This document comprises the engineering drawings and specifications issued for bid by Lindon City for the construction of a new drinking water well pump house (Well House #5) in June 2026. The project scope includes a masonry structure with an asphalt shingle roof, a 2,500 GPM vertical turbine well pump with a 400 HP motor, associated piping, valves, flow meter, gas chlorination system, pump-to-waste and discharge piping, HVAC systems, electrical systems, control panels, sitework including grading and concrete pavement, site restoration, and fencing. A mandatory site visit is scheduled for Tuesday, June 30, 2026, at 2:30 p.m. at Lindon City Public Works. Bids are due July 21, 2026. The contract will be awarded to a single qualified vendor based on cost, approach to work, schedule, experience, and references. The drawings include civil site plans with grading and coordinates, structural details with masonry and foundation specifications, architectural elevations and details, mechanical/HVAC plans with equipment schedules showing Mitsubishi split-system units and related components, electrical one-line diagrams and power plans, and plumbing details with equipment specifications.
The drawings were prepared by licensed professional engineers Jacob K. Nielsen (State of Utah Professional Engineer No. 11762590-2202) and Matthew James (State of Utah Licensed Professional Engineer No. 14271529-2202) under NIG Screene engineering services and are designated as issued for bid as of June 22, 2026. The document includes comprehensive engineering symbols, legends, abbreviations, schedules for HVAC equipment including electric unit heaters, inline fans, and intake louvers, as well as detailed specifications for materials, installation standards, quality assurance requirements for masonry and concrete construction, special inspection protocols, and commissioning checklists. The drawings reference compliance with IBC 2024, SMACNA standards, ACI 318 standards, and various other applicable codes and standards for construction execution and inspection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-2026 06 22 Lindon Well House 5 Specs Issued for Bid.pdf | ||
| 1-Vendor Prerequisites - IFB Agency.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIG SREENE
PROJECT
LOCATION
CITY OF LINDON
WELL HOUSE #5
JUNE 2026
ISSUED FOR BID
JACOB K.
NIELSEN
No. 11762590-2202
STATE OF UTAH
PR
OFESS I ONAL ENGINEER6/22/2026
14271529-2202
MATTHEW
JAMES
L
IC
E N
S
ED
PROFESS IONAL
EN
G
I N E
E R
STA T E OF UTA H
2026.06.22
JACOB K.
S TA T E O F U TAH
OFESS I ONAL ENGI NEER6/22/2026
OFESS I ONAL ENGINEER6/22/2026
4 00
OX
NIG SREENE
JACOB K.
4 00
OX
NIG SREENE
JACOB K.
A B C
JACOB K.
8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W 8-W
C -T
V- U
G C
-T V-
U G
C-TV-UG C-TV-UG C-TV-UG C-TV-UG C-TV-UG C-TV-UG C-TV-UG
2-G 2-G 2-G 2-G
2- G
2- G
2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G 2-G
2-G 2-G
2- G
15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD 15-SD
8- W
8- W
15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR
IR
R
IR
R
IR
R
X X
X X
X X
X X
X X
SD
W
W LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG
TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC
LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOGTBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC
-S
D
P- U
G P-
U G
P- U
G P-
U G
P- U
G P-
U G
P-
UG
P-
UG
P-
UG
P-
UG
P-
UG
P-
UG
P-
UG
P-UG P-UG P-UG P-UG
P- U
G P-
U G
P-UG P-UG P-UG P-UG P-UG P-UG P-UG
P- U
G
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI
4 5
6 7 8
SITE COORDINATES
POINT # NORTHING EASTING DESCRIPTION
NIG SREENE
JACOB K.
C-TV-UG
C -T
V- U
G C
-T V-
U G
2-G
2- G
2- G
15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR 15-IRR
X X
X X
X X
X X
X X
SD
LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG LOG
TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC
P- U
G P-
U G
P- U
G P-
U G
P- U
G P-
U G
P- U
G
P-
UG
P-
UG
P-
UG
P-
UG
P-
UG
P-
UG
P-UG
P-UG P-UG P-UG P-UG P-UG P-UG P-UG P-UG P-UG
P- U
G P-
U G
2-G
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
-IR
R
6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI 6-PI
G B
G B
G B
G B
R
GB
2 3
11121314151617181920
313233
37383940
41 42
GRADING AND PAVING COORDINATES
POINT # NORTHING EASTING ELEVATION DESCRIPTION
NIG SREENE
JACOB K.
OFESS I ONAL ENGI NEER6/22/2026
Saw-cut driveway approach
1. GENERAL
A. The drawing shows sawing off and removing a curb for the construction of a new driveway approach. Additional requirements are specified in Plan 215 or Plan 221 for constructing driveway approach after curb is removed.
B. The slope of the right flare is required if a pedestrian access route abuts the curb.
The slope of the left flare is required if a pedestrian access rout DOES NOT abut the curb.
C. Variance from specified slopes must be acceptable to the ENGINEER.
2. PRODUCT
A. Water repellant: Penetrating compound, APWA Section 07 19 00.
B. Expansion Joint Filler: 1/2-inch thick type F1 full depth, APWA Section 32 13 73..
3. EXECUTION
A. At the apron, cut the curb off so the slope of the curb cut as measured perpendicular to the flow line is 16.67 percent (1:6). Unless specified otherwise, make the curb cut intersect the flow line.
B. At the flare, cut the curb off so the slope of curb cut as measured parallel to the flow line is as follows.
1) 8.33 percent (1:12) if curb borders a surface used by pedestrians.
2) 16.67 percent (1:6) if curb does not border a surface used by pedestrians.
C. No over-cutting where cuts merge. Grind sawed surface so no blade marks remain.
D. Water proofing. Apply full coverage water repellant over cut concrete.
E. Expansion Joint: Vertical, full depth, with top of filler set flush with concrete surface.
LEVELS 1, 2 AND 3 QUALITY ASSURANCE OF MASONRY (TMS 602-16 TABLE 3)
MINIMUM VERIFICATION
REQUIRED FOR
QUALITY ASSURANCE(a)
REFERENCE
FOR CRITERIA
PRIOR TO CONSTRUCTION, VERIFICATION OF COMPLIANCE OF SUBMITTALS. R
LEVEL 1 LEVEL 2 LEVEL 3 TMS 602
ART. 1.5
PRIOR TO CONSTRUCTION, VERIFICATION OF f'm and f'AAC, EXCEPT WHERE
SPECIFICALLY EXEMPTED BY THE CODE. R ART. 1.4 B
DURING CONSTRUCTION, VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX
(VSI) WHEN SELF-CONSOLIDATING GROUT IS DELIVERED TO THE PROJECT SITE. R ART. 1.5 & 1.6.3
RDURING CONSTRUCTION, VERIFICATION OF f'm and f'AAC, FOR EVERY 5,000 SQ. FT.
(465 SQ.M). ART. 1.4 B
R ART. 1.4 B
DURING CONSTRUCTION, VERIFICATION OF PROPORTIONS OF MATERIALS AS
DELIVERED TO THE PROJECT SITE FOR PREMIXED OR PREBLENDED MORTAR,
PRESTRESSING GROUT, AND GROUST OTHER THAN SELF-CONSOLIDATION GROUT.
(a) R = REQUIRED, NR = NOT REQUIRED
N O
T
AP
PL
IC
AB
LE
N O
T
AP
PL
IC
AB
LE
LEVELS 3 FOR RISK CATEGORY IV QUALITY ASSURANCE OF MASONRY (TMS 402 TABLE 3.1)
FREQUENCY (a) REFERENCE OF CRITERIA
CONTINUOUS PERIODIC TMS 402 TMS 602
INSPECTION TASK
AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING
ARE IN COMPLIANCE.
1.
PROPORTIONS OF SITE-PREPARED MORTAR.a.Y X--- --- ART. 2.1, 2.6 A & 2.6 C
SPECIAL
INSPECTION
REQUIRED
Y/N
GRADE, TYPE AND SIZE OF REINFORCEMENT, CONNECTORS, ANCHOR
BOLTS AND PRESTRESSING TENDONS AND ANCHORAGES.
c.Y X--- --- ART. 2.4 A, D-L
Y
Y
PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY.e. ---X ART. 2.1
DC.1
SAMPLE PANEL CONSTRUCTION.f. ---X ART. 1.6 D---
PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE.2.
GROUT SPACE.a.Y --- ART. 3.2 D, & 3.2 F---X
PLACEMENT OF REINFORCEMENT, CONNECTORS AND ANCHOR BOLTS.c.Y ---X SEC. 6.1, 6.3.1, 6.3.6, 6.3.7
ART. 3.2 E
& 3.4
VERIFY COMPLIANCE OF THE FOLLOWING DURING CONSTRUCTION.3.
MATERIALS AND PROCEDURES WITH THE APPROVED SUBMITTALS.a.Y X--- --- ART. 1.5
PLACEMENT OF MASONRY UNITS AND MORTAR JOINT CONSTRUCTION.b.Y X--- --- ART. 3.3 B
SIZE AND LOCATION OF STRUCTURAL MEMBERS.c.Y X--- --- ART. 3.3 G
TYPE, SIZE AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF
ANCHORAGE OF MASONRY TO STRUCTURAL MEMBERS, FRAMES OR OTHER
CONSTRUCTION.
d.
Y X--- ---SEC. 1.2.1(e),
6.2.1 & 6.3.1
WELDING REINFORCEMENT.g.Y ---X SEC. 6.1.7.3 ---
PREPARATION, CONSTRUCTION AND PROTECTION OF MASONRY DURING
COLD WEATHER (TEMP BELOW 40F) OR HOT WEATHER (TEMP ABOVE 90F).
h.Y X--- --- ART. 1.8 C & 1.8 D
PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED
MORTAR JOINTS.
l.Y ---X --- ART. 3.3 B.8 & 3.3 G.1.b
OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR SPECIMENS
AND/OR PRISMS.
4.Y X ------
ART. 1.4 B.2.a.3,
1.4 B.2.b.3,
1.4 b.2.c.3,
1.4 B.3, 1.4 B.4
FREQUENCY REFERS TO THE FREQUENCY OF SPECIAL INSPECTIONS, WHICH MAY BE CONTINUOUS DURING THE TASK LISTED OR
PERIODIC DURING THE LISTED TASK, AS DEFINED IN THE TABLE.
(a)
REQUIRED FOR THE FIRST 5000 SQUARE FEET OF AAC MASONRY.(b)
REQUIRED AFTER THE FIRST 5000 SQUARE FEET OF AAC MASONRY.(c)
REQUIRED AFTER THE FIRST10% OF EACH DIFFERENT TYPE OF ANCHOR AND/OR INSTALLER.(d)
REQUIRED FOR THE REMAINING 90% OF EACH DIFFERENT TYPE OF ANCHOR AND/OR INSTALLER.(e)
GRADE AND SIZE PRESTRESSING TENDONS AND ANCHORAGES.b.N X--- --- ART. 2.4 B,
2.4 M & 2.4 N
PRESTRESSING TECHNIQUE.d.N X--- --- ART. 3.6 B
PLACEMENT OF PRESTRESSING TENDONS AND ANCHORAGES.b.N X---
PROPORTIONS OF SITE-PREPARED GROUT AND PRESTRESSING GROUT
FOR BONDED TENDONS.
d.Y X--- ---
ART. 3.6
ART. 2.6 B,
& 2.4 M.1.b
SEC. 10.8
& 10.9 e.Y
Y
TYPE, SIZE AND LOCATION OF VENEER TIES AND MOVEMENT JOINTS.
f. INSTALLATION OF ADHERED VENEER.
---X ---
---X ---
---X ---
Y
N
N i. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE.
j. PLACEMENT OF GROUT.
k. PLACEMENT OF PRESTRESSING GROUT FOR BONDED TENDONS.
ART. 3.4 D
ART. 3.3 D
ART. 3.6 B
ART. 3.6 C
ART. 3.5
SEC. 13.2
SEC. 13.3
NIG SREENE
SPECIAL INSPECTIONS AND TESTS OF SOILS (IBC 2024)
VERIFICATION AND INSPECTION TASK
SPECIAL
INSPECTION
REQUIRED
Y/N
FREQUENCY OF INSPECTION REFERENCE
OF CRITERIA
CONTINUOUS
DURING TASK
LISTED
PERIODICALLY
DURING TASK
LISTED
IBC SECTION
Y VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE
THE DESIGN BEARING CAPACITY.
1. --- X 1705.6
VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL.
2.
PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.3.
DURING FILL PLACEMENT, VERIFY PROPER USE OF MATERIALS AND PROCEDURES IN
ACCORDANCE WITH THE PROVISIONS OF THE APPROVED GEOTECHNICAL REPORT.
VERIFY DENSITIES AND LIFT THICKNESS DURING PLACEMENT AND COMPACTION OF
COMPACTED FILL.
4.
--- X 1705.6
--- X 1705.6
X --- 1705.6
Y
Y
Y
PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY
THAT THE SITE HAS BEEN PREPARED PROPERLY.
5. --- X 1705.6Y
WOOD CONSTRUCTION (2024 IBC)
VERIFICATION AND INSPECTION TASK
SPECIAL
INSPECTION
REQUIRED
Y/N
FREQUENCY OF INSPECTION REFERENCE
OF CRITERIA
CONTINUOUS
DURING TASK
LISTED
PERIODICALLY
DURING TASK
LISTED
IBC SECTION
Y VERIFY FABRICATION / QC PROCEDURES OF STRUCTURAL, LOAD-BEARING OR LATERAL
LOAD-RESISTING MEMBERS OR ASSEMBLIES. IN-PLANT INSPECTION OF FABRICATION /
QUALITY CONTROL PROCEDURES OR SUBMIT CERTIFICATE OF COMPLIANCE..
1. 1704.2.5, 1704.2.5.1
INSPECTION OF TEMPORARY RESTRAINT/BRACING HAS BEEN INSTALLED PER THE
TRUSS MANUFACTURER'S SUBMITIAL PACKAGE FOR WOOD TRUSSES WITH CLEAR
SPAN OF 60 FEET OR GREATER.
2.
- X
1705.5.2
INSPECTION OF WOOD SHEAR WALL AND DIAPHRAGM NAILING AND EDGE MEMBER
DIMENSIONS, FASTENER SIZES AND SPACING, DRAG STRUTS, BRACES, HOLD-DOWNS,
BOLTING AND ANCHORING (EXCEPT FOR ANY SHEAR-WALL OR DIAPHRAGMS WITH
NAILING MORE THAN 4-INCHES ON CENTER).
3.
Y
- X
- X
N 1705.5.1
SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION (2024 IBC)
TYPE
SPECIAL
INSPECTION
REQUIRED
Y/N
CONTINUOUS
SPECIAL
INSPECTION
REFERENCE
STANDARD (A)
PERIODIC
SPECIAL
INSPECTION
IBC
REFERENCE
Y INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS,
AND VERIFY PLACEMENT.
1. X---
ACI 318 CH. 20,
25.2, 25.3, 26.6.1-26.6.3
REINFORCING BAR WELDING:2.
VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN
ASTM A 706.
a.Y X---
INSPECT WELDING OF REINFORCEMENT FOR SPECIAL MONENT
FRAMES, BOUNDERY ELEMENTS OF SPECIAL STRUCTURAL WALLS AND
COUPLING BEAMS.
b.Y X
INSPECT WELDED REINFORCEMENT SPLICES.c.Y ---X
AWS D1.4
ACI 318: 26.13.1.4
INSPECT ANCHORS CAST IN CONCRETE.3.
Y
X--- ACI 318:
26.13.3.3 ---
VERIFY USE OF REQUIRED DESIGN MIX.5.Y X---
ACI 318 CH. 19,
26.4.3, 26.4.4 1904.1, 1904.2
Y
PRIOR TO CONCRETE PLACEMENT, FABRICATION SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS,
AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
6.
X ---
ASTM C31
ASTM C172
ACI 318: 26.5,
26.12
Y INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER
APPLICATION TECHNIQUES.
7. ---X ACI 318: 26.5 ---
Y VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
TECHNIQUES.
8. ACI 318:
26.5.3-26.5.5 ---X---
N
INSPECT PRE-STRESSED CONCRETE FOR:9.
INSPECT WELDING OF PRIMARY TENSION
REINFOREMENT IN CORBELS.
d.N ---X --- ---
INSPECT SINGLE-PASS FILLET WELDS,
MAXIMUM 5/16".
e.Y X ---
INSPECT ALL OTHER WELDSf.Y --- X ---
--- AWS D1.4
ACI 318: 26.13.3
AWS D1.4
ACI 318: 26.13.3
AWS D1.4
ACI 318: 26.13.3
ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSIONS LOADS
a.Y X --- ACI 318, 26.13.3.2
INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS (B):4.
Y
MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.a ACI 318 , 26.13.3
b. X---
N INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.10. ACI 318: 26.9 ---X---
APPLICATION OF PRESTRESSING FORCES.a.N X --- ACI 318: 26.10
GROUTING OF BONDED PRESTRESSING TENDONS ACI 318: 26.10b. X ---
NOTE: ITEMS 11 AND 12 FROM IBC TABLE 1705.3 NOT REQUIRED.
Y VERIFY IN-SITU CONCRETE STRENGTH PRIOR TO STRESSING OF
TENDONS IN POST TENSIONED CONCRETE AND PRIOR TO REMOVAL OF
SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS.
13. ACI 318: 26.11.2 ---X---
Y INSPECT FORM-WORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
14. ACI 318:
26.11.1.2(b)
---X---
WHERE APPLICABLE, SEE SECTION 1705.13(A)
SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 26.13 IN ACI 318, OR OTHER QUALIFICATION PROCEDURE. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL
PRIOR TO THE COMMENCEMENT OF THE WORK.
