This amendment to a solicitation provides responses to contractor questions regarding a project to upgrade physical security systems at the Amistad Dam Field Office. The International Boundary and Water Commission seeks a small business contractor to install high mast lighting, fencing, gates, access control, intrusion detection, and CCTV components. The responses clarify that fiber connectors must be compatible with existing systems; minor drilling is acceptable; cameras must provide night vision and observation of specific areas; and fence and lift gate specifications are attached.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT ,
1. CONTRACT ID CODE
I
PA
E OF PAGES
I 2
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
I
5. PROJECT NUMBER (If applicable)
A0004 08/12/2020 20204361032
6. ISSUED BY CODE IBWC 7. ADMINISTERED BY (If other than Item 6) CODE I International Boundary and Water Commission (IBWC)
USIBWC - ACQUISITIONS DIV
4191 NORTH MESA ST
EL PASO, TX 79902-1441
POC: Carmella Speer SpeerC@state.gov
B. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) J& 9A. AMENDMENT OF SOLICITATION NUMBER
191 BWC20R0006
9B. DATED (SEE ITEM 11)
07/17/2020
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended. � is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items B and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not � is required to sign this document and return ___ 1 __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment A0003 is to:
1. Provide Responses to RFls.
2. Provide Informational Attachments See page 2 for further details.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed. remains unchanged and in full force and effect
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Carmella L. Speer
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
STANDARD FORM 30 (REV.11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
191BWC2OR0006 Physical Security Upgrades - Amistad Dam
Fiber
1. What type of fiber connectors will need to be used? (Page #17 Ref #18) Whatever type that is compatible with the security components and the current runs of fiber at the facility.
2. Will there be an issue drilling through the Dam structure?
(page #16 Ref #12 G & H) Minor drilling into the walls to mount readers will not be an issue.
3. Will there be an issue drilling through the door frames that are on the dam structure? (page #16 Ref #12 G & H) No.
Camera & Motion
4. What type of cameras for PTZ and Fixed will be used? Even though manufacture named were used on the drawings there were no model number to reference to be used for the new cameras. Do we use our own discretion or use Pelco and Avigilon cameras? As long as the cameras meet our requirements, make and model don’t matter. However, night vision is required.
5. Page 15 #7 L Will the camera be place closer to the elevator or by the gate? It should be mounted in such a way that it provides complete observation of the gate and a portion of the hallway if the gate is in the open position.
6. Page 15 #8 A Will the Motion be place closer to the elevator or by the gate? It should be positioned in such a way that it will monitor persons who may penetrate the gate.
Fence
7. Is there a spec or detail on the F7 fence? See attached FF7 Chain Link Fence Details
8. Is there a manufacturer basis of design or spec for the Lift gates 4K.? & what sizes? See response above
Attachments
DoD Anti-Ram Vehicle Barriers (January2014)
FEMA Perimeter Security Design 430 ch4
FE7 Chain Link Security Fence Details
End of Amendment