2026-06-15_Bid_Solid_Waste_Truck_Wash_Design_Drawings_SS.pdf
PDF 48 MB Posted
- Attached to
- Solid Waste Truck Wash Replacement (Rebid)
- Solicitation number
- 23-0021-SW rebid
- Issued by
- Pinellas County, Florida
About this file
This document comprises bid design drawings and specifications for Pinellas County, Florida's Solid Waste Truck Wash Replacement project, a rebid solicitation for the replacement of an existing manual truck wash pad with an automatic truck wash system. The project scope includes demolition of the current manual wash pad and associated equipment, installation of a new automatic truck wash system, and integration of electrical, potable water, and sanitary sewer infrastructure improvements. The contractor must provide two fixed project signs as described in the contract documents, with the final quantity determined at project initiation based on the contractor's submitted work schedule; any additional signs required due to scheduling adjustments must be provided at no additional cost to the county. The contract period allows 270 consecutive calendar days to substantial completion and 300 consecutive calendar days to final completion. Design drawings and detailed specifications were posted on June 30, 2026, with bids due by August 12, 2026.
Bidders must submit copies of a current Contractor License or Registration with the State of Florida and Pinellas County, if applicable, as part of their bid response. The solicitation documents do not specify an estimated contract value, identify an incumbent contractor, detail evaluation criteria, or provide pre-bid meeting information. As this is a rebid solicitation, the project represents a second round of competitive bidding following the initial solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
H
E R
C U
L
S
A
V E
C S
X R
A I L R
O A
D
S U
N S
H I
D
R
L O G A N S T .
C A L U M E T S T .
S U N N Y D A L E B L V D .
C A L U M E T S T .
G E N T R Y S T .
R A N G E R D .
W E A V E R P A R K D R .
P A L M E T T O S T .
B
L
C H
D
City Project No. 23-0021-SW City Plan Set No. 2023019
CITY OFFICIALS
BRUCE RECTOR Mayor RYAN COTTON Councilmember MIKE MANNINO Councilmember DAVID ALLBRITTON Councilmember LINA TEIXEIRA Councilmember JENNIFER POIRRIER City Manager
TARA L. KIVETT, P.E.
City EnJineer
Approved For Construction
Date Approved
CITY ENGINEER TARA L. KIVETT, P.E. #
SOLID WASTE TRUCK
WASH REPLACEMENT
Project Location
COACHMAN
O
LD
BE
LC
HE
R
RD
ER
ED
ISE
PR
CO
U
S.R. 580
BA
Y
AV
EAV
E
AV
E
GREENBRIAR
S R 584
S R
BE
LC
HE
R
RD
AL
T.
U .S
. 1
STVIRGINIA
ST
MAIN
PA
TR
IC
IA
N
EW
Y O
RK
M
IL
W
AU
KE
E
RO
AD
S.
R.
SO
U
LE
RDPOINTSUNSET MAIN ST
CURLEW RD
DR
NORTHSIDE
LA
N
DM
AR
K
DR
U .S
. 1
S.R. 580EN
TER
NTRYSIDE
RD
UNION ST
RD
BL
VD
E
RD
ENTERPRISE
M cM
U
LL
EN
BO
O
TH
RD
S R 590
SH
OR
E
BL
VD
RD
BE
LC
HE
R
RD
N. E.
HA
M
PT
O
N
CO
AC
HM
AN
STDREW
BRIDGE
BAYSIDE
BE
LC
HE
R
RD
S.R. 60
HARN
BLVD
U .S
. 1
M
IS
SO
U
RI
AV
E
M
YR
TL
E
GR
EE
N W
O O
D
AV
E
LA
BE
TT
Y
AV
E
HI
GH
LA
N
D
AV
E
LAKEVIEW RD
BELLEAIR RD
NURSERY RD
AV
E
S.R.CHESTNUT
HA
RR
IS
O
N
FT
ST
STCOURT
BLVDBAYTO
STCLEVELAND
GULFSTCOURT
GULF TO
SA
TU
RN
AV
E
RD
LA
KE
AV
E/
DR
KE
EN
E
DRUID RD
DREW ST
AV
E
HE
RC
U
LE
SSTPALMETTOAL
T
US
SUNSET POINT RD
HI
GH
LA
N
D
AV
E
KI
N
G' S
HI
GH
W
AY
UNION ST
VIRGINIA ST
KE
EN
E
RD
GE
W
AT
DR
DO
U
GL
AS
LA
BE
TT
Y
AV
E
GU
LF
BL
VD
S GULFVIEW
BLVD
BAYMONT
ACACIA
ISLAND
W
AY
S. R. 60
M
AN
DA
LA
Y
AV
E
BAY
4921 Memorial Highway One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com License #2610
BID DOCUMENTS
Ju ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -G
N
CV
.d w g
Know what'sbelow.
before you dig.Call
R
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-GNCV.dwg jeremy.brown Text Box For
BID DOCUMENTS
Ju ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -G
N
AL
.d w g
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
100 S. MYRTLE AVE.
CLEARWATER, FL 3375606/15/260 BID DOCUMENTS
CFK
G0.00A
C-GNAL.DWG
06/15/2026
MSC
2024-0578-00 CSA CFK
CHRISTOPHER F. KUZLER, P.E. 45534
4921 Memorial Highway One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com License #2610
06/15/26
ARDURRA
4921 MEMORIAL HIGHWAY, SUITE 300,
TAMPA, FL 33634
(813) 880-8881
THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER
OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND
SEALED UNDER RULE 61G15-23.004, FAC.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
GENERAL
G0.00 COVER
G0.01 ABBREVIATIONS, LEGEND AND INDEX SHEET
CIVIL
C1.00 EXISTING PROJECT SITE & DEMOLITION PLAN
C1.01 EXISTING PROJECT SITE AND DEMOLITION PLAN
C1.02 EXISTING MANUAL TRUCK WASH AREA DEMOLITION PLAN
C2.00 PROPOSED SITE PLAN
C2.00A PROPOSED SITE PLAN ADDITIVE ALTERNATE
C2.01 PROJECT SITE COORDINATE CONTROL PLAN
C2.02 TRAFFIC FLOW PLAN
C2.02A TRAFFIC FLOW PATTERN ADDITIVE ALTERNATE
C2.03 SIGNING AND PAVEMENT MARKING
C3.00 PROJECT SITE UTILITY PLAN
C3.00A PROJECT SITE UTILITY PLAN ADDITIVE ALTERNATE
C4.01 PROJECT AREA PAVING,GRADING AND DRAINAGE
C4.01A PROJECT AREA PAVING,GRADING AND DRAINAGE ADDITIVE ALTERNATE
C8.00 MISCELLANEOUS DETAILS (1)
C8.01 MISCELLANEOUS DETAILS (2)
C8.02 MISCELLANEOUS DETAILS (3)
C8.03 MISCELLANEOUS DETAILS (4)
C8.04 MISCELLANEOUS DETAILS (5)
C8.05 MISCELLANEOUS DETAILS (6)
MECHANICAL
D1.01 MANUAL TRUCK WASH AREA SITE PLAN
D1.02 PROCESS PIPING PLAN
D1.03 MANUAL TRUCK WASH AREA SECTION (1)
D1.04 MANUAL TRUCK WASH AREA SECTIONS (2)
D1.05 MANUAL TRUCK WASH AREA SECTIONS (3)
D1.06 MANUAL TRUCK WASH STRIPING AND BARRIER PLAN
D1.07 MANUAL TRUCK WASH BLDG FLOOR PLAN
D1.08 MANUAL TRUCK WASH BLDG SECTIONS
D2.01 AUTOMATIC TRUCK WASH BLDG FLOOR PLAN ADDITIVE ALTERNATE
D2.02 AUTOMATIC TRUCK WASH SECTION ADDITIVE ALTERNATE
D3.01 MECHANICAL DETAILS
TRAFFIC CONTROL
TC1.01 TRAFFIC CONTROL PLAN (1)
TC1.02 TRAFFIC CONTROL PLAN (2)
06/15/260 BID DOCUMENTS
STRUCTURAL
S0.00 GENERAL STRUCTURAL NOTES
S0.01 GENERAL STRUCTURAL NOTES
S1.01 MANUAL TRUCK WASH FOUNDATION SLAB PLAN
S1.02 MANUAL TRUCK WASH CATWALK FRAMING PLAN
S1.03 AUTOMATIC TRUCK WASH FOUNDATION SLAB PLAN
S2.01 CATWALK SECTIONS
S3.01 CONCRETE SECTIONS AND DETAILS
S4.01 CATWALK SECTIONS AND DETAILS
ELECTRICAL
E0.01 ELECTRICAL LEGEND
E0.02 ELECTRICAL NOTES
E0.03 PROPOSED ONE-LINE DIAGRAM
E0.04 ELECTRICAL OVERALL SITE PLAN
E0.04A ELECTRICAL OVERALL SITE PLAN ADDITIVE ALTERNATE
E1.01 ENLARGED ELECTRICAL VIEW MANUAL TRUCK WASH ROOM
E1.02 MANUAL TRUCK WASH ROOM DEMO PHOTOS
E1.03 ENLARGED ELECTRICAL VIEW MANUAL TRUCK WASH BAY
E2.01 ENLARGED ELECTRICAL POWER VIEW AUTOMATIC TRUCK WASH
E2.02 ENLARGED ELECTRICAL VIEW CONTROLS AUTOMATIC TRUCK WASH
E3.01 PROPOSED ELECTRICAL SCHEDULES I
E3.02 PROPOSED ELECTRICAL SCHEDULES II
E8.01 ELECTRICAL GROUNDING DETAILS I
E8.02 ELECTRICAL GROUNDING DETAILS II
E8.03 ELECTRICAL STANDARD DETAILS I
E8.04 ELECTRICAL STANDARD DETAILS II
HVAC
H0.00 HVAC NOTES, LEGENDS
H1.00 HVAC PLANS
BSA LIFESTRUCTURES, INC.
2609 W. DE LEON STREET
TAMPA, FL 33609
(813) 874-9494
ENGINEERING LICENSE: TBD
ARDURRA
4921 MEMORIAL HIGHWAY, SUITE 300,
TAMPA, FL 33634
(813) 880-8881
THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER
OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND
SEALED UNDER RULE 61G15-23.004, FAC.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
ARDURRA
4921 MEMORIAL HIGHWAY, SUITE 300,
TAMPA, FL 33634
(813) 880-8881
THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER
OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND
SEALED UNDER RULE 61G15-23.004, FAC.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER
OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND
SEALED UNDER RULE 61G15-23.004, FAC.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
BSA LIFESTRUCTURES, INC.
2609 W. DE LEON STREET
TAMPA, FL 33609
(813) 874-9494
ENGINEERING LICENSE: TBD
THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER
OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND
SEALED UNDER RULE 61G15-23.004, FAC.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
PLUMBING
P0.01 LEGENDS AND GENERAL NOTES
P1.00 PLUMBING DEMOLITION AND NEW CONSTRUCTION PLANS
P2.00 PLUMBING DETAILS
P2.01 PLUMBING DETAILS
P2.02 PLUMBING DETAILS
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-GNAL.dwg
G0.02 GENERAL NOTES
G0.03 MANUAL TRUCK WASH PROCESS FLOW DIAGRAM
G0.04 STORMWATER POLLUTION PREVENTION PLAN
G0.05 WORK ZONE AND ACCESSIBILITY PLAN
ADDITIVE ALTERNATE
ADDITIVE ALTERNATE
ABBREVIATIONS
AC ASBESTOS CEMENT
AE APPROVED EQUAL
APP APPARENT
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
BE BURIED ELECTRIC
BFD BACK FLOW PREVENTER DEVICE
BLDG BUILDING
BLVD BOULEVARD
BM BENCH MARK
BOC BACK OF CURB
BT BURIED TELEPHONE
CB CATCH BASIN
CI CAST IRON
CL OR C L CENTER LINE
CM CONCRETE MONUMENT
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONC CONCRETE
CONST CONSTRUCTION
CORR CORRUGATED
CPLG COUPLING
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DWG DRAWING
E EAST OR EASTING
EA EACH
ELEC ELECTRIC OR ELECTRICAL
EL OR ELEV ELEVATION
EOP EDGE OF PAVEMENT
EX OR EXIST EXISTING
EXP EXPANSION
FDOT FLORIDA DEPT. OF TRANSPORTATION
FHA FIRE HYDRANT ASSEMBLY
FIR FOUND IRON ROD
FIRC FOUND IRON ROD WITH CAP
FM FORCE MAIN
FND, FN&D FOUND NAIL & DISK
FOC FIBER OPTIC CABLE
FT FEET
GRD GRADE
GS GROUND SHOT
GSP GALVANIZED STEEL PIPE
GV GATE VALVE
HDD HORIZONTAL DIRECTIONAL DRILL
HDPE HIGH DENSITY POLYETHYLENE
HDWL HEADWALL
HORIZ HORIZONTAL
ID INSIDE DIAMETER
IN INCH
INV OR IE INVERT (ELEVATION)
IR IRON ROD
IWSC IRRIGATION SERVICE CONNECTION
IV IRRIGATION VALVE
MAX MAXIMUM
MJ MECHANICAL JOINT
MIN MINIMUM
MOD MODIFIED
N NORTH OR NORTHING
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO OR # NUMBER
O/AE OR APPROVED EQUAL
O/S OFFSET
OD OUTSIDE DIAMETER
O R BOOK OFFICIAL RECORD BOOK
PVMT PAVEMENT
PL PLATE OR PLACE OR PROPERTY LINE
PNT OR PT POINT
PC POINT OF CURVATURE
PI POINT OF INTERSECTION
PSM PROFESSIONAL SURVEYOR & MAPPER
PVI POINT OF VERTICAL INTERSECTION
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PP POWER POLE
PROP PROPOSED
R RADIUS
RWM RAW WATER MAIN
RCW RECLAIMED WATER
RD ROAD
RP RADIUS POINT
RED REDUCER
RCP REINFORCED CONCRETE PIPE
REQD REQUIRED
RT RIGHT
R/W RIGHT-OF-WAY
RWGV RESILIENT WEDGE GATE VALVE
SAN SANITARY (SEWER)
SCH SCHEDULE
SCP SURVEY CONTROL POINT
SHT SHEET
SIR SET IRON ROD
SIRC SET IRON ROD AND CAP
SMH SANITARY MANHOLE
S/W SIDEWALK
SPECS SPECIFICATIONS
SS STAINLESS STEEL OR SHORT SIDE OR SAN SEWER
ST STREET
STD STANDARD
STA STATION
STM STORM
TEL TELEPHONE
TEMP TEMPORARY
TOC TOP OF CONCRETE
TRV SURVEY TRAVERSE POINT
TS TRAFFIC SIGN
TS&V TAPPING SLEEVE AND VALVE
TYP TYPICAL
UD UNDERDRAIN
UG UNDER GROUND
WS WATER SERVICE
WSC WATER SERVICE CONNECTION
WM WATER MAIN
DETAIL A
M3
SECTION 3
M3
A M12
M11
VAR
A
T
F.I.R.
F.I.P.
S.I.R.
F.I.R.C.
F.N.&D.
LEGEND
WM
FM FM
SAN
BT
FOC
BE BE
CTV
GAS
STM
OHW
= TELEPHONE UTILITY BOX
= EXISTING FIRE HYDRANT
= UTILITY POLE
= LIGHT POLE
= UTILITY & LIGHT POLE
= GUY POLE
= GUY WIRE
= ELECTRIC TRANSFORMER
= UNDERGROUND GAS LINE MARKER
= TRAFFIC SIGNAL UTILITY BOX
= TRAFFIC SIGNAL POLE
= PROPOSED ASPHALT PAVEMENT
= EX. WATER SERVICE CONNECTION
= IRRIGATION SERVICE CONNECTION
= GRATE INLET
= MAILBOX
= STORM SEWER CLEAN OUT, PIPE & MANHOLE
= FOUND IRON ROD (SIZE AND IDENTIFICATION IF SHOWN)
= FOUND IRON ROD WITH CAP (SIZE AND IDENTIFICATION IF SHOWN)
= FOUND NAIL & DISK (TYPE AND IDENTIFICATION IF SHOWN)
= FOUND IRON PIPE (SIZE AND IDENTIFICATION IF SHOWN)
= SET 1/2" IRON ROD & CAP L.B.#2610
= RIGHT OF WAY LINE
= PROPERTY LINE
= JURISDICTIONAL LINE
= EDGE OF PAVEMENT
= CHAIN-LINK FENCE
= EXISTING WATER MAIN
= EXISTING FORCE MAIN
= EXISTING SANITARY SEWER
= EXISTING STORM SEWER
= EXISTING UNDERDRAIN
= EXISTING BURIED TELEPHONE
= EXISTING BURIED FIBER OPTIC CABLE
= EXISTING BURIED ELECTRIC
= EXISTING BURIED CABLE TV
= EXISTING GAS MAIN
= EXISTING OVERHEAD UTILITY LINE
= PROPOSED WATER MAIN
= PROPOSED WATER SERVCE
= PROPOSED SANITARY SEWER
= PROPOSED SANITARY FORCEMAIN
= SILT FENCE
= TREE BARRICADE
= PROPOSED FHA
= CHLORINATION POINT
= SAMPLE POINT
= BACKFLOW PREVENTER
= TEMPORARY BLOW OFF
= PROPOSED WATER METER BOX
= EXISTING WATER METER BOX
= PROPOSED SANITARY MANHOLE
= EXISTING SANITARY MANHOLE
= CONCRETE / DRIVEWAY / SIDEWALK TO BE REMOVED & REPLACED
= EXISTING BOLLARDS
= WATER SERVICE CONNECTION
= PROPOSED SS CLEANOUT
= EXISTING SS CLEANOUT
= BORE
= MONITORING WELL
UD
WSC
S
BORE X-#
EL=X.X'
BFP
TARGET INDICATORS
SECTION TITLE TARGET
DETAIL TITLE TARGET
SECTION & DETAIL TARGET
SECTION DESIGNATION
SHEET ON WHICH
SECTION IS CUT
DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS INDICATED
SHOWN ON
VARIOUS SHEETS
SECTION DESIGNATION
SHEET ON WHICH
SECTION IS DRAWN DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
W
BID DOCUMENTS
Ju ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -G
N
AL
.d w g
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
CLEARWATER, FL 3375606/15/260 BID DOCUMENTS
G0.01
06/15/2026
MSC
Tampa, Florida 33634 Phone: (813) 880-8881
Sheet List Table Sheet Number Sheet Title
GENERAL
G0.00 COVER
G0.00A SIGNATURE SHEET
G0.01 ABBREVIATIONS, LEGEND AND INDEX SHEET
G0.02 GENERAL NOTES
G0.03 MANUAL TRUCK WASH PROCESS FLOW DIAGRAM
G0.04 STORMWATER POLLUTION PREVENTION PLAN
G0.05 WORK ZONE AND ACCESSIBILITY PLAN
CIVIL
C1.00 EXISTING PROJECT SITE & DEMOLITION PLAN
C1.01 EXISTING PROJECT SITE AND DEMOLITION PLAN
C1.02 EXISTING MANUAL TRUCK WASH AREA DEMOLITION PLAN
C2.00 PROPOSED SITE PLAN
C2.00A PROPOSED SITE PLAN ADDITIVE ALTERNATE
C2.01 PROJECT SITE COORDINATE CONTROL PLAN
C2.02 TRAFFIC FLOW PLAN
C2.02A TRAFFIC FLOW PATTERN ADDITIVE ALTERNATE
C2.03 SIGNING AND PAVEMENT MARKING
C3.00 PROJECT SITE UTILITY PLAN
C3.00A PROJECT SITE UTILITY PLAN ADDITIVE ALTERNATE
C4.01 PROJECT AREA PAVING,GRADING AND DRAINAGE
C4.01A PROJECT AREA PAVING,GRADING AND DRAINAGE ADDITIVE ALTERNATE
C8.00 MISCELLANEOUS DETAILS (1)
C8.01 MISCELLANEOUS DETAILS (2)
C8.02 MISCELLANEOUS DETAILS (3)
C8.03 MISCELLANEOUS DETAILS (4)
C8.04 MISCELLANEOUS DETAILS (5)
C8.05 MISCELLANEOUS DETAILS (6)
STRUCTURAL
S0.00 GENERAL STRUCTURAL NOTES
S0.01 GENERAL STRUCTURAL NOTES
S1.01 MANUAL TRUCK WASH FOUNDATION SLAB PLAN
S1.02 MANUAL TRUCK WASH CATWALK FRAMING PLAN
S1.03 AUTOMATIC TRUCK WASH FOUNDATION SLAB PLAN
S2.01 CATWALK SECTIONS
S3.01 CONCRETE SECTIONS AND DETAILS
S4.01 CATWALK SECTIONS AND DETAILS
MECHANICAL
D1.01 MANUAL TRUCK WASH AREA SITE PLAN
D1.02 PROCESS PIPING PLAN
D1.03 MANUAL TRUCK WASH AREA SECTION (1)
D1.04 MANUAL TRUCK WASH AREA SECTIONS (2)
D1.05 MANUAL TRUCK WASH AREA SECTIONS (3)
D1.06 MANUAL TRUCK WASH STRIPING AND BARRIER PLAN
D1.07 MANUAL TRUCK WASH BLDG FLOOR PLAN
D1.08 MANUAL TRUCK WASH BLDG SECTIONS
D2.01 AUTOMATIC TRUCK WASH BLDG FLOOR PLAN ADDITIVE ALTERNATE
D2.02 AUTOMATIC TRUCK WASH SECTION ADDITIVE ALTERNATE
D3.01 MECHANICAL DETAILS
HVAC
H0.00 HVAC NOTES, LEGENDS
H1.00 HVAC PLANS
PLUMBING
P0.01 LEGENDS AND GENERAL NOTES
P1.00 PLUMBING DEMOLITION AND NEW CONSTRUCTION PLANS
P2.00 PLUMBING DETAILS
P2.01 PLUMBING DETAILS
P2.02 PLUMBING DETAILS
ELECTRICAL
E0.01 ELECTRICAL LEGEND
E0.02 ELECTRICAL NOTES
E0.03 PROPOSED ONE-LINE DIAGRAM
E0.04 ELECTRICAL OVERALL SITE PLAN
E0.04A ELECTRICAL OVERALL SITE PLAN ADDITIVE ALTERNATE
E1.01 ENLARGED ELECTRICAL VIEW MANUAL TRUCK WASH ROOM
E1.02 MANUAL TRUCK WASH ROOM DEMO PHOTOS
E1.03 ENLARGED ELECTRICAL VIEW MANUAL TRUCK WASH BAY
E2.01 ENLARGED ELECTRICAL POWER VIEW AUTOMATIC TRUCK WASH
E2.02 ENLARGED ELECTRICAL VIEW CONTROLS AUTOMATIC TRUCK WASH
E3.01 PROPOSED ELECTRICAL SCHEDULES I
E3.02 PROPOSED ELECTRICAL SCHEDULES II
E8.01 ELECTRICAL GROUNDING DETAILS I
E8.02 ELECTRICAL GROUNDING DETAILS II
E8.03 ELECTRICAL STANDARD DETAILS I
E8.04 ELECTRICAL STANDARD DETAILS II
TRAFFIC CONTROL
TC1.01 TRAFFIC CONTROL PLAN (1)
TC1.02 TRAFFIC CONTROL PLAN (2)
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-GNAL.dwg
ADDITIVE ALTERNATE
ADDITIVE ALTERNATE
MAN
GENERAL UTILITY NOTES
1. THE INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR IN ASSESSING THE NATURE AND EXTENT OF CONDITIONS WHICH WILL BE ENCOUNTERED DURING THE COURSE OF THE WORK. THE CONTRACTOR IS DIRECTED, PRIOR TO CONSTRUCTION TO CONDUCT WHATEVER INVESTIGATIONS THEY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS
REGARDING THE ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED.
2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY TO REPORT ANY CONFLICTS BETWEEN WHAT IS SHOWN HEREIN
AND ACTUAL CONDITIONS DISCOVERED DURING CONSTRUCTION.
3. ALL DISTURBED AREAS SHALL BE SODDED AS INDICATED IN THE DRAWINGS, UNLESS OTHERWISE NOTED, AFTER REGRADING.
4. FINISHED GRADE FOR GROUND ELEVATIONS ON DRAWINGS REFER TO GRADE AFTER SODDING AND WEAR SURFACE
CONSTRUCTION.
5. ALL SURVEY DRAWINGS WERE FURNISHED BY THE CITY OF CLEARWATER. SCALES ARE FOR REFERENCE PURPOSES ONLY.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO ORDERING ANY MATERIALS OR EQUIPMENT.
6. THE CONVERSION FROM NAVD 1988 TO NGVD 1929 (NATIONAL GEODETIC VERTICAL DATUM) IS: NAVD 1988 = (NGVD 1929) -
0.90 FT.
7. CITY OF CLEARWATER BENCHMARK "H-11A", EAST SIDE OF ROAD AT 1603 N. HERCULES AVENUE, ON STORM CURB INLET.
LOCATED AT NORTHING:1326517.75, EASTING: 412649.87, ELEVATION: 64.223
8. LAST DATE OF FIELD SURVEY: 2/21/14
CITY OF CLEARWATER STANDARD NOTES
GENERAL NOTES
1. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS GOVERNMENTAL AGENCIES
HAVING JURISDICTION OVER THE WORK.
2. ALL WORKMANSHIP AND MATERIALS USED IN THE CONSTRUCTION OF THIS PROJECT SHALL CONFORM TO THE LATEST CITY OF CLEARWATER STANDARDS, CONTRACT DOCUMENTS AND SPECIFICATIONS UNLESS OTHERWISE NOTED.
3. SPECIFIC REQUIREMENTS OF THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) “DESIGN STANDARDS” AND “STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION”, MOST CURRENT EDITIONS, ARE INCORPORATED INTO THE CONTRACT
DOCUMENTS BY REFERENCE.
4. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION, SEE SPECIFICATION 01030.
5. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF THE PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THE CONTRACTOR SHALL VERIFY THE LOCATION, ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES AFFECTING THE WORK PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW THE SITE TO DETERMINE EXISTING CONDITIONS. ANYTHING NOT SHOWN ON THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE CITY'S ENGINEERING REPRESENTATIVE AND SHALL NOT
CONSTITUTE ADDITIONAL SCOPE OF WORK APPROVED BY THE ENGINEER.
7. THE CONTRACTOR SHALL CONTACT THE CITY'S ENGINEERING REPRESENTATIVE IMMEDIATELY CONCERNING ANY CONFLICTS
ARISING DURING CONSTRUCTION.
8. ALL CONSTRUCTION ACTIVITIES MUST CONFORM TO THE LOCAL NOISE ORDINANCE.
9. HOURS OF WORK SHALL BE IN ACCORDANCE WITH THE LOCAL GOVERNMENTAL AGENCY.
10. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. SPECIAL PRECAUTIONS MAY BE REQUIRED IN THE VICINITY OF POWER LINES AND
OTHER UTILITIES.
11. THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN ALL NECESSARY TRAFFIC CONTROL AND SAFETY DEVICES IN ACCORDANCE WITH THE U.S. DEPARTMENT OF TRANSPORTATION, “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” AND THE
LATEST FLORIDA DEPARTMENT OF TRANSPORTATION “DESIGN STANDARDS”.
12. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN EFFECTIVE BARRICADES, DANGER SIGNALS, SIGNS AND PEDESTRIAN DETOURS IN ALL AREAS WHERE REQUIRED FOR THE PROTECTION OF THE WORK AND THE SAFETY OF THE PUBLIC.
13. ANY NATIONAL GEODETIC SURVEY (NGS) MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF IN DANGER OF DAMAGE, CONTRACTOR SHALL NOTIFY THE CITY'S FIELD REPRESENTATIVE IMMEDIATELY AND CONTACT THE
NATIONAL GEODETIC SURVEY INFORMATION CENTER.
14. UNLESS NOTED ON THE PLANS, FINAL GRADE IS TO GENERALLY BE THE SAME AS EXISTING GRADE. RESTORE UNIFORMLY AND
FOR PROPER YARD DRAINAGE GRADE TOWARD THE STORMWATER POND.
15. ALL NEW UTILITIES SHALL BE INSTALLED WITH THE MINIMUM THIRTY SIX (36) INCHES OF COVER.
16. WHERE UTILITIES CROSS THE LOWEST PIPE SHALL BE INSTALLED FIRST.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING OF ALL NEWLY CONSTRUCTED UTILITIES IN ACCORDANCE WITH CURRENT STANDARDS OF LOCAL JURISDICTION. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION AND THE OWNER OR AN AUTHORIZED REPRESENTATIVE AT LEAST FORTY EIGHT (48) HOURS IN ADVANCE OF PERFORMING TESTS.
18. THE CONTRACTOR SHALL PROVIDE ALL SHEETING, SHORING AND BRACING REQUIRED TO PROTECT ADJACENT STRUCTURES OR TO MINIMIZE TRENCH WIDTH. WHERE A SEPARATE PAY ITEM IS NOT PROVIDED, THE COST OF ALL SHEETING AND BRACING REQUIRED SHALL BE INCLUDED IN THE CONTRACT PRICE FOR THE ITEM OF WORK FOR WHICH SHEETING, SHORING AND BRACING IS ANTICIPATED TO BE REQUIRED IN ACCORDANCE WITH LOCAL, STATE, OR FEDERAL REGULATIONS FOR
CONSTRUCTION.
19. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI (28-DAY STRENGTH), UNLESS OTHERWISE
NOTED ON DRAWINGS OR AS SPECIFIED.
20. NO SURFACING MATERIAL IS TO BE APPLIED TO ANY MANHOLE COVERS, FRAMES, VALVE BOXES, GAS DROPS, ETC. ALL EXISTING AND PROPOSED UTILITY AND STORM SEWER STRUCTURES WHOSE TOPS WILL BE EXPOSED WITHIN ANY PAVED AREA SHALL BE ADJUSTED SO THAT THE TOP SURFACE OF COVERS OR FRAMES SHALL BE FLUSH WITH THE PAVEMENT SURFACE.
21. MATERIALS INTERFERING WITH CONSTRUCTION SHALL BE DISPOSED OF AS DIRECTED BY THE CITY'S ENGINEERING
REPRESENTATIVE, UNLESS OTHERWISE NOTED ON PLANS.
22. ALL EXCESS SOIL RESULTING FROM CONSTRUCTION ACTIVITIES THAT IS NOT CLAIMED BY THE OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF BY THE CONTRACTOR. SEE SPECIFICATION 01030 REGARDING
CONTAMINATED SOIL.
23. ALL DISTURBED LANDSCAPED AND/OR GRASSED AREAS SHALL BE RESTORED UNIFORMLY AND BE GENERALLY AT THE SAME
ELEVATION AS EXISTING GRADES.
24. ALL DISTURBED AREAS SHALL BE REPLACED WITHIN FIFTEEN (15) DAYS TO A CONDITION EQUAL TO OR BETTER THAN EXISTING
CONDITIONS.
25. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE SET OF MARKED-UP DRAWINGS (AS-BUILTS) AT THE CONSTRUCTION SITE.
26. A CCTV INSPECTION OF THE NEW SEWER SYSTEM IN DIGITAL FORMAT UTILIZING THE INDUSTRY STANDARD PIPELINE ASSESSMENT AND CERTIFICATION PROGRAM (PACP) CODING SYSTEM SHALL BE PROVIDED TO THE CITY. THE VIDEO SHALL BE TAKEN PRIOR TO PLACING THE NEW SEWER SYSTEM INTO SERVICE. DATA WILL BE COLLECTED UTILIZING CUES GRANITE
SOFTWARE.
27. THE BOTTOM TRENCH WIDTH IN AN UNSUPPORTED TRENCH SHALL BE LIMITED TO THE MINIMUM PRACTICABLE WIDTH ALLOWING WORKING SPACE TO PLACE AND COMPACT THE HUNCHING MATERIAL. THE USE OF TRENCH BOXES AND MOVABLE SHEETING SHALL BE PERFORMED IN SUCH A MANNER THAT REMOVAL, BACKFILL AND COMPACTION WILL NOT DISTURB COMPACTED HAUNCHING MATERIAL OR PIPE ALIGNMENT. DEWATERING OF THE TRENCH BOTTOM SHALL BE ACCOMPLISHED USING ADEQUATE MEANS TO ALLOW PREPARATION OF BEDDING, PLACEMENT OF THE HAUNCHING MATERIAL AND PIPE IN THE TRENCH WITHOUT STANDING WATER. DEWATERING SHALL CONTINUE UNTIL SUFFICIENT BACKFILL IS PLACED ABOVE THE PIPE
TO PREVENT FLOTATION OR MISALIGNMENT.
28. THE CONTRACTOR SHALL DISPOSE OF ALL UNSUITABLE MATERIALS, CONSTRUCTION DEBRIS, AND OTHER WASTE MATERIALS OFFSITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS AT THE CONTRACTOR'S EXPENSE. ALL
BACKFILL SHALL BE FREE OF UNSUITABLE MATERIALS.
29. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A HURRICANE PREPARATION PLAN TO THE CITY'S ENGINEERING REPRESENTATIVE FOR REVIEW AND APPROVAL PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.
30. THE CONTRACTOR SHALL PROTECT PRIVATE PROPERTY.
SEDIMENT & EROSION CONTROL
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTROL AND PREVENT EROSION AND THE TRANSPORTATION OF SEDIMENT
TO SURFACE DRAINS AND OUTFALLS.
2. THE CONTRACTOR SHALL PREPARE AND SUBMIT A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) CRITERIA FOR A NATIONAL POLLUTION DISCHARGE
ELIMINATION SYSTEM (NPDES) ACTIVITIES PERMIT.
3. THE CONTRACTOR MUST OBTAIN A FDEP GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND WATER, IF DEWATERING WITH OFFSITE DISCHARGE WILL BE REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED PRELIMINARY WATER SAMPLES TO SATISFY THE FDEP GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND WATER. SAMPLING SHALL OCCUR
THIRTY (30) DAYS PRIOR TO THE START OF DEWATERING.
4. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND POLLUTION SHALL BE MINIMIZED.
THE SUBMITTED SWPPP SHALL BE COMPLIED WITH. ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS SHALL BE COMPLIED WITH AT ALL TIMES. PLEASE NOTE THAT NO HAY BALES ARE ALLOWED ON CITY OF CLEARWATER PROJECTS.
BID DOCUMENTS
Ju ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -G
N
AL
.d w g
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
G0.02
06/15/2026
MSC
Tampa, Florida 33634 Phone: (813) 880-8881
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-GNAL.dwg
CW
CWCWCW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW
CW
DTW DTW DTW DTW DTW DTW DTW DTW DTW DTW
DT
W
DT
W
DT
W
DT
W
DT
W
DTW DTW DTW
DTW DTW DTW DTW DTW DTW DTW DTW DTW
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DTW DTW
CW CW CW
CW CW
DT
W
DT
W
DT
W
DTW
DTW
CW
CW
DTW
DW
CW CW
DTW DTW DTW DTW DTW DTWDTW
DT
W DTW
DTW DTW DTW DTW DTW DTW
DTW DTW DTW DTW DTW DTW DTW DTW
DTW
DTW
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DT
W
DTW DTW DTW DTW DTW DTW
CW CW CW CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW CW CW CW CW CW CW CW
CW
CW
CW
CW
CW
CW
DTW DTW DTW DTW DTW DTW
DTW DTW DTW DTW DTW DTW DTW DTW DTW
DW DW
DW
DW
DW
DW DW DW DW DW DW DW DW DW DW DW DW
DTW DTW DTW
CW CW CW CW
W20
W20
DETERGENT
DRUM
W20
FOAMER
FOAMER
DEODORANT
DRUM
FOAMING
BRUSH
DETERGENT
DRUM
HOT
WATER
HEATER
COLD
WATER
DTW DTW
DILUTED DETERGENT
HOT WATER
COLD WATER
DILUTED DEODORANT
DILUTED DETERGENT
FOAMING BRUSH
HOSE & REEL
DETERGENT
WAND
DETERGENT WAND HOSE & REEL
FOAMING BRUSH
FOAMING BRUSH
HOSE & REELDETERGENT WAND
DETERGENT WAND
HOSE & REEL
FOAMING BRUSH
MANUAL TRUCK WASH BAY
MANUAL TRUCK WASH BAY
CATWALK
HOSE & REEL
FOAMING BRUSH
DETERGENT
WAND
DTW DTW DTW DTW DTW
DTW
DTW
DTW
DTW
DEODORANT
WAND
HOSE & REEL
DETERGENT
WAND
FOAMING BRUSH
DTW DTW DTW DTW
DT
W
DTWDTW
DTW DTW DTW DTW
DT
W
DT
W
DT
W
DTW DTW DTW DTW DTW DTW
DTW
CW CW CW CW CW CW
CW
CW
CW CW CW CW CW CW
CW
CW
CW CW
CW CW
WATER
METER
EX. WASH EQUIPMENT BUILDING
BOOSTER
PUMP SKID
PRESSURE WASHER
PRESSURE WASHER
DILUTED DETERGENT
DILUTED DETERGENT
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
PRESSURE WASHER
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS GAS GAS
GAS GAS
GAS
SUPPLY
CW CW CW
CW CW CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW CW CW CW
BID DOCUMENTS
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
G0.03
One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com
C-PID.DWG
06/15/2026
06/15/26 MSC
ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -P
ID
.d w g
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
100 S. MYRTLE AVE.
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-PID.dwg
SIGNATURE
THE STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT'S (SWFWMD) REQUIREMENTS FOR STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL, AS ESTABLISHED BY THE FLORIDA ADMINISTRATIVE CODE, CHAPTER 40D-4 AND 40D-40. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH SWFWMD'S "BASIS OF REVIEW FOR SURFACE WATER MANAGEMENT PERMIT APPLICATIONS WITHIN THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT." THIS PLAN ALSO REFLECTS THE REQUIREMENTS OF THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR WORK IN BRANCH 6.
AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT BARRIERS, STABILIZED CONSTRUCTION ENTRANCES AND SEDIMENT BASINS WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 21 DAYS WILL BE STABILIZED WITH A TEMPORARY GRASS AND MULCH WITHIN 5 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTED ACTIVITY CEASES PERMANENTLY IN THAT AREA, THAT AREA WILL BE RESTORED TO PRECONSTRUCTION CONDITIONS AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM THE TRAPS AND THE STAKED SILT
BARRIERS WILL BE REMOVED.
DESCRIPTION OF NATURE OF CONSTRUCTION ACTIVITY
REPLACEMENT OF MANUAL TRUCK WASH AND INSTALLATION OF MANUAL TRUCK WASH. INSTALLATION OF APPROXIMATELY 507 LF OF 8-INCH SANITARY
SEWER, 923 LF OF 6-INCH WATER MAIN AND 923 LF OF 4-INCH RECLAIMED WATER MAIN.
SOIL DISTURBING ACTIVITIES INCLUDE:
EROSION CONTROL MEASURES, PIPE TRENCH EXCAVATION AND BACKFILL, PAVEMENT REPLACEMENT AND GRADING, AND PREPARATION FOR FINAL, SODDING, SEED & MULCHING AND HYDRO-SEEDING.
RUNOFF COEFFICIENT: N/A
SITE AREA: 11 AC
SEQUENCE OF MAJOR ACTIVITIES:
1. INSTALL SILT FENCE AS REQUIRED
2. EXCAVATE PIPE TRENCHES
3. STOCK PILE TOP SOIL IF REQUIRED
4. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE.
5. INSTALL UTILITIES
6. COMPLETE GRADING AND INSTALL PERMANENT SODDING/SEED & MULCHING/HYDRO-SEEDING
7. COMPLETE FINAL PAVING AND GRADING
8. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE ANY TEMPORARY CONTROLS.
WIND EROSION STABILIZATION: THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE EXCAVATED OR ALTERED WITHIN A TWO (2) WEEK TIME-FRAME. FINAL GRADES SHALL BE PERFORMED AND TEMPORARY OR PERMANENT SOIL STABILIZATION SHALL BE APPLIED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY APPLYING A WATER SPRAY TO SATURATE THE SURFACE SOILS ON A DAILY BASIS, OR AS NEEDED TO MAINTAIN MINIMAL DUST TRANSPORT. FUGITIVE DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN TO CONTROL OFF-SITE TRANSPORT OF
UNACCEPTABLE LEVELS OF DUST.
TEMPORARY STABILIZATION: TOP SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR AT LEAST 10 DAYS WILL BE STABILIZED WITH TEMPORARY GRASS AND MULCH NO LATER THAN 5 DAYS FROM THE LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA SEED AND 80 PARTS OF PENSACOLA BAHIA. THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY, CONSISTING OF OAT, RYE OR WHEAT STRAW, OR OF PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH WHICH CAN BE READILY CUT INTO THE SOIL SHALL BE USED. AREAS OF THE SITE WHICH ARE TO BE PAVED WILL
BE TEMPORARILY STABILIZED BY APPLYING STABILIZATION AND BASE.
PERMANENT STABILIZATION: DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASES SHALL BE STABILIZED AND RESTORED TO PRECONSTRUCTION CONDITIONS NO LATER THAN 5 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.
STAKED SILT FENCES: THE STAKED SILT FENCES WILL BE CONSTRUCTED ALONG THE PERIMETER AS PREVIOUSLY EXPLAINED. THESE DEVICES
WILL FILTER RUNOFF AND/OR DIVERT RUNOFF TO THE SEDIMENT BASINS (IF NEEDED).
SEDIMENT BASINS: IF NEEDED, SEDIMENT BASINS WILL BE CONSTRUCTED TO A MINIMUM OF 2' BELOW EXISTING GROUND AT THE CONTRACTORS DISCRETION TO ALLOW SILTS TO BE COLLECTED AND REMOVED. EACH BASIN SHALL HAVE SIDE SLOPES NO STEEPER THAN
4:1 AND BE STABILIZED PRIOR TO USE.
STORM WATER DRAINAGE WILL BE PROVIDED BY SWALE, TEMPORARY AND SEDIMENT BASINS, AS NEEDED. SWALES TO BE SODDED AND INCLUDE CHECK DAMS, RIP RAP, HAY BALES OR OTHER CONTROLS TO CONTROL RUNOFF VELOCITY AND TRANSPORT OF SEDIMENT. WHEN CONSTRUCTION IS COMPLETE THE IMPROVED PORTION OF THE SITE WILL DRAIN AS IT DID PRIOR TO THE UTILITY INSTALLATION.
WASTE MATERIALS: ALL WASTE MATERIAL WILL BE COLLECTED AND STORED IN DUMPSTERS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTERS. THE DUMPSTERS WILL BE EMPTIED A MINIMUM OF ONCE A WEEK OR MORE OFTEN IF NECESSARY, AND THE TRASH WILL BE HAULED TO A REGISTERED LANDFILL FOR DISPOSAL. NO EXCESS CONSTRUCTION MATERIALS WILL BE BURIED ON-SITE. ALL PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES WILL BE POSTED IN THE ON-SITE OFFICE TRAILER AND THE CONSTRUCTION MANGER RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED.
HAZARDOUS WASTE: ALL HAZARDOUS WASTE MATERIALS, IF ENCOUNTERED, WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED.
SANITARY WASTE: ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS A MINIMUM OF THREE TIMES PER WEEK BY A
LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR, AS REQUIRED BY LOCAL REGULATION.
THE PAVED STREETS WILL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM/TO THE SITE. DUMP TRUCKS HAULING MATERIAL FROM OR TO THE SITE WILL BE COVERED WITH A TARPAULIN AT ALL TIMES.
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL
EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON-SITE DURING THE CONSTRUCTION PROJECT.
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB. ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL MANUFACTURER'S LABELED CONTAINERS. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE DISPOSING OF THE CONTAINER.
MANUFACTURERS' RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED. THE SITE SUPERINTENDENT SHALL INSPECT DAILY
TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON-SITE.
HAZARDOUS PRODUCTS:
THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS.
PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT RESEALABLE. ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT INFORMATION. IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS' OR LOCAL AND
STATE RECOMMENDED METHODS OF PROPER DISPOSAL SHALL BE FOLLOWED.
THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ON-SITE:
PETROLEUM PRODUCTS:
ALL ON-SITE VEHICLES WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE.
PETROLEUM PRODUCTS WILL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED
ON-SITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
FERTILIZERS:
FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE WILL BE IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER WILL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS.
IT IS EXPECTED THAT THE FOLLOWING NON-STORM WATER DISCHARGES WILL OCCUR FROM THE SITE DURING THE CONSTRUCTION PERIOD:
WATER FROM DEWATERING, WATER LINE FLUSHING, WATER USED TO SPRAY OFF LOOSE SOILS FROM VEHICLES, DUST CONTROL, PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE OCCURRED). ALL NON-STORM WATER DISCHARGES WILL
BE DIRECTED TO A SEDIMENT BASIN PRIOR TO DISCHARGE.
GROUNDWATER DEWATERING ACTIVITIES ARE NOT COVERED BY THIS PERMIT. THE CONTRACTOR SHALL APPLY FOR COVERAGE UNDER THE GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUNDWATER FROM ANY NON-CONTAMINATED SITE ACTIVITY PURSUANT TO 62-621.300 (2), F.A.C.
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERIC STORM WATER PERMIT ISSUED PURSUANT TO SECTION 403.0885, F.S., THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM
THE CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION.
NAME OF RECEIVING WATERS: ALLIGATOR CREEK
PROJECT NAME: SOLID WASTE TRUCK WASH
REPLACEMENT
SITE LOCATION:
1701 NORTH HERCULES AVE.
CLEARWATER, FL
OWNER OF PROJECT: CITY OF CLEARWATER, FLORIDA
OWNER'S ADDRESS: 100 S. MYRTLE AVE.
CLEARWATER, FL 33756
PROJECT COORDINATES: LONGITUDE: 82° 45' 8.61" W
LATITUDE: 27° 58' 57.13" N
THE MATERIALS OR SUBSTANCES LISTED BELOW ARE EXPECTED, BUT NOT LIMITED TO, BE PRESENT ON SITE DURING CONSTRUCTION:
CONCRETE FERTILIZERS
DETERGENTS PETROLEUM BASED PRODUCTS AND FUELS
PAINTS (ENAMEL AND LATEX) CLEANING SOLVENTS
METAL TRENCH BOXES WOOD
TAR (PAVEMENT) STONE
SAND
PAINTS:
ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT WILL NOT BE DISCHARGED TO THE STORM SEWER SYSTEM BUT WILL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURERS' INSTRUCTIONS OR STATE AND LOCAL
REGULATIONS.
CONCRETE TRUCKS:
CONTRACTOR SHALL DESIGNATE AN AREA FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND SHALL INSTALL A CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR IN ACCORDANCE WITH LOCAL RULES AND REGULATIONS UPON COMPLETION OF THE PROJECT.
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS HAVE BEEN READ BY ME OR MY DESIGNATED REPRESENTATIVE AND UNDERSTAND THAT THIS SYSTEM HAS BEEN PREPARED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSONS WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS.
OWNER REPRESENTATIVE
SIGNED:______________________________
NAME AND TITLE:
COMPANY: CITY OF CLEARWATER PUBLIC WORKS DEPARTMENT
ADDRESS: 100 S. MYRTLE AVE.
CLEARWATER, FL 33756
DATE:_________________________________
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEANUP SUPPLIES.
MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREA ON-SITE. EQUIPMENT AND MATERIALS WILL INCLUDE, BUT NOT BE LIMITED TO, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, KITTY LITTER, SAND, SAWDUST, AND PLASTIC AND METAL TRASH CONTAINERS. SPECIFICALLY FOR THIS PURPOSE.
ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
THE SPILL AREAS WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT
INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.
SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE SIZE.
THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP
MEASURES WILL ALSO BE INCLUDED.
THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS, WILL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. HE WILL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE INDIVIDUALS WILL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSTED IN THE MATERIAL STORAGE AREA AND IN THE OFFICE TRAILER ON-SITE.
CONTROLS
SITE DESCRIPTION
EROSION AND SEDIMENT CONTROLS
STABILIZATION PRACTICES
STRUCTURAL PRACTICES
STORM WATER MANAGEMENT
OTHER CONTROLS
WASTE DISPOSAL
OFFSITE VEHICLE TRACKING
TIMING OF CONTROL MEASURES
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS
MAINTENANCE INSPECTION PROCEDURES
EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES
THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROL.
ALL CONTROL MEASURES IN DISTURBED AREAS WILL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS OF THE END OF ANY STORM EVENT OF 0.25 INCHES OR GREATER BY A CONTRACTORS REPRESENTATIVE. (WHERE SITES HAVE BEEN FINALLY STABILIZED SUCH INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH.) ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORT. BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE. SILT FENCE WILL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. THE SEDIMENT BASINS WILL BE INSPECTED FOR DEPTH OF SEDIMENT, AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 PERCENT OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. TEMPORARY AND PERMANENT GRASSING, MULCHING AND SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE CONSTRUCTION TRAILER. THE SITE SUPERINTENDENT WILL SELECT INDIVIDUALS WHO WILL BE RESPONSIBLE FOR MAINTENANCE AND REPAIR ACTIVITIES. FILLING OUT THE INSPECTION AND MAINTENANCE REPORT WILL BE BY THE CONTRACTOR. PERSONNEL SELECTED FOR AND MAINTENANCE RESPONSIBILITIES WILL RECEIVE TRAINING FROM THE SITE SUPERINTENDENT. THEY WILL BE TRAINED IN ALL MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS
USED ON-SITE IN GOOD WORKING ORDER.
NON-STORM WATER DISCHARGES
INVENTORY FOR POLLUTION PREVENTION PLAN
SPILL PREVENTION
MATERIAL MANAGEMENT PRACTICES
SPILL PREVENTION CONTINUED
MATERIAL MANAGEMENT PRACTICES CONTINUED
SPILL CONTROL PRACTICES
NOTICE OF TERMINATION
POLLUTION PREVENTION PLAN CERTIFICATION
A NOTICE OF TERMINATION WILL BE SUBMITTED TO EPA AFTER THE CONSTRUCTION HAS BEEN COMPLETED AND THE SITE HAS
UNDERGONE FINAL STABILIZATION.
CONTRACTOR'S CERTIFICATION
FOR:
NAME:
TITLE:
DATE:
NAME:
TITLE:
DATE:
NAME:
TITLE:
DATE:
COMPANY:
ADDRESS:
PHONE:
RESPONSIBLE FOR:
COMPANY:
ADDRESS:
PHONE:
COMPANY:
ADDRESS:
PHONE:
GENERAL CONTRACTOR
TEMPORARY AND PERMANENT
STABILIZATION
STABILIZED CONSTRUCTION ENTRANCE,
EARTH DIKES, SEDIMENT BASIN
TBD
BID DOCUMENTS
Ju ne
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -S
W
PP
P.
dw g
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
G0.04
C-SWPPP.DWG
06/15/2026
MSC
Tampa, Florida 33634 Phone: (813) 880-8881
100 S. MYRTLE AVE.
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-SWPPP.dwg
APP. R/W LINE TYP.
AP
P.
R /W
L
IN
E
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
PROPOSED AUTOMATED
TRUCK WASH (TYP.)
EX. MONITORING
WELL (TYP.)
CONTRACTOR TO UTILIZE
SUNSHINE DR. OR LOGAN ST.
FOR CONSTRUCTION ACCESSIBILITY
PROPOSED MANUAL
TRUCK WASH
EXISTING FUEL STORAGE
FACILITY
EX. MATERIALS
RECOVERY FACILITY
PROPOSED AUTOMATED TRUCK WASH (TYP.)
(ADDITIVE ALTERNATE)
TEMPORARY IMPACT ZONE UNDER (BASE BID)
FUEL TANK ACCESS ZONE
ADDITIVE ALTERNATETEMPORARY IMPACT TO EX MANHOLE
(ADDITIVE ALTERNATE)
C S X R A I L R O A D R / W
N . H
ER
CU
LE
S
AV
E.
BID DOCUMENTS
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
G0.05
One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com License #2610
SCALE: FEET
SCALE: FEET
C-SP.DWG
06/15/2026
MJG
LEGEND
CONTRACTOR TO MAINTAIN
UNOBSTRUCTED ACCESS
MANUAL TRUCK WASH WORK ZONE
AUTOMATIC TRUCK WASH WORK ZONE
ADDITIVE ALTERNATE
FUEL TANK ACCESS ZONE
ADDITIVE ALTERNATE
TEMPORARY IMPACT ZONE
(ONLY DURING UTILITY CONSTRUCTION
AND PAVING & STRIPING)
Ju ne
5, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -S
P.
dw g
05/29/26CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-SP.dwg
RAWN:
M
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
SAN SANST
M
ST
M
ST
M
ST
M
ST
M
ST
M
G A
S
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S
G A
S
GAS
GAS
GAS
N . H
ER
CU
LE
S
AV
E.
C S X R A I L R O A D R / W
APP. R/W LINE TYP.
AP
P.
R /W
L
IN
E
APP. R/W LINE TYP.
APP. R/W LINE TYP.
EX. JERSEY BARRIER WALL
TO BE REMOVED BY CITY
OR RELOCATED PER
ADDITIVE ALTERNATE
EX. 6" DI WMEX. 12" WM
EX. 2" PVC WM
EX. 2" PVC WM
EX. TRUCK WASH PAD
TO BE REMOVED
SEE SHEET C1.02
EX. 2" WM TO BE REMOVED
CUT AND CAP
EX. 2" PVC WM
EX. CONC. PAD
TO BE REMOVED
EX. CONC. PAD
TO BE REMOVED
EX. 750 GAL.
GREASE TRAP MH
3' FROM
EX. EOP
3' F
RO
M
E X.
E
OP
SAW-CUT EX. PAVEMENT
(TYP)
SAW-CUT EX. PAVEMENT
(TYP)
EX. EOP
EX
. E
OP
EX. MONITORING
WELL (TYP.)
CUT AND CAP EX. 2" WM SAW-CUT EX.
PAVEMENT (TYP)
ADDITIVE ALT.
SAWCUT PI
ADDITIVE ALT.
N 1327080.96
E 413274.65
SAWCUT PI
ADDITIVE ALT.
N 1327069.28
E 413312.54
SAWCUT PI
ADDITIVE ALT.
N 1327053.41
E 413364.04
SAW-CUT EX. CONC.
PAVEMENT (TYP)
ADDITIVE ALT.
SAWCUT PI
ADDITIVE ALT.
N 1327044.45
E 413361.32
SAWCUT PI
ADDITIVE ALT.
N 1327055.47
E 413238.54
SAWCUT PI
ADDITIVE ALT.
N 1326953.82
E 413207.20
CONTAMINATED SOIL AREA OF INTEREST
SEE SPECIFICATION 01030
BEGIN STAKED
SILT FENCE
N 1327209.17 E 413234.81
BEGIN STAKED
SILT FENCE
N 1326736.36 E 413333.40
END STAKED
SILT FENCE @ EX. FENCE
N 1327105.89 E 412692.06
BEGIN STAKED SILT
FENCE @ EX. WALL
N 1327105.89 E 412670.04
TREE BARRICADE &
ROOT PRUNING
C8.00
TREE BARRICADE
C8.00
C8.00
NOTE:
NO EXCAVATION SHALL BE CONDUCTED
INSIDE THE DESIGNATED TREE BARRICADES.
ADDITIVE ALTERNATE
PAVEMENT REMOVED
BID DOCUMENTS
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
C1.00
One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com License #2610
SCALE: FEET
SCALE: FEET
C-SPD-100.DWG
06/15/2026
MSC
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -S
PD
-1
.d w g
AT
CH
L
IN
E
SE
E
SH
EE
T C1
.0
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
100 S. MYRTLE AVE.
C:\Users\Mgladbach\DC\ACCDocs\Ardurra, Inc\2024-0578-00\Project Files\03-Prod\03-Dwgs\C-SPD-100.dwg
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S
GAS
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
GAS GAS
EX. CONTROL STRUCTURE -
SEE DETAIL ON SHT C8.02
SAWCUT PI
ADDITIVE ALT.
N 1327030.94 E 413405.73
EX. FUEL STORAGE TANKS
EX. FUELING STATION
EX. STORM WATER
RETENTION AREA
AP
P.
P
RO
PE
RT
Y
LI
NE
(T
YP
APP. PROPERTY LINE (TYP.)
AP
P.
R /W
L
IN
E (T
YP
APP. PROPERTY LINE (TYP.)
AP
P.
R /W
L
IN
E (T
YP
AP
P.
R /W
L
IN
E (T
YP
AP
P.
R /W
L
IN
E (T
YP
CONTAMINATED SOIL AREA OF INTEREST
SEE SPECIFICATION 01030
CONTAMINATED SOIL AREA OF INTEREST
SEE SPECIFICATION 01030
PI STAKED
SILT FENCE
N 1327205.06 E 413389.73
PI STAKED
FILT FENCE
N 1327180.21
E 413422.60 END STAKED FILT FENCE
@ EX. CHAINLINK FENCE
N 1327172.60
E 413787.80
STAKED SILT FENCE
AROUND EX. CONTROL
STRUCTURE
END STAKED FILT FENCE
@ EX. CHAINLINK FENCE
N 1327134.23 E 413456.13
STAKED SILT FENCE
PLACEMENT BETWEEN SHRUBS
& EX. CONCRETE PAD
BID DOCUMENTS
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
C1.01
One Memorial Center, Suite 300
Tampa, Florida 33634 Phone: (813) 880-8881 www.Ardurra.com License #2610
SCALE: FEET
SCALE: FEET
C-SPD-100.DWG
06/15/2026
MSC
2, C
U se rs
\M gl ad ba ch \D
C\
AC
CD
oc s\ Ar du rr a, In c\
-0
8-
\P ro je ct F ile s\
-P ro d\
-D w gs
\C -S
PD
-1
.d
AT
CH
L
IN
E
SE
E
SH
EE
T C1
.0
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
NOTE:
NO EXCAVATION SHALL BE CONDUCTED
INSIDE THE DESIGNATED TREE BARRICADES.
SA
N
SA
N
GAS GAS
EX. MANUAL WASH EQUIPMENT BLDG TO
REMAIN - EX. EQUIPMENT TO BE REPLACED
SEE SHT.D1.07
APP. R/W LINE TYP.
EX. GAS METER
12.00'
EX. STORM STRUCTURE
TO BE REMOVED
EX. STORM STRUCTURE
TO BE REMOVED
EX. STORM STRUCTURE
TO BE REMOVED
EX. STORM PIPE
TO BE REMOVED (TYP.)
EX. 750 GAL. GREASE TRAP
TO REMAIN
EX. CONCRETE WALK
TO REMAIN
EX. CHAINLINK FENCE (TYP.)
(14) EX. BOLLARDS
TO BE REMOVED
SAW CUT AND REMOVE
EX. PAVEMENT
EX. CONCRETE WASH PAD
& APPURTENANCES
TO BE REMOVED
12.00'
.0
0'
EX. BOLLARDS
TO BE REMOVED (TYP.)
DISCONNECT STORM PIPE
AT NEAREST JOINT OR SAW
CUT EX. PIPE AS REQUIRED
APP. DRIP LINE (TYP.)
TREE BARRICADE (TYP.)
SAW CUT EX. CONC WALK
AT FACE OF BUILDING
C8.00 BID DOCUMENTS
RECORD DRAWINGS
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
CALL 811
SHEET NO.:
CONTRACT NO.: DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED BY
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .