Q and A 19GE5020R0061.pdf
PDF 106 KB Posted
- Attached to
- Elevator Replacement - US Embassy Ljubljana Federal contract opportunity
- Solicitation number
- 19GE5020R0061
About this file
This document contains questions and answers regarding Solicitation Number 19GE5020R0061 for an elevator replacement project at the US Embassy in Ljubljana, Slovenia. The solicitation involves replacing the existing 160cm by 240cm elevator located in the embassy chancery building. The contractor will be responsible for restoring any flooring or thresholds around the elevator entrances. They may incorporate the up/down signal panel into the top signal panel, and must repair any wall areas where existing signal fixtures were removed. The hoistway entrance doors and frames must have a fire rating of 120 minutes. Temporary storage of the elevator at the embassy warehouse is not possible, but a 40-foot container can be placed in the warehouse parking lot.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19GE5020R0061 0001.pdf | ||
| fw14.pdf | ||
| J.2.2 Sample ILC - Payment Guaranty.pdf | ||
| J.2.1 Sample ILC - Performance Guaranty.pdf | ||
| J.3.1 Sample Breakdown of Price Proposal.xlsx | XLSX spreadsheet | |
| RFP Cover Letter.pdf | ||
| J.1.1 Specifications.pdf | ||
| J.2.3 COR Questionnaire for TCNs.pdf | ||
| 19GE5020R0061.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elevator Replacement US Embassy Ljubljana
Solicitation Number 19GE5020R0061
Questions and Answers
Q1: Thresholds and flooring: Who is responsible to replace the elevator thresholds and vinyl and/or carpet flooring around the elevator entrances at all floors?
A1: SOW: 1.2 Related work to be performed B - #7 & #8
The Contractor is responsible for restoring the flooring/thresholds utilizing its own labor force or flooring subcontractor. In the case of not being able to exactly match existing flooring, Contractor will coordinate with the COR at Post for the authorized in writing best solution.
Q2: Up/down side panel: There is an up/down signal panel on the right side of the elevator doors at each elevator landing. May this up/down panel be incorporated within the top signal panel? If yes, how shall the contractor cover the unused holes/junction boxes?
A2: SOW: 1.2 Related work to be performed B - #7 & #8
SOW: 2.13 Signals - #2. Hall/Arrival Lantern: Chimes and lights signaling the car is arriving and displaying the direction the car is traveling in. If the new Hall Lantern fixture is surface mounted and can utilize existing back-box, OBO EM has no objection to reinstalling the Hall Lantern in its current location. If the new Hall Lantern is incorporated into the new Position Indicator above each landing entrance the contractor is responsible to repair/restore the wall where the existing Hall Lantern cutout is located.
In the case of not being able to exactly match existing wall finish, Contractor will coordinate with the COR at Post for the authorized in writing best solution. I prefer not to use “Uh-Oh” cover plates, especially in such an historic building.
Q3: Elevator “fire fighter rating”: Does the elevator need to comply with the 60 min fire rating listed under EU 8172 standard? Shall the elevator landings be upgraded to comply with the fire rating under EU 8172 standard?
A3: SOW: 1.4 A-D Quality Assurance (E, I, K)
SOW: 2.8 Hoistway Entrances, Doors B. - #2 Minimum 1.5 Hours (90 Minutes) OBOs vertical design standard requires the minimum certified fire rating to be 90 minutes. The height of the building does not require full compliance with EN81-73 but OBO request the hoistway entrance doors comply, requiring the 2 hour (120 minute) fire rating for the entrance doors and frames displaying a label on each stating as such. The short answer is we prefer the higher fire rated hoistway doors @ 120 minutes.
Q4: What are the dimensions of the elevator platform?
A4: The elevator car, measuring from the pit, is 160cm x 240cm.
Q4: Can the elevator be stored temporarily at the Embassy’s warehouse?
A4: No, the warehouse is very small and cannot fit anything further. There is space for a 40-foot container in the warehouse parking lot (at cost). The property owner can be contacted at tone.gabrovsek@gmail.com for further information. The warehouse is not near the Embassy Chancery.