2.1718_Seaholm ASD Classroom G003_Addendum 1 ptA_051718.pdf
PDF 3 MB Posted
- Attached to
- 2. 1718_Seaholm ASD Classroom G003 Remodel
- Solicitation number
- RFP-BPS-180000002473-2
- Issued by
- Michigan
About this file
This is an Addendum #1 containing pre-bid meeting minutes for Birmingham Public Schools' Seaholm ASD Classroom G003 Remodel project (Job #2.1718). The project involves architectural, mechanical and electrical remodeling of Seaholm High School classroom #G003 to convert a temporary special needs accommodations room into a permanent ASD classroom, including relocating sprinkler heads and installing ceiling tiles with fire protection. The pre-bid meeting was held on May 16, 2018 at 2:00 PM, with proposals due May 24, 2018 at 1:00 PM local time. Questions were due by May 17, 2018 at 5:00 PM. The project timeline indicates room clearance by June 18, 2018 with work to commence after that date and a preferred project end date of July 31, 2018.
The document includes a comprehensive State of Michigan prevailing wage rate schedule for Oakland County that contractors must follow, covering various construction trades. Key clarifications provided include: the warranty period is one year (reduced from initial 10-year requirement), the fume hood will be capped above ceiling height, and contractors are responsible for protecting existing carpet during construction. The District's AV/IT department will handle AV requirements, with only basic speaker and wiring work needed from the electrical contractor. The project requires contractors to register online to receive updates and addendums through specified websites.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .