2--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- SLCo FAC133003 ECC Server Room HVAC - CONST
- Solicitation number
- SLCo FAC133003 ECC Server Room HVAC - CONST
- Issued by
- Utah
About this file
This is a Schedule of Values document for a construction project in Utah involving the upgrading of HVAC systems within a facilities server room (Project FAC133003). The document provides a template for bidders to submit their pricing across multiple bid categories, including Payment & Performance Bond, Insurance & Builder's Risk, Division 01-General Conditions, and additional line items organized by division of work. The schedule accommodates a base bid and three alternate bids (Alternate 1, Alternate B, and Alternate C), allowing bidders to propose pricing for the core project scope as well as optional work components. The project aims to add additional cooling and conditioning capacity to improve server life expectancy and establish redundancy in case of HVAC system failure.
The Schedule of Values requires that all pricing submitted match the totals entered into the Online Solicitation System (OSS) for both the base bid and each alternate bid. The document is designed as a blank template with all line items currently showing zero dollar amounts, indicating that bidders must populate their proposed costs during the bid submission process. The format requires bidders to identify their company name and distribute costs across the specified divisions of work, with final totals calculated for entry into the OSS system.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: FAC133003 ECC Server Room HVAC | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | ||||
| (Specify entire work scope; examples are listed below) | Alternate 1 | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .