2-FAC25022-Art Barn IAImprvmts PROJECT MANUAL.pdf
PDF 7 MB Posted
- Solicitation number
- FAC25022
- Issued by
- Utah
About this file
This is a Project Manual for a construction contract issued by Salt Lake City Corporation's Department of Public Services, Architecture and Construction Management Division for infrastructure and accessibility improvements to the Art Barn Arts Council Offices and Finch Gallery located at 54 South Finch Lane, Salt Lake City, Utah. The scope of work includes remodeling administrative offices, interior demolition, new gallery lighting, new wood floors, new carpet installations, main entry modifications, new ADA access entry, and general mechanical and electrical modifications, with substantial completion required by midnight on January 21, 2027. A pre-bid conference was held on October 20, 2026 at 10:00 a.m. via Microsoft Teams, and sealed bids were due by 2:00 p.m. on October 28, 2026, submitted electronically via Bonfire, by U.S. mail, or by hand delivery to the Architecture and Construction Management Office at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111. Bids were publicly opened via Microsoft Teams on October 28, 2026 at approximately 2:00 p.m. The construction contract will be awarded on a lump sum basis to the most responsive and lowest qualified, responsible bidder as determined by Salt Lake City.
Bidders must provide bid security equal to at least five percent of the total bid amount in the form of a bid bond or cashier's check. The contract is not subject to prevailing wage requirements, and no CDBG funding applies to this project. The engineer's estimate exceeds $250,000 but does not exceed $2,000,000, making the project subject to Salt Lake City's Building Improvement or Public Works Projects procurement requirements under Section 3.24.115 of the Salt Lake City Code, which require bidders to certify compliance with work environment standards including drug and alcohol testing policies, veteran recruitment programs, job training programs, safety programs, and non-discrimination policies. Liquidated damages are assessed at $1,000 per day for late completion and 50 percent of that amount per day for late punch list completion. Retainage is at the Owner's discretion up to five percent of payments, with released retainage earning interest. The contract documents reference the current edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-FAC25022 Notice to Bidders Art Barn Accessibility.pdf | ||
| 3-FAC25022-Art Barn IAImprvmts PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
For
ART BARN INFRASTRUCTURE AND ACCESSIBILITY
IMPROVEMENTS
JOB No. FAC25022
DEPARTMENT of PUBLIC SERVICES
ARCHTITECTURE AND CONSTRUCTION MANAGEMENT DIVISION
349 SOUTH 200 EAST STREET, SUITE 600
P.O. BOX 145506
SALT LAKE CITY, UTAH 84114-5506
DIRECTOR JORGE CHAMORRO
CITY ARCHITECT SEAN A. FYFE, AIA
Project Title Page
00 01 01 - 1
SALT LAKE CITY CORPORATION
Salt Lake City, Utah
PROJECT MANUAL
FOR
ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS
JOB NO. FAC25022
PREPARED BY
Department of Public Services Architecture and Construction Management Division
349 South 200 East, Suite 600 Salt Lake City, UT 84111
Revised March 12, 2009 Seals Page
00 01 07 - 1
S E A L S P A G E
ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS
Job No. FAC25022
PROJECT MANUAL PREPARED UNDER THE DIRECTION OF
ARCHITECTURE
Professional’s Name: Angelica Pavoni
Company: Edwards & Daniels Associates Inc.
(DBA EDA, DBA EDA Architects)
Address: 9 Exchange Place, Suite 1100, SLC T 84111
Phone Number: 801-531-7600
ELECTRICAL
Professional’s Name: Brian Hicks
Company: VBFA-BNA Corp (DBA Resolut, DBA Resolut Group)
Address: 181 E 5600 S, Murray, UT 84107
Phone Number: 801-530-3148
MECHANICAL
Professional’s Name: Ben Davis
Company: VBFA-BNA Corp (DBA Resolut, DBA Resolut Group)
Address: 181 E 5600 S, Murray, UT 84107
Phone Number: 801-530-3148
Revised March 15, 2013 Table of Contents
00 01 10 - 1
T A B L E O F C O N T E N T S
ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS
Job No. FAC25022
Reference No. of Number Title Pages
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 Project Title Page 00 01 07 Seals Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 00 11 16 Invitation to Bid 00 21 13 Instructions to Bidders 00 22 13 Supplementary Instructions to Bidders 00 22 18 Supplementary Instructions (VP) 00 41 00 Bid Form 00 43 00 Bid Schedule 00 43 36 Proposed Subcontractor Form 00 43 37 Work Under Contract Report 00 43 38 Bidder Status Report 00 43 40 Value Program Form 00 52 00 Agreement 00 54 15 Value Program Supplemental Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond 00 62 11 Submittal Transmittal Form 00 62 16 Certificate of Insurance Form 00 65 13 Certificate of Substantial Completion 00 73 10 Modifications to the General Conditions 00 91 13 Addenda
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 25 00 Substitution Procedure Substitution Request Form CSI 13.1 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References
00 01 10 - 2
01 50 00 Temprary Facilities and Controls 01 56 39 Tree Protection 01 60 00 Product Requirements 01 73 00 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Demolition
DIVISION 05 – METALS
05 52 13 Pipe and Tube Railings
DIVISION 06 – WOOD, PLASTIC, AND COMPOSITES
06 10 00 Rough Carpentry 06 40 13 Exterior Architectural Woodwork 06 40 23 Interior Architectural Woodwork 06 41 16 Plastic-laminate-faced Architectural Cabinets
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 62 00 Sheet Metal Flashing and Trim 07 92 00 Joint Sealants
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 71 00 Door Hardware
DIVISION 09 – FINISHES
09 29 00 Gypsum Board 09 51 13 Acoustic Panel Ceilings 09 51 23 Acoustic Tile Ceilings 09 64 00 Wood Flooring 09 65 13 Resilient Base and Accessories 09 68 13 Tile Carpeting 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 93 00 Staining and Transparent Finishes
DIVISION 10 – SPECIALTIES
10 14 23 Panel Signage
00 01 10 - 3
DIVISION 12 – FURNISHINGS
12 36 23.13 Plastic-laminate-Clad Countertops
DIVISION 23 – MECHANICAL
23 05 00 Common Work Results for HVAC 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 13 Duct Insulation 23 30 01 Common Duct Requirements 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 37 13 Diffusers, Registers, and Grilles
DIVISION 26 – ELECTRICAL
26 05 00 Electrical General Provisions 26 05 02 Electrical Submittals and Spare Parts 26 05 07 Electrical Connections for Equipment 26 05 19 Conductors and Cables (600V and Below) 26 05 29 Supporting Devices 26 05 32 Conduit Raceways 26 05 33 Electrical Boxes and Fittings 26 05 53 Electrical Identification 26 09 23 Occupancy Sensors 26 27 26 Wiring Devices 26 41 19 Demolition 26 51 00 Interior and Exterior Building Lighting
DIVISION 31 – EARTHWORK
31 10 00 Site Clearing 31 20 19 Earthwork
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealants
APPENDIX
Tree Protection Guidelines
END OF DOCUMENT
List of Drawing Sheets 00 01 15 - 1
DOCUMENT 00 01 15
LIST OF DRAWING SHEETS
ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS,
FAC25022
DRAWINGS
Sheet
No. Title
1 G000 Title Sheet
2 G001 Notes, Sheet Indexes, Abbreviations, and Vicinity Map
3 A001 Site Staging Plan
4 AD101 Main Floor Demolition Plan
5 AD102 Main Floor Reflected Ceiling Demolition Plan
6 A100 Level 01 Floor Plan
7 A110 Main Floor Reflected Ceiling Plan
8 A120 Roof Plan
9 A500 Details
10 ME001 HVAC Title Sheet
11 MD101 Mechanical Demo Plan
12 M101 Mechanical Plan
13 M501 Mechanical Details and Schedules
14 E001 Electrical Title Sheet
15 E002 Electrical Schedules
16 ED111 Main Level - Demolition Plan
17 EL111 Main Level - Lighting Plan
18 EP101 Basement Power Floor Plan
19 EP111 Main Level Power Floor Plan
20 EP600 Power Schedule
REFERENCE DRAWINGS
1. Manual of Standard Plans published by the Utah Chapter of the American Public Works Association.
List of Drawing Sheets 00 01 15 - 2
Revised October 15, 2013 Invitation to Bid 00 11 16 - 1
DOCUMENT 00 11 16
INVITATION TO BID
PART 1 GENERAL
1.1 CONSTRUCTION CONTRACT
A. Bidders are invited to bid on the Construction Contract named and numbered as:
ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS
FAC25022
B. For information about the award of this Construction Contract, contact Debby Newton, Facilities Support Coordinator at 801-535-6224 or debby.newton@slc.gov.
C. For information about technical requirements, contact Nathan Johnsen at (385) 272- 0467.
1.2 DESCRIPTION OF WORK
A. The location of the work is:
Art Barn Arts Council Offices and Finch Gallery 54 South Finch Lane Salt Lake City, Utah 84102 B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Remodeling Administrative offices, interior demolition, new gallery lighting, new wood floors, new carpets, main entry modifications, new ADA access entry, general mechanical and electrical modifications, ceiling modifications, and painting.
1.3 BIDDERS' PRE-QUALIFICATION
A. Bidders are not required to be pre-qualified for the Work.
1.4 BASIS OF BIDS
A. Bids shall be on a lump sum basis. Unsealed or segregated Bids will not be accepted.
1.5 CONTRACT TIME
A. The Work will be Substantially Complete by midnight of the 21st day of January, 2027.
Calendar days for winter shut down are included above.
1.6 EXAMINATION AND PROCUREMENT OF DOCUMENTS
A. Complete sets of Contract Documents may be examined and obtained from https://utah.bonfirehub.com/portal/?tab=openOpportunities.
B. To ensure that notification of addenda is received, BIDDERS please register with Bonfire at the Utah Public Procurement Place (U3P) at https://purchasing.utah.gov/.
1.7 PRE-BID CONFERENCE
A. A pre-bid conference will be held at October 20, 2026, 10:00 am via Microsoft Teams.
All contractors intending to submit a bid are invited to attend to obtain relevant
00 11 16 - 2 information concerning the project. Bidders are advised that information affecting drawings, specifications, conditions, scope of the Work, etc. may be discussed.
OWNER assumes no obligation to disclose information discussed at the pre-bid conference to Bidders who do not attend. Absent Bidders assume all risk of failure to attend.
1.8 BID SECURITY
A. Bid security must equal at least 5 percent of the total amount of the Bid. The Bid security must guarantee that the Bidder, if awarded the Work, will promptly enter into the Construction Contract to perform the Work in the manner required by the Contract Documents. Bidders must deliver Bid security to OWNER at the time they deliver their Bid. If Bid Security is not delivered with the Bid, the Bid will not be read or accepted.
If a Bidder submits a bid electronically using Bonfire, the Bid security must be an electronic or scanned Bid bond. OWNER will not accept an emailed or faxed Bid bond. If a Bidder submits a bid by U.S. mail or hand-delivery, the Bid security must be either a hard-copy original Bid bond or a hard-copy original cashier’s check. Electronic or scanned copies, photocopies, or facsimile transmissions of bonds will not be accepted with hard-copy Bid submission. Bid security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract.
1.9 BID LOCATION AND OPENING
A. Sealed bids shall be received (1) electronically via Bonfire, (2) by U.S. mail addressed to the Architecture and Construction Management Office, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111, or (3) by in-person hand delivery of a hard copy at the Architecture & Construction Management Office, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111, until 2:00 p.m. local prevailing time, on Wednesday, October 28, 2026, 2:00 pm for ART BARN INFRASTRUCTURE AND ACCESSIBILITY IMPROVEMENTS, FAC25022. Bids delivered to any other location will not be accepted. Bids received after 2:00 p.m. will not be accepted. When submitting a bid electronically, bidders must allow sufficient time before the deadline to complete the forms and upload documents. The bid event will end at the closing time posted on Bonfire. If a bidder is in the middle of uploading a bid when the closing time arrives, Bonfire will stop the process and the bid or bid modification will not be accepted. Bids will be publicly opened via Microsoft Teams, in lieu of the Architecture and Construction Management Office located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111 at or about 2:00 p.m., local prevailing time on October 28, 2026.
B. On the outside of the envelope, Bidder shall indicate the nature of the bid and include Bidder's return mailing address.
1.10 RIGHT TO REJECT BIDS
A. OWNER reserves the right to reject any or all bids or to waive any informality or technical error in any bid if OWNER deems it to be in its best interest.
1.11 VALIDITY PERIOD FOR BIDS
00 11 16 - 3
A. Bids shall remain valid for 45 days after the day of Bid opening. A Bidder who receives a Notice of Intent to Award and who withdraws his bid after Bid opening, but before expiration of said period, shall forfeit his bid security.
1.12 GOVERNING LAWS AND REGULATIONS
A. This project does not require the payment of specific wage rates. Payroll submittals will not be required.
B. Bidders on this Work will be subject to the applicable provisions of all federal rules, laws, and regulations or orders.
1.13 AMERICANS WITH DISABILITIES (ADA)
A. In compliance with Americans with Disabilities Act (ADA), the following information is provided: Contact person: Contact person: Debby Newton, Facilities Support Coordinator, Architecture and Construction Management Office, Phone: 801-535- 6224, Email: debby.newton@slc.gov. If assistance is required, please contact the above office at least 72 hours before the bid opening.
1.14 REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY
OFFICERS AND EMPLOYEES AND FORMER CITY OFFICERS AND
EMPLOYEES
A. A bid will not be accepted unless it contains the following representation.
THE BIDDER, OFFEROR, OR CONTRACTOR represents that it has not:
1. Provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or his or her relative or business entity.
2. Retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business.
3. Knowingly breached any of the ethical standards set forth in the City’s conflict of interest ordinance, Chapter 2.44, Salt Lake City Code; or
4. Knowingly influenced and hereby promises that it will not knowingly influence a City officer or employee or former City officer or employee to breach any of the ethical standards set forth in the City’s conflict of interest ordinance, Chapter 2.44, Salt Lake City Code.
1.15 AWARD
A. The Construction Contract will be awarded in compliance with Salt Lake City’s Value-
Based Procurement Program which takes into account certain factors in the Bidder’s work environment. For more information about this Program please read SLC Administrative Rules, Procurement Rules Chapter 19, (See document 00 22 18, Article
1.2 paragraph “A” for a link).
First Second Publication: October 11, 2026 Publication: October 18, 2026
00 11 16 - 4
Third Publication: October 25, 2026
Revised February 1, 2019 Instructions to Bidders
00 21 13 - 1
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.1 DEFINED TERMS
A. Terms used in the Bid Documents that are defined in Article 1.1 of the General Conditions will have the meanings indicated in the General Conditions.
B. General Conditions: as published in Document 00 72 00 in the current edition of the Manual of Standard Specifications by the Utah Chapter of the American Public Works Association.
1.2 COPIES OF BID DOCUMENTS
A. Bidders must use complete sets of Bid Documents in preparing Bids. OWNER and ENGINEER assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
B. Bid Documents are made available to Bidder only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given.
C. Bid Document copyrights shall remain with OWNER.
D. All provisions of the current edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association that are applicable to the Work are made a part of the Contract Documents by reference. Those publications are available on the web at http://utah.apwa.net.
E. Salt Lake City’s Department of Public Utilities has a document entitled “Standard Practices for Salt Lake City Public Utilities” (March 9, 2018 edition). The document is available from 1530 South West Temple, Salt Lake City, Utah.
1.3 PRE-BID CONFERENCE
A. Representatives of OWNER and ENGINEER will be present at a pre-bid conference to discuss the Project. Bidders are encouraged to attend and participate in the conference.
ENGINEER will transmit to all persons or agencies who have signed up to receive copies of the Bid Documents such Addenda as ENGINEER considers necessary in response to questions arising at the conference. The location and time of the conference are identified in the Invitation to Bid (Document 00 11 16).
1.4 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. In General: Bidders are permitted to converse with ENGINEER or ENGINEER's personnel having knowledge of the Project, Plans, Specifications, material sites, or conditions generally prevailing in the area of the Project to aid in pre-bid investigations.
OWNER is not bound by any statements or representations made by ENGINEER or ENGINEER's personnel before the Bid opening or award of the Construction Contract, nor for any assumptions or conclusions reached by a prospective Bidder as a result of such communication unless ENGINEER issues an Addendum to all prospective Bidders.
B. Access to Site: The lands upon which the Work is to be performed, and rights-of-way
00 21 13 - 2 and easements for access thereto and other lands designated for use by Bidder in performing the Work are identified in the Contract Documents. All additional off-site lands and access thereto required for temporary construction facilities or storage of materials and equipment must be provided by Bidder.
C. Contract Documents: The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 1.4; that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
D. Bidder's Obligations: The submission of a Bid constitutes acknowledgement that Bidder has complied with all bidding instructions. It is the responsibility of each bidder, before submitting a Bid, to:
1. Examine the Contract Documents thoroughly.
2. Visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work.
3. Consider federal, state, and local Laws and Regulations that may affect cost, progress, performance, or furnishing of the Work.
4. Study and carefully correlate Bidder's observations with the Contract Documents.
5. Identify and notify ENGINEER in writing of all specific conflicts, errors, or discrepancies in the Contract Documents, and of any doubts of Bidder about their meanings. The failure or omission of any Bidder to receive or examine any form, instrument, Addendum, or other document, visit the site and become acquainted with conditions there existing, or attend the pre-bid conference, shall in no way relieve any Bidder from obligations with respect to Bidder's Bid or to the Construction Contract.
E. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement (Document 00 52 00) and the Contract Documents, except by Addendum or Change Order.
1.5 PHYSICAL CONDITIONS
A. In General: Before submitting a Bid, each Bidder is responsible for review of OWNER's explorations, tests, and data concerning surface conditions, subsurface conditions, and Underground Facilities at or contiguous to the site, or otherwise, that may affect cost, progress, performance, or furnishing of the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.
B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in the Geotechnical Data (Document 00 31 32). That document provides the identification of:
1. Those reports of explorations and tests of subsurface conditions at the site that have been used by ENGINEER in preparing the Contract Documents; and
00 21 13 - 3
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) at or contiguous to the site that have been used by ENGINEER in preparing the Contract Documents.
C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities. OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in paragraph 4.3A.2 of the General Conditions or unless expressly provided in the Modifications to the General Conditions (Document 00 73 10).
D. Additional Explorations: On request in advance, and if possible, OWNER will provide to each Bidder access to the site to conduct any explorations and tests as each bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, and clean up and restore the site to its former condition upon completion of such explorations. Bidder shall indemnify and save OWNER harmless during and after the performance of additional explorations.
E. Modifications to the Contract Documents: Provisions concerning the adequacy of the data furnished for subsurface structures and underground facilities and the possibility of changes in the documents due to differing conditions appear in Articles 4.2 and 4.3 of the General Conditions.
PART 2 BIDDING PROCEDURES
2.1 INTERPRETATIONS AND ADDENDA
A. All requests for interpretation of the Contract Documents shall be made in writing and delivered to ENGINEER no later than (7) calendar days before the Bid opening. If required, ENGINEER will send a written interpretation to all persons receiving a set of Bid Documents in the form of a written Addendum. If ENGINEER doesn’t respond to a Bidder’s request for interpretation, Bidder shall not rely on any interpretation in the request that is contrary to the intent and terms of the Contract Documents.
B. OWNER will not be responsible for any explanations or interpretations, except those duly issued in the form of written Addendum.
C. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
ENGINEER.
D. Any Addendum so issued during the time of bidding shall be deemed to be included in the Bid. All Addenda shall become a part of the Contract Documents.
E. Except to cancel the Bid opening, no Addendum shall be issued within 48 hours before the Bid opening.
2.2 EQUIPMENT AND MATERIAL OPTIONS BEFORE OPENING
A. If a Bidder or Supplier wishes to use items of equipment or materials other than those identified in the Contract Documents, Bidder or Supplier shall submit a written request for approval to ENGINEER at least 10 days before the date set for the Bid opening.
00 21 13 - 4
B. The procedure for submission of any such request shall be as follows: submit 1) two sets of the written request and technical brochures and 2) a statement of variances. The statement of variances must list all features of the proposed substitution that differ from the Contract Documents and must further certify that the substitution has no other variant features. The brochure and information submitted must be clearly marked showing make, model, size, options, and any other features and must include sufficient evidence for ENGINEER to evaluate each feature listed as a variance. If after installing the substituted product, an unlisted variance is discovered, CONTRACTOR shall immediately replace the product with a specified product at no cost to OWNER.
C. Any approval of such a request by ENGINEER must be made not later than 48 hours before the Bid opening. ENGINEER's failure to approve by such time shall be deemed a denial of the request.
D. Any such approval is at the sole discretion of ENGINEER and will be in the form of an Addendum, issued to all Bidders holding Bid Documents, indicating that the additional equipment or materials are approved as equal to those specified for the Project.
2.3 BID SECURITY Delivery of Bid Security: Bidders must deliver Bid security to OWNER at the time they deliver their Bid. If Bid Security is not delivered with the Bid, the Bid will not be read or accepted
A. Delivery of Bid Security: Bidders must deliver Bid security to OWNER at the time they deliver their Bid. If Bid Security is not delivered with the Bid, the Bid will not be read or accepted.
B. Amount of Bid security: The Bid security amount must equal at least 5 percent of the total amount of the Bid. The total amount of the Bid shall be the sum of all items of the Bid, constituting the maximum amount of the possible award to the Bidder.
C. Bid Bond: If a Bidder submits a bid electronically using Bonfire, the Bid security must be an electronic or scanned Bid bond. OWNER will not accept an emailed or faxed Bid bond. If a Bidder submits a bid by U.S. mail or hand-delivery, the Bid security must be either a hard-copy original Bid bond or a hard-copy original cashier’s check. Electronic or scanned copies, photocopies, or faxes of the Bid bond or cashier’s check will not be accepted with hard-copy Bid submissions delivered in-person or by U.S. mail. The Bond must guarantee that the Bidder, if awarded the Work, will promptly enter into the Construction Contract to perform the Work in the manner required by the Contract Documents.
D. Cashier's Check: If a cashier's check is used, the cashier's check must be made payable to Salt Lake City Corporation. Personal or company checks will not be accepted.
E. Return of Bid Security: OWNER will return any hard-copy Bid securities to all Bidders by the earlier of 45 days after the date of the Bid opening and 7 days after the effective date of the Construction Contract. The liability of OWNER in regards to cashier’s checks shall be limited only to the return of the checks.
F. Default: If the Bidder fails, within the time limit described in Article 3.7A, to enter into the Construction Contract and to deliver to OWNER a Performance Bond, Payment Bond, or any other Bonds or documents required by the Contract Documents after Notice of
00 21 13 - 5
Intent to Award by OWNER, the Bidder shall forfeit the amount of the Bid security as liquidated damages to OWNER.
2.4 CONTRACT TIME AND PUNCH LIST TIME
A. Provisions concerning Contract Time and Punch List Time are set forth in the Agreement (Document 00 52 00).
2.5 LIQUIDATED DAMAGES
A. Provisions concerning liquidated damages are set forth in the Agreement (Document 00 52 00).
2.6 BID FORM
A. The Bid Form (Document 00 41 00) identifies all forms comprising the Bid Documents.
Additional copies may be obtained from ENGINEER.
B. All names must be typed or printed under or near the signature. The signature must be an original signature.
C. The Bid must contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid Form.
D. The Bidder's address, telephone number, and facsimile number for communications regarding the Bid must be shown on the first page of the Bid Form.
E. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use only the Bid Form and Bid Schedules bound in the Contract Documents (unless updated forms are included in an addendum, in which cause the Bidder shall use the updated forms).
F. OWNER may waive any failure to comply with the requirements of this paragraph 2.6 if OWNER determines that such failure (1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or (2) involves ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price.
2.7 BID SCHEDULE
A. Any work or material that is specified in the Contract Documents or that is necessary because of the nature of the Work, but that is not listed separately in the Bid Schedule (Document 00 43 00), shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.
B. All blanks on the Bid Schedule (Document 00 43 00) must be completed. If applicable, furnish both the unit and the total costs for each item. Numbers shall be stated in figures, and the signature of all persons signing shall be in longhand. Any corrections, alterations or erasures made by the Bidder to the information the Bidder entered on the Bid Schedule shall be initialed in ink by the Bidder. OWNER may waive any failure to comply with the requirements of this paragraph if OWNER determines that such failure (1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or (2) involves
00 21 13 - 6 ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price.
2.8 SUBMISSION OF BIDS
A. Bids shall be submitted at the time and place and in the manner indicated in the Invitation to Bid (Document 00 11 16). It is the sole responsibility of the Bidder to deliver the Bid before the scheduled time.
B. Alternate bids, other than those called for in the Bid form, will not be considered.
C. No oral, telegraphic, telephonic, facsimile, or modified bids will be considered. OWNER will not consider any attempted modification of a Bid written or made on the outside of the envelope containing the Bid.
2.9 MODIFICATIONS AND WITHDRAWAL OF BIDS
A. At any time before the Bid opening, Bids may be modified or withdrawn if a written notice of the modification or withdrawal, as the case may be, is signed by Bidder and delivered to the place where Bids are to be submitted.
B. Within two business days after Bids are opened, any Bidder may file written notice with OWNER that there was a substantial mistake made in the preparation of its Bid. Bidder must thereafter promptly demonstrate Bidder's mistake to the reasonable satisfaction of OWNER. If OWNER agrees, Bidder may withdraw its Bid, and the Bid security will be returned to Bidder.
2.10 OPENING OF BIDS
A. Bids will be opened and read aloud publicly unless obviously non-responsive. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids.
B. Any Bids received after the time specified in the Invitation to Bid (Document 00 11 16) will be returned unopened.
2.11 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS
A. Subject to Paragraph 2.3E hereof, Bids remain subject to acceptance for 45 days after the day of the Bid opening. OWNER may, in its sole discretion, release any Bid and return the Bid security before that date. OWNER and Bidder may agree to extend the 45-day deadline.
2.12 NONDISCRIMINATION IN EMPLOYMENT
A. Work under this Bid will obligate the Bidder and Subcontractors not to discriminate in employment practices.
B. Bidders must, if requested, submit a compliance report concerning employment practices and policies in order to maintain their eligibility to receive the award of the Construction Contract.
C. Equal opportunity employment shall be reflected in the racial and sexual composition of Bidder's work force and OWNER urges an affirmative action program to overcome under-
00 21 13 - 7 utilization.
D. Bidders are advised that the Construction Contract and its performance are subject to the applicable provisions of all Laws and Regulations. Bidder will be obligated, upon written request, to give all applicable assurances of compliance in connection therewith.
E. If federal nondiscrimination requirements are applicable, Bidder must be fully knowledgeable and comply with such requirements. Refer to Community Development Block Grant Supplementary Conditions (CDBG) (Document 00 73 12) or Federal Aviation Administration Supplementary Conditions as applicable.
2.13 SECTION 3, HOUSING AND URBAN DEVELOPMENT ACT OF 1968
A. If Work under this Bid is funded with a federal community development block grant the requirements of Section 3 of the Housing and Urban Development Act of 1968 may apply to the Bidder and its Subcontractors. OWNER encourages the use of the State of Utah Section 3 register for all subcontracting http://housing.utah.gov/section3/HUD Section 3.html.
B. Bidder will be obligated to give all applicable assurances of compliance in connection with this Section 2.13 at any time.
PART 3 AWARD OF CONSTRUCTION CONTRACT
3.1 QUALIFICATIONS OF BIDDERS
A. Within (7) calendar days after ENGINEER's request, a Bidder whose Bid is under consideration for award shall submit to ENGINEER any of the following information requested by ENGINEER. ENGINEER may request like information regarding Bidder's Subcontractors or Bidder's Suppliers.
1. A current financial statement for the Work (as provided to the bonding company);
2. A chronological list of "completed" construction work done by Bidder during the last 3 years, including project name, address, owner, contract name, and current telephone number;
3. Work Under Contract Report (Document 00 43 37);
4. The proposed organizational structure for the project: firm ownership, project manager, progress scheduler, and CONTRACTOR’s Resident Superintendent’s resume;
5. Owned and rented equipment that is to be used to do the Work;
6. Investigations, arbitrations, litigation, or claims that are pending, threatened, settled, or disposed of within the last 3 years;
7. Evidence of ability to perform and complete the Work in a manner and within the time limit specified. As a minimum, identify specific projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project
00 21 13 - 8 manager and Resident Superintendent designated to construct this project are different than that of Bidder, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;
8. Names of three (3) projects of similar size and nature that the Resident Superintendent has completed. Include the name, address, and telephone number of the office contracting for each project.
9. Information so OWNER’s Labor Relations Specialist can certify that Bidder has an acceptable Utilization Plan that offers economic opportunities to low and very low income persons and that Bidder qualifies as a Section 3 Contractor; and
10. Such other data as may be called for in the Supplementary Instructions to Bidders (Document 00 22 13) (if any).
B. OWNER will hold all requested information confidential and, upon request, shall return such information to Bidder after acceptance or rejection of Bidder’s Bid.
C. Untimely response by Bidder will release OWNER of any obligation to further negotiate or consider Bidder's Bid.
3.2 EVALUATION OF BIDS
A. OWNER reserves the right: (1) to reject any and all Bids; (2) to waive minor informalities in the Bid Schedule and elsewhere so long as the informalities (a) are not material to OWNER’s Bid Documents and process and do not render the Bid non-compliant with Laws and Regulation pertaining to bidding, or (b) involve ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price; (3) to negotiate and agree to contract terms with the successful Bidder; and (4) to disregard non-conform-ing, non-responsive, unbalanced, or conditional Bids.
B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or OWNER to make an award to that Bidder. Such rejection may be because the Bid is non-responsive, or Bidder is unqualified or of doubtful ability, or Bidder’s Resident Superintendent is unqualified or of doubtful ability, or the Bid or Bidder fails to meet any other pertinent standard or criteria established by OWNER in the Supplementary Instructions to Bidders (Document 00 22 13).
C. OWNER will consider the qualifications of Bidder and such alternates, prices, and other data as may be requested in the Bid Form (Document 00 41 00), Bid Schedule (Document 00 43 00), or written requests issued prior to OWNER's Notice of Intent to Award the Construction Contract. OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code. See Document 00 22 16 Supplementary Instructions to Bidders.
D. OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for portions of the Work as provided in the Proposed Subcontractor Form (Document 00 43 36). OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code. See Document 00 22 16 Supplementary Instructions to Bidders.
00 21 13 - 9
E. OWNER may consider the operating costs, maintenance requirements, performance data, and guarantees of materials and equipment when such data is required to be submitted prior to the Notice of Intent to Award the Construction Contract.
F. To establish qualifications of Bidder, OWNER may request such data indicated in Article
3.1 hereinabove and conduct such investigations as OWNER deems appropriate.
G. If the Construction Contract is to be awarded, it will be awarded to the most responsive and lowest, qualified, responsible Bidder as determined by OWNER. Alternates may be accepted depending upon availability of OWNER funds. Bid alternates will be considered in determining the most responsive, lowest, qualified, and responsible Bidder.
H. OWNER will evaluate Bid Schedules as follows:
1. OWNER will resolve discrepancies in the multiplication of quantities of Work items and unit prices in favor of the unit prices.
2. Prices written out in words shall govern over prices written out in numbers.
3. OWNER will resolve discrepancies between the indicated sum of any column of figures and the correct sum thereof in favor of the correct sum.
4. Bids shall not contain any recapitulations of or changes in the work to be done.
5. OWNER may accept a Bid despite obvious errors in a Bid Schedule, such as a failure to include unit prices or a misplaced decimal point, as long as OWNER reasonably can discern the intention of Bidder as to the amounts to be bid.
6. Owner has determined that in accordance with Section 3.24.115 of the Salt Lake City Code the health, safety, and general welfare of the citizens of Salt Lake City are reasonably furthered by Owner’s Building Improvement or Public Works Projects procurement code requirements.
3.3 BUILDING IMPROVEMENT OR PUBLIC WORKS PROJECTS
A. The Building Improvement or Public Works Projects procurement requirements are set forth in Salt Lake City Code Section 3.24.115 and can be found at the following web address: www.slcinfobase.com. To access the code, section select Ordinances, Policies & Procedures, General City; select City Code/American Legal; select Title 3, Revenue and Finance; select Chapter 3.24, Procurement; select Article III, Source Selection; select
3.24.115 Building Improvement or Public Works Projects.
B. Bidder shall submit with its bid the Qualified Health Insurance Coverage Form. In that form Bidder certifies that the information given is true as of the time of submitting its bid.
The information will be used in the manner stated in paragraph “F” below to evaluate “responsiveness” if bids are within 10% of each other. That form is used by Bidder to certify that Bidder and all subcontractors of Bidder with a subcontract value of $1,000,000 or more at the original execution of the subcontract working on the project have and will maintain, qualified health insurance coverage in compliance with Salt Lake City Code
3.24.115 for the duration of the contract. Neither the failure to submit that form nor checking “No” regarding Qualified Health Insurance Coverage will render the bid non-responsive.
C. Bidder shall submit with its bid the Work Environment Certification Form. In that form
00 21 13 - 10
Bidder certifies that the information given is true as of the time of submitting its bid. If “Yes” is not certified for each item 1 through 5, the bid will be rejected as non-responsive.
See Salt Lake City Code Section 3.24.115. That form is used by Bidder to certify that Bidder, and every subcontractor, if any, of Bidder working on the project have and will maintain 1) a drug and alcohol testing policy; 2) a program to recruit and/or employ veterans; 3) a job training program; 4) a safety program; and 5) a formal policy of non-discrimination in compliance with Salt Lake City Code Section 3.24.115 for the duration of the contract.
D. Owner reserves the right to review or audit any information provided by Bidder to make its evaluation. Bidder shall provide or furnish access to any necessary records or other information in order to permit Owner to verify Bidder’s and/or a subcontractor’s certifications. Bidder shall provide or furnish access to such records and information no later than three (3) business days after Owner issues a written request for the same.
E. The Building Improvement or Public Works Projects procurement requirements will only apply to contracts in the amount of $2,000,000 or more, as determined by the engineer’s estimate.
F. If more than one Bidder answers "Yes" on the Qualified Health Insurance Coverage Form, the following analysis will apply: A Bidder who certifies that it has and will maintain an offer of qualified health insurance coverage in compliance with the Building Improvement or Public Works Projects procurement requirements and whose bid is not more than 10 percent higher than the bid of any other offers who do not offer such insurance, will be deemed the more responsive Bidder. If two or more Bidders are judged to be equally responsive, Owner will make the award to the bidder with the lowest bid price. For purposes of this paragraph “F” references to “Bidder” with respect to qualified health insurance coverage shall be deemed to refer also to any subcontractors with a subcontract value of $1,000,000 or more at the original execution of the subcontract under such Bidder.
G. Qualified Health Insurance Coverage documentation for bidder and each subcontractor of bidder with a subcontract value of $1,000,000 or more which shall include the following two documents:
(i) An original statement on company letterhead signed by a duly authorized officer of the bidder/subcontractor stating that the bidder/subcontractor will maintain qualified health insurance coverage for the duration of the contract as defined in Section 26-40-115, Utah Code Annotated, as amended, or its successor in compliance with Salt Lake City Code 3.24.115.
(ii) A written statement of actuarial equivalency from either:
1. An actuary selected by the bidder/subcontractor or bidder’s/subcontractor’s health insurer; or
2. An underwriter who is responsible for developing the bidder’s/subcontractor’s health insurance premium rates.
3.4 SUBCONTRACTORS, SUPPLIERS AND OTHERS
A. Bidder shall not subcontract more than 75 percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's written approval.
B. Conflict of interest restrictions pertaining to Subcontractors are described in paragraph
00 21 13 - 11
6.5H of the General Conditions.
3.5 CONTRACT SECURITY AND OTHER SUBMITTALS
A. Performance Bond (Document 00 61 13) and Payment Bond (Document 00 61 14):
OWNER's requirements as to Performance and Payment Bonds are as set forth in the Modifications to General Conditions (Document 00 73 10). Specific requirements are set forth in the Performance Bond (Document 00 61 13) and the Payment Bond (Document 00 61 14).
1. Bidder should carefully examine the form of the Bonds.
2. When the successful Bidder delivers the executed Construction Contract to OWNER, it must be accompanied by the required Performance and Payment Bonds (using Documents 00 61 13 and 00 61 14, respectively).
B. Proposed Subcontractor Form (Document 00 43 36): Bidder must provide this report form to OWNER within 24 hours after ENGINEER's request. See Bid Form, paragraph 1.5B (Document 00 41 00) for additional information. The form shall list the name and address of each Subcontractor who will perform work or labor or render service to Bidder at the site of the Work, or a Subcontractor who, off the job site, will specially fabricate a portion of the Work or improvement according to detail Drawings. In each instance, the nature and extent of any Work to be subcontracted in an amount in excess of 2 percent of the Bid sum shall be described. Bidder must have the written consent of OWNER to substitute for any of the Subcontractors or Suppliers designated or to employ any Subcontractor or Supplier that is not listed.
C. Bidder Status Report (Document 00 43 38): Bidder must submit the completed form upon ENGINEER's request or after Bidder receives the Notice of Intent to Award.
D. Other Information: When a determination has been made to award the Construction Contract, Bidder is required, before the award or after the award, or both, to furnish such other information as ENGINEER requests.
3.6 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS
A. The Contract Price identified in the Agreement (Document 00 52 00) represents the Cost of the Work that is to be paid by OWNER to CONTRACTOR. Adjustments to the Contract Price that are agreed to between OWNER and the successful Bidder shall be affected by signing an Agreement Supplement.
3.7 SIGNING OF AGREEMENT
A. Within 10 days, (or such longer period of time that OWNER in its discretion may allow) after OWNER gives Notice of Intent to Award the Construction Contract to the successful Bidder, Bidder shall pick up, sign, and return the required number of copies of the Agreement (Document 00 52 00) and attached documents to OWNER with the required Bonds. A minimum of 2 originals will be signed. One executed original will be returned to Bidder.
B. Transfers, delegations, or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from OWNER.
00 21 13 - 12
C. At and from the time of Bidding through the completion of the Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, Salt Lake City and Salt Lake County.
PART 4 MISCELLANEOUS
4.1 EQUIPMENT AND MATERIAL OPTIONS AFTER BID OPENING
A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications, and any Addenda.
B. The procedure for submitting an application for substitution after the effective date of the Construction Contract is set forth in Article 6.4 of the General Conditions.
Revised Nov. 27, 2006 Supplementary Instructions to Bidders 00 22 13 - 1
DOCUMENT 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
Add the following paragraph to Article 3.3.
3.3 SUBCONTRACTOR, SUPPLIERS AND OTHERS
C. The following firms, that have been under contract to the OWNER in the design phase of the Work, shall not be used as subcontractors by the CONTRACTOR.
1. Design Consultant: EDA Architects .
2. Electrical Consultants: Resolut Group .
3. Mechanical Consultant: Resolut Group .
4. Other: .
5. Other: .
Add the following article to Part 4.
4.2 PARTNERING
A. Refer to Section 01 31 20 for description of partnering requirements.
B. OWNER's consultants listed in this project manual will be partners to the project.
Revised February 11, 2013 Supplementary Instruction (VP)
00 22 18 - 1
DOCUMENT 00 22 18
SUPPLEMENTARY INSTRUCTIONS (VP)
1.1 INTRODUCTION
A. OWNER has determined that it obtains better value from contracted services when certain practices enhance a Bidder’s work environment. OWNER has implemented a Value-Based Procurement Program (the “Value Program”) to obtain the benefit of those practices.
1.2 THE VALUE PROGRAM
A. The Value Program is as set forth in Salt Lake City Procurement Rules Chapter 19 and can be found at the following web address:
http://www.slcinfobase.com/PPAREO/default.htm#!WordDocuments/procurementcha pter19valuebasedprocurementprogram.htm.
B. Participation by a Bidder is voluntary. Failure to comply shall not render a bid non-responsive.
C. If Bidder fails to participate in the Value Program at the time of submitting a bid, OWNER shall consider such bid as though Bidder had no factors under the Value Program. In such a case,
1. Bidder will receive no benefits allowable under the Value Program;
2. Bidder will NOT be allowed to submit additional information related to the Value Program; and
3. Bidder waives any and all rights to raise a protest related to the Value Program.
D. If Bidder participates in the Value Program, Bidder shall provide the information shown in the Value Program Form (Document 00 43 40). In that form Bidder certifies that the information given is true as of the time of submitting its bid. The information will be used in the manner stated in the Value Program to evaluate “responsibility” if bids are close.
E. When the Value Program is applicable, the Program will only affect bids with an estimated value of $2,000,000 or less that fall within the following dollar range.
1. For contracts with an estimated value of $250,000 or less, the Value Program will apply to all bids or offers that fall within two (2) percent of the lowest amount submitted.
a. See 1.3 B of Document 00 41 00 to determine if the Engineer’s estimate is less than $250,000.00.
Revised February 11, 2013 Supplementary Instruction (VP)
00 22 18 - 2
2. For contracts with an estimated value of more than $250,000 but less than $1,000,000, the Value Program will apply to all bids or offers that fall within one-half (1/2) percent of the lowest amount submitted plus $5,000.
3. For contracts with an estimated value of $1,000,000 or more, the Value Program will apply to all bids or offers that fall within $10,000 of the lowest amount submitted.
F. An award, if any, will be made in accordance with Salt Lake City Procurement Rules, Chapter 19. In general terms, Chapter 19 may apply based on the amount bid and other factors. If the Value Program applies, OWNER will first consider all matters relating to responsiveness and responsibility except the Value Program. OWNER will then further evaluate responsibility under the Value Program and will award the Contract to the Bidder who demonstrates the most points among the following factors.
If two or more bidders have the same number of points, the award will be made to the bidder with the lowest bid price.
Policy of nondiscrimination 1/2 point
Sponsorship of state-compliant apprenticeship programs(s) 1/2 point
Use of a pre-employment and “for cause” drug testing program 1/2 point
Local small business 1/2 point
1. OWNER reserves the right to review or audit any information provided by Bidder to make its evaluation.
2. Bidder shall provide or furnish access to any necessary records or other information in order to permit OWNER to verify these…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .