2.2.1. RFP Attachment 4 - Attachment_Deficiency Report.pdf

PDF 282 KB Posted

Attached to
El Paso Janitorial and Grounds Services
Solicitation number
70B03C20R00000037
Issued by

About this file

This document contains a contract deficiency report template. The template includes sections for identifying the contract and deficiency number, describing the discrepancy or problem in detail with reference to the performance work statement or directive, obtaining the contracting officer's signature, providing the contractor's response and corrective actions to address and prevent recurrence along with the contractor representative's signature and date, and areas for the government's evaluation and any resulting actions such as reduced payment, cure notice, or show cause notice.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

460 © Management Concepts. See inside front cover for additional details.

3. To:

Acme Motor Company

Mr. Bob Smith

4. From: (Name of QAE)

TSgt Jones

5. Dates

Prepared 28 Mar 20X2 Returned by Contractor Action Completed

6. Discrepancy or Problem: (Describe in detail; include reference to PWS Directive; attach continuation sheet if necessary.)

There have been 20 unscheduled bus requirements during this quarterly surveillance period (Jan X2 Mar X2). On four of the requirements, the contractor did not arrive within four minutes of the agreed time as required by 5.2.2. and PRS item 3. On all four occasions, he arrived over 10 minutes late. The minimum acceptable performance requirement is 85%; therefore, the requirement was performed unsatisfactorily since only 3 noncompliances are allowed.

7. Signature of Contracting Officer

8. To: (Contracting Officer) From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence; Attach continuation sheet if necessary. (Cite applicable Q.C. program procedures or new Q.C. procedures)

10. Signature of Contractor Representative Date

11. Government Evaluation (Acceptance, partial acceptance, rejection; attach continuation sheet if necessary)

12. Government Actions (Reduced payment, cure notice, show cause, other)