(B)
/ / 26196
Sheet List Table
Sheet Number Sheet Title
E1.0 LEGEND
E1.1 TABLES
E2.0 SCHEDULES
E3.0 POWER ONE-LINE DIAGRAM
E3.1 INST AND CONTROL ONE-LINE DIAGRAM
E3.2 TYPICAL VFD CONTROL DIAGRAM
E3.3 CP-1 TYPICAL DIAGRAMS, SHEET 1
E3.4 CP-1 TYPICAL DIAGRAMS, SHEET 2
E3.5 DIAGRAMS
E4.0 SITE PLAN
E4.1 POWER PLAN
E4.2 INSTRUMENTATION AND CONTROL PLAN
E4.3 LIGHTING PLAN
E4.4 HVAC POWER PLAN
E4.5 SECURITY PLAN
E5.0 MAIN CONTROL PANEL ARRANGEMENT
E5.1 SMALL MOTOR CONTROL PANEL
E6.0 DETAILS, SHEET 1
E6.1 DETAILS, SHEET 2
E6.3 DETAILS, SHEET 3
E7.1 MODEL ENERGY CODE, SHEET 1
E7.2 MODEL ENERGY CODE, SHEET 2
x12 12 x22 22 x12 12 x14 6 x14 6
∅12 x22 22
- SLOTS3 1"
48" 400
X12 12
∅12
X12 12 X8 8
X12 12 ∅8
X12 12 ∅8
M1.1
M3.1
F
FS
S
M
BD
LEGEND OF HVAC/PLUMBING SYMBOLS AND ABBREVIATIONS
RD
RDO
WC-1
PS
C
GPM
SD
DN
LPC
HPC
MPC
LPS
MPS
HPS
V
G
MU
CHWS
(E)name
CHWR
CS
CR
HWR
HWS
GHR
LPG
(NAME)
G(NAME)
HG
RS
S
RL
LB/HR.
A
GPM
UP
RW
RPBP
DN
E
T
S
S
WCO
FCO
VTR
E
MECHANICAL GENERAL NOTES
1. DUCT DIMENSIONS SHOWN REPRESENT INSIDE DUCT DIMENSIONS.
2. ALL EXTERIOR DUCTWORK TO BE CONCENTRIC WITH A MINIMUM OF R-8
INSULATION BETWEEN THE INNER AND OUTER DUCT.
3. ALL INTERIOR RECTANGULAR DUCTWORK TO BE LINED WITH 1/2" LINER
WHERE CODE REQUIRED. DUCT DIMENSIONS ARE TO ACCOUNT FOR
INSULATION.
4. GAS PIPING IS BY THE PLUMBING CONTRACTOR.
5. THE SHEET METAL DUCT WORK SHALL BE GALVANIZED STEEL, PER SMACNA
STANDARDS, AND BE FABRICATED & INSTALLED IN ACCORDANCE WITH THE
LATEST SMACNA DUCT STANDARD EDITION.
6. COORDINATE THE HVAC SYSTEM, DUCT WORK, AND DIFFUSERS/GRILLES
WITH THE OTHER TRADES AND THE REFLECTED CEILING PLAN.
7. THE MECHANICAL CONTRACTOR SHALL PERFORM THE NECESSARY
TESTING, ADJUSTING, AND BALANCING OF THE HVAC EQUIPMENT AND
SYSTEM.
8. PRIOR TO FINAL INSPECTION OR ACCEPTANCE, FULLY INSTRUCT THE
OWNERS DESIGNATED OPERATION & MAINTENANCE PERSONNEL IN
OPERATION, ADJUSTING, AND MAINTAINING THE PRODUCTS, EQUIPMENT,
OR SYSTEMS.
9. THE INSTALLATION OF THE HVAC SYSTEM SHALL COMPLY WITHTHE LATEST
SMACNA, ACCA, UBC, IMC, AND IPS CODES BEING ENFORCED BY THE LOCAL
STATE OR CITY WHERE IN THE STRUCTURE IS BEING BUILT.
10. INSTALL ALL EQUIPMENT WITH PROPER CLEARANCE.
11. SMOKE DAMPERS SHALL BE LISTED UL555S AND BE CONTROLLED BY
AUTOMATIC SMOKE DETECTION.
12. PENETRATION OF A SMOKE BARRIER SHALL BE PROVIDED WITH AN
APPROVED FIRE/SMOKE STOP SYSTEM OF A MINIMUM OF 1 HOUR FIRE
RATED MATERIALS WHICH HAVE BEEN TESTED BY THE AMERICAN SOCIETY
OF TESTING MATERIALS (ASTM) E 814.
13. ENVIRONMENTAL AIR DUCTS THAT PENETRATE A FIRE RATED ASSEMBLY
SHALL BE PROVIDED WITH FIRE DAMPERS WHICH ARE LABELED UL 555 AND
LABELED A FIRE RATING WHICH IS 3/4 OF THE HOUR OF THE FIRE RATED
ASSEMBLY PENETRATED.
14. THE CONTRACTOR SHALL SUBMIT PLANS AND CALCULATIONS FOR SEISMIC
BRACING WHERE REQUIRED BY CODE.
15. ALL DUCTWORK SIZED BY THE EQUAL FRICTION METHOD.
HOSE VALVE
FLOW SWITCH
ROOF DRAIN
WALL CLEAN-OUT
ROOF DRAIN OVERFLOW
FLOOR CLEAN-OUT OR
VENT THRU ROOF
CLEAN-OUT TO GRADE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC RECIRCULATING HOT WATER
SEWER (BELOW GRADE)
VENT (SEWER)
PLUMBING FIXTURE CALLOUT
SEWER (ABOVE GRADE)
FLOW SWITCH
PRESSURE SWITCH
CHECK VALVE
MOTOR OPERATED BUTTERFLY VALVE
GAS COCK
RELIEF VALVE
GATE VALVE
ATC VALVE - 2 WAY
GLOBE VALVE
CALIBRATED BALANCING VALVE
FLOW CONTROL VALVE
ATC VALVE - 3 WAY
SHUT-OFF COCK FOR USE WITH
PRESSURE GAUGE
PRESSURE REDUCING, EXTERNAL PRESSURE VALVE
PRESSURE REDUCING, SELF CONTAINED VALVE
PUMP
45° ELBOW
90° ELBOW
FLOW METER
FLEXIBLE CONNECTION
REDUCER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
B=BUCKET, T=THERMOSTATIC
LEADER INDICATES DOWNWARD SLOPE
PIPE OUT OF PLANE
PIPE INTO PLANE
DUCT SMOKE DETECTOR
THERMOMETER 0-100°F
STEAM TRAP, F&T=FLOAT & THERMOSTATIC
ARROW INDICATES DIRECTION OF FLOW IN PIPE
PIPE BRANCH - OUT OF PLANE
PIPE BRANCH - IN PLANE
PIPE BRANCH - IN TO PLANE
HIGH PRESSURE CONDENSATE
MEDIUM PRESSURE CONDENSATE
LOW PRESSURE CONDENSATE
1-WAY BLOW PATTERN
4-WAY BLOW PATTERN
3-WAY BLOW PATTERN
2-WAY BLOW PATTERN
2-WAY BLOW PATTERN
PUMPED CONDENSATE
CHILLED WATER SUPPLY
EXISTING PIPING
MAKE UP WATER
NATURAL GAS
LOW PRESSURE STEAM
HIGH PRESSURE STEAM
MEDIUM PRESSURE STEAM
VACUUM
SUPPLY AIR DUCT - RISE
SUPPLY AIR DUCT - DROP
RETURN AIR DUCT - RISE
ROUND DUCT - RISE
UNDER FLOOR DUCT
TURNING VANES
ROUND DUCT - DROP
RETURN AIR DUCT - DROP
FRESH AIR LOUVER
RELIEF AIR OR EXHAUST AIR LOUVER
CEILING RETURN REGISTER
SIDEWALL SUPPLY REGISTER
CEILING SUPPLY DIFFUSER
EXISTING PIPING TO BE REMOVED
HEATING HOT WATER RETURN
GLYCOL HEAT RECOVERY PIPING
GLYCOL PIPING SOLUTION
LIQUIFIED PETROLEUM GAS
HEATING HOT WATER SUPPLY
CHILLED WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
PRESSURE GAUGE WITH SHUT-OFF COCK
PRESSURE GAUGE WITH PIGTAIL
FLANGE
DEMOLITION
ALIGNMENT GUIDE
SOLENOID VALVE
EXPANSION JOINT
REFRIGERANT SUCTION
HOT GAS
REFRIGERANT LIQUID
FLEXIBLE DUCT
FLEXIBLE DUCT CONNECTION
INCLINED RISE
R/W=1. ROUND DUCT SIMILAR TO RECTANGULAR
MANUAL VOLUME DAMPER
SMOKE DAMPER W/ ACCESS PANEL
RECTANGULAR TO ROUND DUCT TRANSFORMATION
FIRE DAMPER IN DUCT, W/ ACCESS PANEL REQD.
INCLINED DROP
FLOW METER ORIFICE
AIR VENT-MANUAL
AIR VENT-AUTO
UNION
ATC DAMPER/MOTORIZED DAMPER
ACCESS PANEL
COMBINATION FIRE/SMOKE DAMPER W/
ACCESS PANEL
RECTANGULAR TO RECTANGULAR OR ROUND TO ROUND
DUCT TRANSFORMATION MAXIMUM 15° INCLUDED ANGLE
EXCEPT WHERE SHOWN OTHERWISE.
WITH RESPECT TO AIR FLOW
15° NOMINAL INCLINE WITH
RADIUS TURNS=DEPTH OF
DUCT.
ROUND DUCT WITH NET INSIDE
DIMENSIONS SHOWN IN INCHES.
RECTANGULAR DUCT WITH NET
INSIDE DIMENSIONS SHOWN IN
INCHES.
LINEAR DIFFUSER WITH PLENUM AND FLEXIBLE DUCT
CONNECTION. NO. OF SLOTS ON TOP, ACTIVE LENGTH AND
CFM ON BOTTOM
CEILING RETURN AIR GRILE
W/ SOUND BOOT
CEILING SUPPLY
DIFFUSER WITH FLEXIBLE
DUCT
SIDEWALL EXHAUST
OR RETURN REGISTER
CEILING EXHAUST REGISTER,
(BALANCE TO MATCH SUPPLY IF
RETURN CFM IS NOT SHOWN)
REDUCED PRESSURE BACKFLOW
PREVENTOR W/ DRAIN PAN
BALL VALVE (PIPE SIZES 2" AND SMALLER)
BUTTERFLY VALVE (PIPE SIZES 2-1/2" AND LARGER)
LATERAL STRAINER WITH BLOW-OFF VALVE,
PROVIDE HOSE WHERE DISCHARGE IS NOT
PIPED TO DRAIN
TOP FIGURES
INDICATE NECK SIZE.
BOTTOM FIGURE
INDICATES CFM.
TAP FITTING FOR RECTANGULAR & ROUND DUCT -
VOLUME DAMPER TO BE INCLUDED ON BRANCHES
BALANCE DAMPER
CONNECTION TO EXISTING
DEMOLITION
THERMOSTAT
SENSOR
EMCS SENSOR
REVISION
KEYED NOTE IDENTIFICATION
EQUIPMENT IDENTIFICATION
DETAIL TAG - TOP FIGURE IS DETAIL NO.
ANCHOR
SECTION CUT
NRS GATE VALVE WITH SUPERVISION
EMERGENCY SHUT-DOWN
PLUMBING GENERAL NOTES
1. PIPING FOR THIS PROJECT IS TO BE PLENUM RATED UNLESS EXPLICITLY
STATED OTHERWISE.
2. INSTALL EXPANSION CONTRACTION CONTROL DEVICE EVERY 65 FEET IN
STRAIGHT PIPING LENGTH. COORDINATE WITH MANUFACTURER.
3. SLEEVE PIPING THRU WALLS AND FOUNDATIONS.
4. COORDINATE EXACT ROUTING WITH ALL OTHER TRADES. (PLUMBING
DRAWINGS ARE SCHEMATIC IN NATURE.)
5. ARRANGE PIPING IN PLUMBING CHASES TO ALLOW MAINTENANCE ACCESS.
6. NO PIPING TO BE RUN OVER ELECTRICAL PANELS, VFD'S, OR MCC'S AND A 42"
DEEP ZONE IN FRONT OF PANELS, VFD'S, AND MCC'S IS TO BE PROTECTED.
7. FIXTURE MOUNTING HEIGHTS, DIMENSIONS, AND OTHER REQUIREMENTS ARE
TO BE COORDINATED WITH ARCHITECTURAL AND ADA REQUIREMENTS.
8. LOCATE VENTS A MINIMUM 10' AWAY FROM AIR INTAKES.
9. DOMESTIC WATER LINES ARE TO BE INSTALLED BELOW DUCTWORK.
10. A 24" X 24" ACCESS DOOR IS TO BE INSTALLED BELOW ALL ISOLATION VALVES
& CIRCUIT SETTERS WHERE MOUNTED ABOVE HARD CEILINGS.
11. EXISTING CONDITIONS ARE TO BE VERIFIED PRIOR TO COMMENCING WORK.
12. PLUMBING INSTALLATION AS PER IMC 2021, IFGC 2021, IPC 2021, AND IECC
2021 AS WELL AS ALL LOCAL CODES.
13. ALL FIXTURES ARE TO BE PROPERLY VENTED TO THE ATMOSPHERE.
14. COORDINATE INDIVIDUAL LINE SIZES TO FIXTURES
15. PENETRATION OF A SMOKE BARRIER SHALL BE PROVIDED WITH AN
APPROVED FIRE/SMOKE STOP SYSTEM OF A MINIMUM OF 1 HOUR FIRE RATED
MATERIALS WHICH HAVE BEEN TESTED BY THE AMERICAN SOCIETY OF
TESTING MATERIALS (ASTM) E 814.
14271529-2202
MATTHEW
JAMES
L
IC
E N
S
ED
PROFESS IONAL
EN
G
I N E
E R
STA T E OF UTA H
NIG SREENE APVD.PROJECT ENGINEER DATE
CHECKED
DRAFTED
DESIGNED
R E V I S I O N SNO.
BY
SHEETWELL HOUSE #5
340.11.100JUNE 2026
TG
MJ HVAC
ISSUED FOR BID06/2026
MJ
2026.06.22
H-1
LEGENDS, SYMBOLS & ABBREVIATIONS
SHEET INDEX
SHEET
NUMBER SHEET NAME
H-1 LEGENDS, SYMBOLS & ABBREVIATIONS
H-2 PLAN, DETAILS, AND SCHEDULES
H-3 LOAD CALCS
H-4 COMCHECK
T
EQUIPMENT WEIGHT
250 LBS. OR LESS
CLAMP
HANGER ROD
CROSS BRACING RODS
ALL FOUR SIDES
LOCK NUTS
SECURE TO WALL
ACOUSTICAL LOUVER
OUTSIDE WALL
INSECT SCREEN
CHANNEL FRAMEPROVIDE G.I. BOOT FOR DUCT
CONNECTION AT WALL LINE.
SECURE BOOT TO WALL.
ADJUSTABLE BACKDRAFT (OR MOTORIZED
DAMPERS) SET TO RELIEVE AT 0.03" W.C.
DAMPERS TO BE
SIZED TO COMPLETELY FILL OPENING SEE
SPECIFICATION WHERE SCHEDULED
EUH-1
0 5 10
EUH-2
EF-1
EUH-3
MOU-1
L-1
7 8
14"ø EA 11
MS-5
MS-1
MS-2
MS-3
MS-4
ROUTE TO DRAIN
WITH AIR GAP
1 1/4"ø CD
DN
ROUTE TO DRAIN
1 1/4"ø CD
DN
ROUTE TO DRAIN
WITH AIR GAP
1 1/4"ø CD
DN
1 1/4"ø CD
CHLORINE
ROOM 101
PUMP ROOM
P-1
SEE CIVIL
MS-FUTURE
M
14271529-2202
MATTHEW
JAMES
L
IC
E N
S
ED
PROFESS IONAL
EN
G
I N E
E R
STA T E OF UTA H
NIG SREENE APVD.PROJECT ENGINEER DATE
CHECKED
DRAFTED
DESIGNED
R E V I S I O N SNO.
BY
SHEETWELL HOUSE #5
340.11.100JUNE 2026
TG
MJ HVAC
ISSUED FOR BID06/2026
MJ
2026.06.22
H-2
PLAN, DETAILS, AND SCHEDULES
KEY NOTES
1 VERIFY LOCATION WITH OWNER.
2 INSULATE TEMPERATURE SENSOR. SINGLE THERMOSTAT WITH THREE
STAGE COOLING. STAGE 1 TO ENERGIZE MS-1 AND MS-2; STAGE 2 TO
ENERGIZE MS-3 AND MS-4; STAGE 3 TO ENERGIZE MS-5 AND A
POSSIBLE FUTURE MS-6.
3 INSTALL ON CONCRETE HOUSE KEEPING PAD.
4 COORDINATE CONTROLS LOCATION WITH ELECTRICAL.
5 BUILDING INTAKE LOUVER IS TO BE MOUNTED 7.5 FT ABOVE FINISH
FLOOR.
6 STATIONARY LOUVER WITH MOTORIZED DAMPER. TIED TO EXHAUST
FAN.
7 PROVIDE WITH FACTORY WALL MOUNTING BRACKETS. CONTROL
PANEL CP-1 WILL CONTROL THE ELECTRIC UNIT HEATERS. TYPICAL
FOR ALL ELECTRICAL HEATERS.
8 INSTALL MOTORIZED BACKDRAFT DAMPER TIED TO EXHAUST FAN
OPERATION.
9 EXHAUST FROM BOTTOM OF ROOM.
10 CORROSION RESISTANT PLASTIC IN-LINE FAN.
11 20 GAUGE STAINLESS STEEL DUCT.
12 EXHAUST FAN EF-1 AND LOUVER L-1 TO BE CONTROLLED BY
ELECTRCIAL. SEE ELECTRICAL DRAWINGS FOR MORE DESIGN
INFORMATION.
13 LOCATION OF CONTROL PANEL AND RELAYS TO ENERGIZE THE THREE
STAGES OF COOLING.
14 INSTALL WITH PROPER CLEARANCE.
ELECTRIC UNIT HEATER SCHEDULE
TAG MANUFACTURER MODEL TYPE
NOMINAL HEATING
CAPACITY (BTUH)
WATTS
AIRFLOW
(CFM)
VOLT /
PHASE
MCA MOCP
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
NOTES
EUH-1 Q-MARK IUH-548 ELECTRIC 17,000 5,000 270 460 / 3 6 15 18 18 18 1,2. 3. 4
EUH-2 Q-MARK IUH-548 ELECTRIC 17,000 5,000 270 460 / 3 6 15 18 18 18 1,2. 3. 4
EUH-3 Q-MARK IUH-548 ELECTRIC 17,000 5,000 270 460 / 3 6 15 18 18 18 1,2. 3. 4
1. PROVIDE WITH FACTORY WALL MOUNT BRACKET.
2. PROVIDE WITH FINGER PROOF FAN GAURD
3. COORDINATE WITH OWNER.
4. HEATER TO BE CONTROLLED WITH REMOTE MCP
FAN SCHEDULE
TAG TYPE MANUFACTURER MODEL
AIRFLOW
(CFM)
MOTOR
HP
STATIC PRESSURE
(IN-WC)
MCA MOCP
VOLT /
PHASE
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
WEIGHT
(LBS)
NOTES
EF-1 INLINE-PLASTIC FANTECH PRIOAIR 10"
DUCT LINE
1230 0.25 0.5 2 15 120 / 1 12" 12" 12" 20 1, 2, 3, 4
1. FAN OPERATION TO BE TIED TO MCP
2. COORDINATE SEQUENCING OF FAN OPERATION WITH ELECTRICAL
3. FAN TO BE CORROSION RESITANT
4. EC-10V SPEED CONTROL TO BE INSIDE THE CONTROL PANEL. SEE ELECTRICAL.
NTS
SEISMIC BRACING FOR LIGHT SUPPENDED EQUIPMENT
COMMISSIONING CHECKLIST
[INITIAL - DATE]
GENERAL
START-UP
SEQUENCE
ITEM
THE DESIGN INTENT, NOTES, DETAILS, AND
CHECKLIST ARE UNDERSTOOD.
ALL START-UP CHECK LISTS ARE COMPLETE
& PREPARED TO SUBMIT TO THE OWNER.
THE SEQUENCE HAS BEEN VERIFIED TO
OPERATE CORRECTLY.
THE FOLLOWING CHECKLIST IS TO BE COMPLETED BY THE
CONTRACTOR & RETURNED TO THE ENGINEER AT JOB COMPLETION
WITH AS-BUILT RED LINES
PUMP ROOM SEQUENCE
COOLING: MAINTAIN 80 DEG. MAX WITH 5 DEGREE DEAD-BAND
HEATING: MAINTAIN SET POINT WITH 5 DEGREE DEAD-BAND
WHEN THE PUMP MOTORS ARE RUNNING:
MS / MOU - ON/AUTO
EUH-1,2 - AUTO
WHEN THE PUMP MOTORS ARE OFF:
MS / MOU - ON/AUTO
EUH-1,2 - AUTO
HEATING: MAINTAIN 55 DEGRRES WITH 5 DEGREE DEAD-BAND
MS / MOU - OFF
EUH-1,2 - ON
CHLORINE ROOM
COOLING - EF.1 - SET POINT OF 80°F - OPEN L-1 DAMPER WHEN
ENGAGED.
HEATING - UNIT HEATER - ENGAGE AT TEMPERATURE SET-
POINT.
AS SHOWN
MITSUBISHI INDOOR UNIT (SPLIT) SCHEDULE
TAG MODEL TYPE AIRFLOW
COOLING
CAPACITY (MBH)
HEATING
CAPACITY (MBH)
MOTOR
HP
REFRIGERANT
TYPE
REFRIGERANT PIPE DIM LIQUID /
GAS PRESSURE (INCH)
MCA MOCP
VOLT /
PHASE
HEIGHT
(IN)
WIDTH
(IN)
DEPTH
(IN)
WEIGHT
(LBS)
NOTES
MS-1 PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MS-2 PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MS-3 PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MS-4 PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MS-5 PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MS-FUTURE PKFY-M30NKMU-A WALL MOUNTED 710 - 920 30 34 3/32 R-32 3/8 / 5/8 1 15 208 / 1 14 46 12 60 1, 2, 3
MITSUBISHI CITY MULTI OUTDOOR UNIT SCHEDULE
TAG MODEL
COOLING
CAPACITY
(MBH)
HEATING
CAPACITY
(MBH)
IEER EER
HEATING
COP
DESIGN
COOLING
OUTDOOR
TEMP DB F
DESIGN
HEATING
OUTDOOR
TEMP WB F
REFRIGERANT
TYPE
REFRIGERANT
PIPE DIM LIQUID /
GAS PRESSURE
(INCH)
SOUND
PRESSURE
(dBA)
INVERTER DRIVEN
COMPRESSOR
TYPE/QUANTITY
VOLT /
PHASE
ELECTRICAL
(MCA/MOCP)
WEIGHT NOTES
MOU-1 PUHY-EM168TXU-A 168 168 28 14.7 4 126 -4 R-32 5/8 / 1-1/8 58 INVERTER SCROLL HERMETIC
COMPRESSOR / 1
460 / 3 24 / 40 600 1, 2, 3
NTS
INTAKE AIR LOUVER
LOUVER SCHEDULE
TAG MANUFACTURER MODEL TYPE
AIRFLOW
(CFM)
STATIC PRESSURE
(IN-WC) WIDTH (IN)
HEIGHT
(IN)
DEPTH
(IN)
NOTES
L-1 GREENHECK EDJ-401 INTAKE 1,300 0.1 32 32 6 1, 2, 3
1. BOTTOM OF UNIT IS TO BE INSTALLED 8'4" FROM FINISH FLOOR.
2. ALL INDOOR UNITS WILL BE CONTROLLED BY SINGLE MITSUBISHI CONTROLLER WITH A SPACE TEMPERATURE SENSOR.
3. PROVIDE HYPERHEAT SYSTEM FOR HIGH HEATING DURING LOW TEMPERATURES.
1. INSTALL ON 12" HOUSEKEEPING PAD
2. INSTALL WITH HAIL GAURDS
3. INSTALL WITH LOW AMBIENT KIT
1. OR EQUAL
2. INSTALL WITH MOTORIZED DAMPER. DAMPER IS TO BE TIED TO EXHAUST. SEE PLANS.
3. INSTALL WITH BIRD & BUG SCREEN
14271529-2202
MATTHEW
JAMES
L
IC
E N
S
ED
PROFESS IONAL
EN
G
I N E
E R
STA T E OF UTA H
NIG SREENE APVD.PROJECT ENGINEER DATE
CHECKED
DRAFTED
DESIGNED
R E V I S I O N SNO.
BY
SHEETWELL HOUSE #5
340.11.100JUNE 2026
TG
MJ HVAC
ISSUED FOR BID06/2026
MJ
2026.06.22
H-3
LOAD CALCS
14271529-2202
MATTHEW
JAMES
L
IC
E N
S
ED
PROFESS IONAL
EN
G
I N E
E R
STA T E OF UTA H
NIG SREENE APVD.PROJECT ENGINEER DATE
CHECKED
DRAFTED
DESIGNED
R E V I S I O N SNO.
BY
SHEETWELL HOUSE #5
340.11.100JUNE 2026
TG
MJ HVAC
ISSUED FOR BID06/2026
MJ
2026.06.22
H-4
COMCHECK
| G-1 COVER |
| G-2 INDEX_ LEGEND & SYMBOLS-INDEX L&S |
| G-3 GENERAL NOTES 1 |
| G-4 ABBREVIATIONS-ABBR |
| A-1 ELEVATIONS-ELEVATIONS |
| A-2 ARCHIT. SCHED-TYP DETAILS 1 |
| A-3 DOORS SCHEDULE & DETAILS-TYP DETAILS 1 |
| A-4 ROOFING & ACCESS DETAILS-Layout1 |
| A-5 DETAILS I-DETAILS |
| C-1 SITE PLAN-SITE PLAN |
| C-2 GRADING PLAN-GRADING PLAN |
| C-3 FLOOR PLAN-FLOOR PLAN |
| C-4 SECTIONS I-SECTION |
| C-5 SECTIONS II-SECTION |
| C-6 SCHEDULES & DETAILS-SCHEDULES |
| C-7 WELL_WELLHEAD DETAILS-Layout1 |
| C-8 PUMP BASE DETAILS-Layout1 |
| C-9 MISC DETAILS-Layout1 |
| C-10 TRENCH & MISC DETAILS-Layout1 |
| C-11 FENCE & GATE DETAILS-Layout1 |
| PP-1 DISCHARGE PIPE-PP-1 |
| PP-2 PUMP TO WASTE PIPE-PP-2 |
| CF-1 CHLORINATION DETAILS-Layout1 |
| CF-2 CHLORINATION DETAILS-Layout1 |
| S-1 STRUCTURAL NOTES-Notes |
| S-2 STRUCTURAL NOTES CONT-Notes |
| S-3 SPECIAL INSPECTIONS-Layout1 |
| S-4 SPECIAL INSPECTIONS-Layout1 |
| S-5 FOOTING & FOUNDATION PLAN-S PLAN |
| S-6 WALL PLAN-S PLAN |
| S-7 ROOFING PLAN-Layout1 |
| S-8 SECTION-SECTION |
| S-9 ROOFING DETAILS-Notes |
| S-10 PUMP TO WASTE & FOOTING-Layout1 |
| S-11 TYPICAL MASONRY DETAILS I-Details |
| S-12 TYPICAL MASONRY DETAILS II-Details |
| S-13 MISC DETAILS I-Layout1 |
| S-14 MISC DETAILS II-Notes |
| E1.0 LEGEND |
| E1.1 TABLES |
| E2.0 SCHEDULES |
| E3.0 POWER ONE-LINE DIAGRAM |
| E3.1 INST AND CONTROL ONE-LINE DIAGRAM |
| E3.2 TYPICAL VFD CONTROL DIAGRAM |
| E3.3 CP-1 TYPICAL DIAGRAMS, SHEET 1 |
| E3.4 CP-1 TYPICAL DIAGRAMS, SHEET 2 |
| E3.5 DIAGRAMS |
| E4.0 SITE PLAN |
| E4.1 POWER PLAN |
| E4.2 INSTRUMENTATION AND CONTROL PLAN |
| E4.3 LIGHTING PLAN |
| E4.4 HVAC POWER PLAN |
| E4.5 SECURITY PLAN |
| E5.0 MAIN CONTROL PANEL ARRANGEMENT |
| E5.1 SMALL MOTOR CONTROL PANEL |
| E6.0 DETAILS, SHEET 1 |
| E6.1 DETAILS, SHEET 2 |
| E6.2 DETAILS, SHEET 3 |
| E6.3 DETAILS, SHEET 4 |
| E7.1 MODEL ENERGY CODE, SHEET 1 |
| E7.2 MODEL ENERGY CODE, SHEET 2 |
| H-1 LEGENDS, SYMBOLS & ABBREVIATIONS |
| H-2 PLAN, DETAILS, AND SCHEDULES |
| H-3 LOAD CALCS |
| H-4 COMCHECK |