file
This is Addendum No. 1 to Rhode Island Department of Transportation Contract No. 2026-CH-034 for pavement improvements on Putnam Pike, issued August 6, 2026. The addendum modifies the original contract documents, which encompass full-width micro-milling and overlay, traffic signal installation and upgrades, ADA-compliant sidewalks and curbing, drainage improvements, and miscellaneous incidental work across 106 line items. Key modifications include revisions to Job Specific (JS) pages addressing specification changes for section 938.1000 (Price Adjustments), section 109.06.b (Payment Frequency), and section 702.9902 (ADA Frame and Grate). The Distribution of Quantities (DOQ) sheet was revised to correct mathematical errors in Item 401.3005 (Class 9.5 HMA for Miscellaneous Work), reducing the quantity from 1,000 tons to 500 tons to exclude asphalt quantities already accounted for in other line items. Item specifications and quantities were updated, with Item 401.3005 specifically revised to reflect the corrected calculations. Federal wage rates were updated from the May 18, 2026 determination to the July 30, 2026 determination, effective for all prevailing wage requirements under the Davis-Bacon Act.
The addendum establishes a Base Price for Liquid Asphalt Cement at $712.50 per ton and Diesel Fuel at $3.3513 per gallon, with current price adjustments available on the Rhode Island Department of Transportation website. Progress payments will be made on a minimum bi-weekly and maximum monthly basis, subject to a 2 percent retainage. The updated federal wage determination reflects rates for multiple trade classifications including laborers, equipment operators, truck drivers, carpenters, electricians, and other skilled trades, with effective dates ranging from 2022 to 2025. Questions and answers appended to the addendum address clarifications regarding the scope of stormwater management work (infiltration swales and sand filter systems), confirmation that polymer injection for soil stabilization is not included in the contract, and technical corrections to the distribution of quantities for asphalt materials. The addendum was issued in response to bidder inquiries and mathematical discrepancies identified in the original contract documents, with all modifications incorporated as integral parts of the contract documents for the August 14, 2026 bid deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RI Code of Regulations Title 220-RICR-30-00.pdf | ||
| Feb_2026_Blue_Book_RIDOT_Standard_Specifications_for_Road_and_Bridge_Construction.pdf | ||
| 2026-CH-034 JS Pages.pdf.crdownload | CRDOWNLOAD file | |
| 2026-CH-034 PLANS.pdf.crdownload | CRDOWNLOAD file | |
| 2026-CH-034 DOQ.pdf | ||
| RIDOT_Bridge_Standards.pdf | ||
| RIDOT_Standard_Detail_Drawings.pdf | ||
| 2026-CH-034 CS Pages.pdf.crdownload | CRDOWNLOAD file | |
| 2026-CH-034 JS Pages.pdf | ||
| TCB26006443_Jul_20_26_solicitation_doc.pdf | ||
| TCB26006443_Aug_10_26_solicitation_doc.pdf | ||
| 2026-CH-034 PLANS.pdf | ||
| FHWA 1273.pdf | ||
| Provisions - General.pdf | ||
| 2026-CH-034 CS Pages.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO PROSPECTIVE BIDDERS
RI CONTRACT NO. 2026-CH-034
TCB 26006433
Pavement Improvements – Putnam Pike
ADDENDUM NO. 1
August 6, 2026
Prospective bidders and all concerned are hereby notified of the following changes in the Plans, Specifications, Proposal, and Distribution of Quantities for this contract. These changes shall be incorporated in the Plans, Specifications, Proposal, and Distribution of Quantities, and shall become an integral part of the Contract Documents.
A. JS Pages
1. Page JS-i
Remove Page JS-i in its entirety and replace it with revised Page JS-i (R-1) attached to this Addendum No. 1. Table of Contents has been revised.
2. Page JS-14
Remove Page JS-14 in its entirety and replace it with revised Page JS-14 (R-1) attached to this Addendum No. 1. Specification 938.1000 has been revised.
3. Page JS-42
Add new Page JS-42 attached to this Addendum No. 1. Section 109.06.b has been revised.
B. DOQ
1. Sheet TOC-1
Remove Sheet TOC-1 in its entirety and replace it with revised Sheet TOC-1(R-1) attached to this Addendum No. 1. Revisions have been marked in red.
2. Sheet 19
Remove Sheet 19 in its entirety and replace it with revised Sheet 19 (R-1) attached to this
Addendum No. 1. Revisions have been marked in red.
C. OSP File
1. Item Specifications and Quantities
Item and quantity changes include the following:
Item 401.3005 – Quantity changed.
https://webprocure.proactiscloud.com/BidReport/state/ri?dc=1&nexturl=BidList&bid=134271&editSol=false
NOTICE TO PROSPECTIVE BIDDERS
RI CONTRACT NO. 2026-CH-034
TCB 26006433
Pavement Improvements – Putnam Pike
ADDENDUM NO. 1
August 6, 2026
D. Federal Wage Rates
1. Federal Wage Rate Determination
Remove Federal Wage Rates – 05-18-2026 Pages 1 through 23 in their entirety and replace them with revised Federal Wage Rates - 07-30-2026 Pages 1 (R-1) through 17 (R-1), attached to this Addendum No. 1. Federal Wage Rates have been updated.
E. Other
1. Questions and Answers
Questions and answers that have been submitted are attached to this Addendum No. 1.
https://webprocure.proactiscloud.com/BidReport/state/ri?dc=1&nexturl=BidList&bid=134271&editSol=false
INDEX (R-1)
SPECIFICATIONS – JOB SPECIFIC
CODE TITLE PAGE
Addendum No. 1 JS-i
Rhode Diesel Emissions Reduction Program JS-1
106.01.1 Buy American JS-2
108.1000 Prosecution and Progress JS-5
401.9901 Modified Class 9.5 HMA With Pay Adjustments PG76e-34 JS-6
702.9902 ADA Frame and Grate JS-7
704.9901 Reconstruct Drainage Structure JS-8
711.9901 Infiltration Swale (STU-PRW-100) JS-9
711.9902 Sand Filter System (STU-PRW-518) JS-11
817.9901 Repairs to Reaper Brook Culvert JS-13
938.1000 Price Adjustments JS-14
999.9901 Miscellaneous Work JS-15
T11.9910 Dual Mast Arm (25x50) Gal Steel Traffic Signal Post & Fndn. Std 19.2.0 JS-16
T12.0300 Modify Existing Traffic Signal Controller/Cabinet JS-17
T12.9901 Field Monitoring Unit (FMU) JS-18
T12.9904 Point to Point Ethernet Radio Unit JS-24
T12.9910 Remove Existing Controller And Appurtenances And JS-27
Install In New Cabinet On New Foundation
T12.9911 Remove Existing Cabinet, Controller, And Appurtenances and Install On New Foundation
T12.9921 Reconfigure Adaptive Control JS-29
T12.9922 Remove, Relocate, Reconfigure Antenna JS-31
T13.9901 Video and Radar Vehicle Detection System JS-32
T13.9904 Extension Bracket for Pedestrian Detector JS-40
T13.9911 Meter Socket w Manual Bypass JS-41
109.06 Payment for Work JS-42
(R-1) Date: 6/26/26
RICN: 2026-CH-034
Addendum No. 1 JS-14
CODE 938.1000
PRICE ADJUSTMENTS
DESCRIPTION:
a. Liquid Asphalt Cement.* The Base Price of Liquid Asphalt Cement as required to implement Subsection 938.03.1 of the Standard Specifications is $ 712.50 per ton.
* In the case of modified asphalt binder, this price adjustment provision shall only apply to the neat liquid asphalt component. This provision shall not apply to the modifier component, manufacture, storage, transportation or other associated costs.
b. Diesel Fuel. The Base Price of Diesel Fuel as required to implement Subsection
938.03.2 of the Standard Specifications is $ 3.3513 per gallon.
Current price adjustments can be found at the following web address:
http://www.dot.ri.gov/business/contractorsandconsultants.php
Date: 8/3/26
RICN: 2026-CH-034
Addendum No. 1 JS-42
Remove Section 109.06 b from the RIDOT Standard Specifications for Road & Bridge
Construction, February 2026 in its entirety and replace with:
109.06 PAYMENT FOR WORK.
b. Frequency. The Department will make progress payments a minimum of bi-weekly and maximum of monthly based on the Contractor Invoice provided according to established Department procedures. Progress payments will be subject to a 2 percent retainage.
Date:8/5/2026
Item Item Code Description UM Quantity Page
1 201.0321 CLEARING AND GRUBBING SY 300 1
2 201.0414 REMOVE AND DISPOSE PIPE - ALL SIZES LF 10 2
3 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES LF 1,600 3
4 201.0418 REMOVE AND DISPOSE HYDRANT EACH 1 4
5 201.0428 REMOVE AND DISPOSE FRAME AND GRATE OR FRAME AND COVER EACH 146 5
6 201.0436 REMOVAL AND DISPOSAL OF CURBING LF 13,800 6
7 201.0437 REMOVAL AND DISPOSAL OF DRAINAGE AND UTILITY STRUCTURES EACH 20 7
8 201.0610 REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, SERVICE, AND STREET SIGNS EACH 165 8
9 201.0628 REMOVE AND DISPOSE GROUND MOUNTED SIGN PANEL AND STRUCTURE EACH 2 9
10 202.0100 EARTH EXCAVATION CY 3,700 10
11 206.0301 COMPOST FILTER SOCK LF 4,200 11
12 209.0220 SACK INSERT INLET PROTECTION EACH 135 12
13 212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS LS 1 13
14 213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL LF 1,400 14
15 302.0100 GRAVEL BORROW SUBBASE COURSE CY 3,700 15
16 303.0100 SPECIAL GRADED AGGREGATE FOR SHAPING AND TRIMMING DRIVEWAYS OR SHOULDERS CY 10 16
17 401.0510 HOT MIX ASPHALT PREPARATION - PARTIAL DEPTH SY 100,500 17
18 401.2100 MODIFIED CLASS 12.5 HMA TON 1,000 18
19 401.3005 CLASS 9.5 HMA FOR MISCELLANEOUS WORK TON 500 19
20 401.3100 MODIFIED CLASS 9.5 HMA TON 1,300 20
21 401.9901 MODIFIED CLASS 9.5 HMA WITH PAY ADJUSTMENTS PG76E-34 TON 16,500 21
22 416.0100 PAY ADJUSTMENTS EACH 150,000 22
23 701.4311 SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE - ALL SIZES LF 15 23
24 702.0501 FRAME AND GRATE - ALL SIZES AND TYPES EACH 126 24
25 702.0502 FRAME AND COVER - ALL SIZES AND TYPES EACH 18 25
26 702.0529 INLET STONE - ALL SIZES AND TYPES EACH 12 26
27 702.0545 APRON STONE - ALL SIZES AND TYPES EACH 66 27
28 702.1000 MANHOLE, CATCH BASIN, OR DROP INLET ASSEMBLY - (0' - 12' DEPTH) EACH 2 28
29 704.0500 RECONSTRUCT DRAINAGE STRUCTURE EACH 33 29
30 706.9000 PLUG AND CAP PIPE - ALL SIZES EACH 1 30
31 707.0100 ADJUST DRAINAGE OR UTILITY STRUCTURE TO GRADE EACH 90 31
32 708.9040 CLEANING AND FLUSHING PIPE ALL SIZES LF 15,000 32
33 708.9044 CLEANING AND FLUSHING VERTICAL STRUCTURE EACH 160 33
34 709.0400 CONCRETE FOR THRUST BLOCKS, HEADWALLS, AND MISC PURPOSES CY 5 34
35 711.0400 WATERWAY SY 20 35
36 711.9901 INFILTRATION SWALE STU-PRW-100 LS 1 36
37 711.9902 SAND FILTER SYSTEM SCP-PRW-518 LS 1 37
38 712.0300 GATE BOX - ALL TYPES EACH 50 38
39 713.0100 ADJUST CURB STOP OR UTILITY BOX TO GRADE EACH 240 39
40 714.8163 POST TYPE HYDRANT EACH 1 40
41 817.9901 REPAIRS TO REAPER BROOK CULVERT LS 1 41
42 901.1000 STEEL BEAM GUARDRAIL LF 1,400 42
43 901.1050 GUARDRAIL CONNECTION TO END POST EACH 1 43
44 901.1100 STEEL BEAM GUARDRAIL APPROACH END TREATMENT EACH 2 44
45 901.1200 GUARDRAIL END TREATMENT PLATFORM EACH 2 45
46 901.1300 STEEL BEAM GUARDRAIL ANCHORAGE TRAILING END SECTIONS EACH 3 46
47 905.1000 PORTLAND CEMENT CONCRETE SIDEWALKS AND DRIVEWAYS SY 15,000 47
48 905.2000 ASPHALT CONCRETE SIDEWALKS AND DRIVEWAYS SY 2,000 48
49 906.0310 GRANITE CURB LF 800 49
50 906.0320 PRECAST CONCRETE CURB LF 13,600 50
51 906.0700 REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT, CIRCULAR ALL TYPES LF 4,500 51
52 915.0200 HIGHWAY BOUNDS REINFORCED CONCRETE STANDARD 14.1.0 EACH 27 52
53 917.0105 REMOVE AND REPLACE RURAL MAILBOX POST WITH STANDARD 15.1.0 EACH 14 53
54 917.0106 REMOVE AND REPLACE MULTIPLE MAILBOX MOUNTING WITH STANDARD 15.2.0 EACH 9 54
55 918.0200 RURAL MAILBOXES 2-DOOR EACH 46 55
56 919.0101 TEST PITS EACH 10 56
57 920.0320 RIPRAP R-3, R-4, R-5 STANDARD 8.3.0 SY 20 57
58 929.0110 FIELD OFFICE PMO 36 58
59 936.0110 MOBILIZATION LS 1 59
60 937.0100 FURNISH, INSTALL, MAINTAIN, AND MOVE TEMPORARY TRAFFIC PROTECTION LS 1 60
Quantity Backup Table of Contents
PUTNAM PIKE
R.I. Contract No. - 2026-CH-034
TCB26006443
KMikolazyk Text Box (R-1)
KMikolazyk Text Box Addendum No. 1
KMikolazyk Text Box
TOC-1
Project: Putnam Pike Estimator Date
RICN GAF 6/2/2026
PTS ID Rev. Date
OSP ID GAF 7/30/2026
Office ID
Sheet 19
ITEM CODE: 401.3005 CLASS 9.5 HMA FOR MISCELLANEOUS WORK
UM: TON
2.0" Factor
PROJECT WIDE *Ave. Roundup
LF Width* SY SY Tons
800 1 88.89 89 12
13,600 1 1511.11 1512 196
4500 1 500.00 500 65
2000.00 2000 0
1000.00 1000 130
As Directed by Engineer 72
TOTAL 500 TON
2026-CH-034
2607Q
TCB26006443
200 Main Street
Pawtucket, RI 02860
Tel. 401.726.4084
Fax: 401.728.1533
42132.01
DISTRIBUTION OF QUANTITIES
Temp. driveways, Ref 905.2000
Patching & Potholes
Curb Installation, Pot Hole Repair, Ref. Item 906.0310
Ref. Item 906.0320
Ref. Item 906.0700
Ref. Item 905.2000
Bituminous Sidewalks & Driveways
KMikolazyk Text Box Addendum No. 1
KMikolazyk
(R-1)
"General Decision Number: RI20260001 07/30/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of Bristol, Kent, Newport, Providence and Washington
Includes Marine Construction Projects
Modification Number Publication Date 2 01/30/2026 3 05/18/2026 4 07/30/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
Rates Fringes
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
Rates Fringes
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
Rates Fringes
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
Rates Fringes
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 06/02/2025
Rates Fringes
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 1/17
KMikolazyk Text Box (R-1)
KMikolazyk
Addendum No. 1
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE
DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER
RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR
ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.)
...................................................$ 60.83 30.50
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER,
THE DIVER AND DIVER TENDER SHALL RECEIVE THE
PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00
PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING
THE DIVER.) ......................................$ 48.68 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON
FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC
UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35
FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR
ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL
GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION
OR ON SETBACK: $.50 PER HOUR ADDITIONAL.)...........$ 47.88 30.50
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE
SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND
ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.
THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"":
$1.00 PER HOUR ADDITIONAL...........................$ 41.53 29.35
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR
CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE
ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR
ADDITIONAL.) .......................................$ 48.68 30.50
CARP1121-002 04/21/2025
Rates Fringes
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
Rates Fringes
ELECTRICIAN (WORK OF A HAZARDOUS NATURE, OR WHERE
THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR,
EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER
HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL
IN COMBINED SEWER OUTFALL: 20% PER HOUR
ADDITIONAL.)........................................$ 56.11 24.74
TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.)...............................$ 42.09 19.71
ELEV0039-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (ADDTIONAL FRINGE TO BE PAID A.
PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8%
BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF
6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF
SERVICE AS VACATION PAY CREDIT.)....................$ 64.52 38.44
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 2/17
KMikolazyk Text Box (R-1)
KMikolazyk
ENGI0057-001 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 51.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180
FEET AND OVER + $ 3.00; 210 FEET AND OVER + $
4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND
OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350
FEET AND OVER + $ 9.00; 400 FEET AND OVER +
$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 3/17
KMikolazyk Text Box (R-1)
KMikolazyk
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.) ...$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL
PERSONS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 4/17
KMikolazyk Text Box (R-1)
KMikolazyk
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00; 180 FEET AND OVER + $
3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND
OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300
FEET AND OVER + $ 8.00; 350 FEET AND OVER + $
9.00; 400 FEET AND OVER + $10.00); (PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE
WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.).....$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180
FEET AND OVER + $ 3.00; 210 FEET AND OVER + $
4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND
OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350
FEET AND OVER + $ 9.00; 400 FEET AND OVER +
$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 48.92 29.95
ENGI0057-003 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT.
AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00;
210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $
5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND
OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400
FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 5/17
KMikolazyk Text Box (R-1)
KMikolazyk
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 50.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2: DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
FRONT END LOADER (3 YDS. AND OVER), VIBRATORY
HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING
JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND
OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240
FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $
7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND
OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS
DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK
IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)
............................$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.)........................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.)........................................$ 44.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 6/17
KMikolazyk Text Box (R-1)
KMikolazyk
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.)........................................$ 41.50 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 47.65 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7: WELL POINT INSTALLATION CREW. (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 44.54 29.95
ENGI0057-005 12/01/2025
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 7/17
KMikolazyk Text Box (R-1)
KMikolazyk
Rates Fringes
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1:
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 46.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2:
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3:
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4:
UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5:
SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS
IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID
FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 8/17
KMikolazyk Text Box (R-1)
KMikolazyk
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6:
OILERS ON CRANES AND DECKHANDS. (ANY EMPLOYEE WHO
WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS
DAY.)...............................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7:
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES.
(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8:
GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS,
LIGHT PLANTS, WELDING MACHINES, PUMPS AND
COMPRESSORS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 38.70 29.95
IRON0037-001 09/16/2025
Rates Fringes
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
Rates Fringes LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems............$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator.........$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors.........................$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster.............................................$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 5: Toxic
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 9/17
KMikolazyk Text Box (R-1)
KMikolazyk
Waste Remover.......................................$ 39.00 26.90
LABO0271-002 11/27/2022
Rates Fringes
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 1:Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner:
motor person & all others in compressed air ........$ 55.40 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 2: Change house attendant, powder watchperson, top person on iron ............$ 52.93 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone...............................$ 42.45 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator....................................$ 46.00 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 3: Hazardous waste work within the ""HOT"" zone.$ 42.45 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1:
Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries........$ 33.05 24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2:
Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder;
Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer ...........$ 35.75 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3:
Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster...........$ 36.50 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4:
Flagger & signaler..................................$ 29.00 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5:
Toxic waste remover ................................$ 33.05 24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR
CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM
MAN.................................................$ 41.50 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR
CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN
& LABORER...........................................$ 35.60 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST
BORING: DRILLER.....................................$ 41.95 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 10/17
KMikolazyk Text Box (R-1)
KMikolazyk
BORING: LABORER.....................................$ 41.95 24.15
PAIN0011-005 06/01/2025
Rates Fringes
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (TAPER).....................................$ 38.82 25.80
PAINTER (WALL COVERER)..............................$ 38.57 25.80
PAIN0011-006 06/01/2024
Rates Fringes
GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL.
PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)..........$ 41.63 26.15
PAIN0011-011 06/01/2024
Rates Fringes
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
Rates Fringes
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING
SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR
MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE:
$.30 PER HOUR ADDITIONAL.)..........................$ 44.75 29.10
PLAS0040-002 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 40.45 25.30
PLAS0040-003 01/01/2025
Rates Fringes
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
Rates Fringes
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
Rates Fringes
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
Rates Fringes
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 11/17
KMikolazyk Text Box (R-1)
KMikolazyk
Rates Fringes
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
Rates Fringes
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS
(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 31.86 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.01 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.06 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 12/17
KMikolazyk Text Box (R-1)
KMikolazyk
4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.11 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL
FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.21 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO
BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS
DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE
EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE
CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE
WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT
LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING
THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S
PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID
VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID
VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL
BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR
EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.61 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING
2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 13/17
KMikolazyk Text Box (R-1)
KMikolazyk
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.)
.................................................$ 32.81 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35
TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.31 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR
OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.56 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID:
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
8/5/26, 1:49 PM SAM.gov https://sam.gov/wage-determination/RI20260001/4 14/17
KMikolazyk Text Box (R-1)
KMikolazyk
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .