Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 12 PAGES

OPERATIONAL CENTER FITOUT, 12 CITIES FOR CNP

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Bond:

Payment Bond:

Liability Bond Stability Bond Elements Quality Bond Correct Equipment Functioning Bond

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

01 78 00 SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 12 PAGES

01 78 00 3.3Operation and Maintenance Manuals

SD-11 Closeout Submittals 3.1As-Built Drawings

02 41 00 SD-01 Preconstruction Submittals 1.2.1Demolition Plan 1.2.1Deconstruction Plan 1.9Existing Conditions

03 52 16 SD-06 Test Reports 2.1.1Design Mix

04 20 00 SD-03 Product Data

2.1.2 GClay or Shale Brick

07 11 13 SD-07 Certificates 1.2Materials

07 92 00 SD-03 Product Data 2.1Sealants

SD-07 Certificates 3.4.4Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.3 GFrames

2.2Accessories 2.4Weatherstripping

SD-03 Product Data

2.1 GDoors

2.3 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 12 PAGES

08 14 00 SD-02 Shop Drawings 2.1Doors

SD-03 Product Data 2.1Doors 2.2Accessories 2.3.5Water-resistant sealer

SD-04 Samples 2.1Doors 2.3.4.4Door finish colors

08 32 13 SD-02 Shop Drawings 2.1Aluminum sliding glass doors

SD-03 Product Data 2.1Aluminum sliding glass doors 2.1.1Hardware 2.1.2Glazing

SD-10 Operation and Maintenance Data

2.1Aluminum sliding glass doors 08 71 00 SD-03 Product Data

2.2Hardware Items SD-08 Manufacturer’s Instructions

3.1Installation 08 81 00 SD-03 Product Data

2.1.2Tempered Glass 2.1.1Laminated Glass

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 12 PAGES

08 81 00 2.1.1Laminated Glass 09 23 00 SD-04 Samples

1.3.1Gypsum Plaster 09 29 00 SD-03 Product Data

2.1.2Fiber cement units 2.1.6Accessories 2.1.1Gypsum Board 2.1.3Joint Treatment Materials

09 65 00 SD-03 Product Data

2.6 GResilient Flooring and

Accessories 2.2Adhesives 2.1Sheet Vinyl Flooring

SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation

09 90 00 SD-02 Shop Drawings 3.8Piping identification 3.8stencil

SD-03 Product Data 2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.6Color SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 12 PAGES

09 90 00 3.5.2Mixing 1.4.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

12 24 13 SD-02 Shop Drawings

3.2Installation SD-03 Product Data

2.1Window Shades SD-08 Manufacturer’s Instructions

2.1Window Shades SD-10 Operation and Maintenance Data

2.1Window Shades 12 93 00 SD-02 Shop Drawings

1.3.1Drawings SD-03 Product Data

2.5Chairs 2.6Tables

23 07 00 SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 12 PAGES

23 81 00.00 20 SD-03 Product Data 2.1Air Conditioners 1.4Refrigerant 2.4Refrigerant Piping and

Accessories 2.1.6Drainage Piping 2.1.3Control System

SD-06 Test Reports 3.7.3Start-Up and Initial Operational

Tests SD-08 Manufacturer’s Instructions

2.1Air Conditioners 2.4Refrigerant Piping and

Accessories 2.1.3Control System

SD-10 Operation and Maintenance Data

2.1Air Conditioners 2.1.3Control System

26 20 00 SD-02 Shop Drawings 2.12Panelboards 2.4Cable trays

SD-03 Product Data 2.11Receptacles 2.12.3Circuit breakers 2.10Switches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 12 PAGES

26 20 00 SD-06 Test Reports 3.5.2600-volt wiring test 3.5.4Grounding system test 3.5.3Ground-fault receptacle test

26 32 33.00 10 SD-02 Shop Drawings 2.1UPS System 3.1Installation

SD-03 Product Data 2.1.4Performance Requirements 2.1.3.2Spare Parts

3.3 GField Training

SD-06 Test Reports 2.2Factory Testing

SD-10 Operation and Maintenance Data

3.3 GOperating and Maintenance

Manuals

26 51 00 SD-03 Product Data 2.2Luminaires 2.4Light Sources 2.3Drivers 1.6.1LED Luminaire Warranty 2.5.2Dimming Controllers (Dimmers) 2.6.1Exit Signs 2.5.3.1Occupancy Sensors

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 12 PAGES

26 51 00 1.6.1.1Luminaire Useful Life Certificate 27 10 00 SD-02 Shop Drawings

1.5.1.1Telecommunications drawings 1.5.1.2Telecommunications Space

Drawings SD-03 Product Data

2.3Telecommunications cabling 2.4.3Patch panels 2.5Telecommunications outlet/connector assemblies 2.4.1Equipment support frame

SD-06 Test Reports 3.4.1Telecommunications cabling testing SD-07 Certificates

1.5.2.1Telecommunications Contractor 1.5.2.2Key Personnel 1.5.2.3Manufacturer Qualifications 1.5.3Test plan

SD-09 Manufacturer’s Field Reports

2.9.1 GFactory reel tests

SD-10 Operation and Maintenance Data

1.9.1Telecommunications cabling and pathway system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 12 PAGES

27 10 00 SD-11 Closeout Submittals 1.9.2Record Documentation

27 22 19 SD-11 Closeout Submittals 1.3.3As Built Drawings and

Documentation 27 22 23 SD-11 Closeout Submittals

1.5As-Built Drawings and Documentation

27 41 16 SD-01 Preconstruction Submittals 1.3.6Report Documenting Changes to the Site 1.3.7Predelivery Test Procedures

SD-02 Shop Drawings 1.3.3As-Built Drawings

SD-03 Product Data 1.3.8.2Training Documentation

SD-06 Test Reports 1.3.8Performance Verification Test 1.3.8Reliability Test Procedures 1.3.2Test Procedures and Reports

SD-08 Manufacturer’s Instructions 1.3.9Group V Technical Data Package

SD-10 Operation and Maintenance Data

1.3.8.1Operation and Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 12 PAGES

27 41 16 SD-11 Closeout Submittals 1.3.8.3Data Entry (Configuration)

28 20 00.00 20 SD-02 Shop Drawings 1.6.1.1ESS components 1.6.1.2Overall system schematic

SD-03 Product Data 2.4.13.4Card reader 2.4.13.4Keypad 2.4.13Biometric finger print reader 2.4.14.2cable

SD-05 Design Data 1.4.1.1Backup battery capacity calculations SD-06 Test Reports

1.6.4ESS operational test plan SD-07 Certificates

1.6.4ESS operational test plan 1.6.2.1Installer's qualifications 1.6.2.2Instructor's qualifications

SD-10 Operation and Maintenance Data

1.6.1.1ESS components 1.6.5ESS software

SD-11 Closeout Submittals 3.2.1As-Built drawings 2.3.3Posted operating instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 12 PAGES

28 23 23.00 10 SD-01 Preconstruction Submittals 1.4.2Report Documenting Changes to the Site 1.4.3Predelivery Test Procedures

SD-02 Shop Drawings

1.3.3 GAs-Built Drawings

SD-03 Product Data

1.4.4.2 GTraining Documentation

3.6.9 GSoftware Updates

3.4.1 GCopies of the Audio-Visual

Materials SD-06 Test Reports

1.4.4 GPerformance Verification Test

1.4.4 GReliability Test Procedures

1.3.2Test Procedures and Reports

3.5.1 GOriginal Copies of all Test Data

3.5.2 GReport Describing All Results

SD-07 Certificates 3.3Supplemental Quality Control 3.5.2Letter of Certification

SD-08 Manufacturer’s Instructions 1.4.5Group V Technical Data Package

SD-10 Operation and Maintenance Data

1.4.4.1 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 12 PAGES

28 23 23.00 10 3.4.2Operator's Training Report SD-11 Closeout Submittals

1.4.4.3 GData Entry (Configuration)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.