About this file

This document is Addendum #1 to the City of Harrisonburg's ITB/RFP #2024003-PW-P for HVAC Preventive Maintenance Services. The addendum clarifies that the scope of work includes inspection and maintenance of the Trane Tracer Summit building controls system at the Lucy Simms Center. This includes reviewing the system's operation, backing up programming, replacing backup batteries, and performing diagnostics on control loops. All other terms and conditions of the original RFP remain unchanged.

The addendum also requires the signed acknowledgement page to be returned with any bid or proposal submitted in response to this RFP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

ITB/RFP NUMBER: 2024003-PW-P

HVAC Preventive Maintenance Services RFP

DATE: December 11, 2023

TO: All Potential Bidders/Offerors

City of Harrisonburg’s HVAC Preventive Maintenance Services RFP, is modified as follows:

1. Question: I did not see anything listed under the scope for controls for the Trane Tracer Summit controls at the Lucy Simms Center. Is this part of the RFP scope?

Answer: Yes. Please see below.

Building Controls Inspection

System PC and Building Control Unit

1. Review on-site logbook of system operation and alarms; discuss same with building operator.

2. Review operating program to include major operating parameters, system control scheme, time of day scheduling, system control setpoints, minimum damper positions, change as required for optimal performance.

3. Backup and verify current program on hard disk.

4. Replace emergency backup battery, if required.

Field Control Panels

1. Inspect for dust.

2. Check communication to all field devices.

3. Verify correct input voltages.

4. Verify resident programming.

5. Perform diagnostics on a sampling of control loops.

6. Check all output signals where appropriate, calibrate as required.

7. Review findings of inspection with owner personnel, provide recommendations to enhance system performance.

All other requirements, terms and conditions of the ITB/RFP remain unchanged.

Addendum page must be signed and returned with your bid/proposal to acknowledge receipt of this addendum.

Authorized Signature

By: Shane B. Smith