2-MWJ2606-Section 02000 - 2.01 - Bid Submittal Form.xlsx
XLSX spreadsheet 68 KB Posted
- Attached to
- Electrical Low Voltage - JOC
- Solicitation number
- MWJ2606
- Issued by
- Cook County, Illinois
About this file
This is a Bid Submittal Form for an Electrical Low Voltage Job Order Contract (JOC) with City Colleges of Chicago (CCC) in Illinois. The contract enables CCC to issue individual Job Orders for electrical work across its facilities, including IT/AV systems, low voltage installations, security products, access control, turnstiles, and CCTV systems. Upon receipt of a Notice to Proceed for each Job Order, the selected contractor must provide all necessary management, labor, materials, supplies, equipment, transportation, and supervision to complete the specified electrical improvements.
Bidders must submit three separate Adjustment Factors as multipliers to the Construction Task Catalog base prices of 1.0000: a Normal Working Hours Adjustment Factor (Monday–Friday, 6:00 a.m.–5:00 p.m., excluding County Holidays) weighted at 60 percent; an Other Than Normal Working Hours Adjustment Factor (weekday evenings 5:01 p.m.–5:59 a.m., weekends, and County Holidays) weighted at 20 percent; and a Non-Prepriced Adjustment Factor for work not in the catalog, weighted at 20 percent. All Adjustment Factors must include a 1.00 percent JOC System License Fee and must comply with CCC's Cabling Standards as documented in Volume V. The Other Than Normal Working Hours factor must be greater than or equal to the Normal Working Hours factor, and the Non-Prepriced Adjustment Factor must be at least 1.0000. An Award Criteria Figure calculated from the three weighted factors determines the lowest proposed price for evaluation purposes, though no guarantee exists that work will be distributed according to these percentages.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 02000 |
| 2.01 - BID SUBMITTAL FORM - SCHEDULE OF PRICES |
| Enter the Bidder's proposed Adjustment Factors in Part A, and in Part B, certify / agree to CCC's cabling standards. Make sure to read the "Notes to Bidder" contained in Part C |
BIDDER'S NAME:
| PART A: Having carefully examined the specifications and being familiar with all the conditions affecting this bid, the undersigned agrees to furnish all material, labor, equipment and such other apparatus, supervision, and construction project management as required to satisfactorily meet the specifications. (All blanks must be completed). |
| The Bidder shall set forth Adjustment Factors in the respective space provided. Failure to submit all Adjustment Factors will result in the bid being deemed non-responsive. The Contractor shall perform the Work required by each individual Job Order using the following Adjustment Factors: |
| Adjustment Factor Name | ADJUSTMENT FACTOR PROPOSED | |
| ADJUSTMENT FACTORS | Normal Working Hours (60% Weight) | |
| Other than Normal Working Hours (20% Weight) | ||
| Non-Prepriced Adjustment Factor (20% Weight) | ||
| Award Criteria Figure | 0.0000 | |
| Part B: Please certify that you have received/reviewed a copy of Volume V – City Colleges of Chicago (CCC) Cabling Standards and agree that all pricing proposed is based on following these standards? |
| The Bidder certifies that they have received and reviewed a Copy of Volume IV: CCC Cabling Standards and the proposed pricing is based on these standards: | ||
| Certified and Agreed? (Yes / No) | ||
| PART C: NOTES TO Bidder | ||
| 1. There are three Adjustment Factors for this Contract. When preparing a Price Proposal, the Contractor shall select the appropriate Adjustment Factor. The Adjustment Factors are as follows: | ||
| a. Normal Working Hours Adjustment Factor: Monday through Friday 6:00 am to 5:00 pm except County Holidays | ||
| b. Other Normal Working Hours Adjustment Factor: Monday through Friday 5:01 pm to 5:59 am, and all day Saturday, Sunday and County Holidays | ||
| e. Non-Prepriced Adjustment Factor: For Non Pre-Priced Work. | ||
| 2. The Adjustment Factor for Other Than Normal Working Hours must be greater than or equal to the Adjustment Factor for Normal Working Hours. | ||
| 3. The Non Pre-Priced Adjustment Factor must be greater than or equal to 1.0000 | ||
| 4. ADJUSTMENT FACTORS MUST INCLUDE THE 1.00% JOC SYSTEM LICENSE FEE | ||
| 5. The Construction Task Catalog® (CTC) is priced at a net value of 1.0000. The bid shall be an increase to" (e.g., 1.1000 or decrease e.g., 0.9500) to the Unit Prices listed in the Construction Task Catalog®. Bidders who submit separate Adjustment Factors for separate Unit Prices may be considered non-responsive and their Proposal may be rejected. | ||
| 6. For bid evaluation purposes only, the following work distributions shall be used to determine the Award Criteria Figure for Contract: | ||
| a. Normal Working Hours Adjustment Factor: | 60% | |
| b. Other Normal Working Hours Adjustment Factor: | 20% | |
| e. Non-Prepriced Adjustment Factor: | 20% | |
| 7. The weighted multipliers above are for the purpose of calculating an Award Criteria Figure only. No assurances are made by the County that Work will be ordered under the Contract in a distribution consistent with the weighted percentages above. The Award Criteria Figure is only used for the purpose of determining the lowest proposed price. | ||
| 8. When submitting Job Order Proposals related to specific Job Orders, the Bidder shall utilize one or more of the Adjustment Factors applicable to the Work being performed. |