About this file

This document outlines a federal contract opportunity for services to remove, replace, and upgrade four motor control centers. The contractor shall provide all labor, materials, and resources to remove and replace two motor control centers and upgrade components of two additional motor control centers at a power plant facility in Falcon Heights, Texas. Work will include installing two automatic transfer switches, updating the programmable logic controller digital program, installing a new fiber optic/CATV communication system, and running new electrical feeders according to code. Funds are not presently available and no award will be made until funding is allocated. The solicitation is being conducted by the International Boundary and Water Commission United States-Mexico.

View the file

Other files for this federal contract opportunity

Other files attached to Services to remove, replace, and upgrades four (4) Motor Control Centers, newest first.
File Type Posted
Qand A.pdf PDF
Partial Submittals D2A.pdf PDF
PARTIAL_SUBMITTALS ATS 1-8.pdf PDF
PARTIAL SUBMITTALS D1A (1).pdf PDF
MCC Phase 1.pdf PDF
PARTIAL SUBMITTALS N4A_1-19.pdf PDF
PARTIAL SUBMITTALS PLC CABINET 1-11.pdf PDF
QandA 7.16.2020.pdf PDF
New Equipment required ONE LINE DIAGRAM.pdf PDF
FUTURE GENERAL ONE LINE-O001096-01-02 rev2.pdf PDF
CURRENT GENERAL ONE LINE 07 2020.pdf PDF
pic 2.jpg JPG image
Pic 1.jpg JPG image
191BWC20R0005.pdf PDF
Att 3 WD 2015-5309 Rev 11.pdf PDF
Att 4 WD TX2020221 01.03.2020.pdf PDF
Att 2 QASP Falcon Motor Control Center.pdf PDF
Att 1 PWS- Falcon Power Plant Motor Control Center II.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

1. Please confirm that two (2) new ATSs needs to be supplied, installed and commissioned for MCCs N1A and N4B, that each ATS needs to be wired to the existing 480V QED2 Switchboard and that new breakers needs to be supplied for the existing 480V switchgear.

Yes

2. Please confirm that the four (4) new circuit breakers needs to be wired and program to the existing QED2 Switchboard PLC and that a new digital input module needs to be added.

Yes

3. Please confirm that the ATSs status needs to be wired to the existing PLC panel.

4. Can you please let us know the brand and model of PLC panel that needs to be reprogram and rewired with new hardware.

5. Please confirm that all the MCCs contactors and circuit breaker status needs to be wire to the remote PLC i/o and reprogram in the existing PLC.

6. Please confirm MCCs annunciator display indication lights.

Yes, status lights open/close

7. Please let us know the MCCs power meter brand and model that is currently being used and that needs to be install in the new MCCs.

Yes, preference same brand than the others power meters

8. Please let us know the type of PLC Automatic Throw Over control scheme that needs to be installed in the MSB board.

Same as the other MCC’s

9. Please confirm that a coordination and arcflash study needs to be performed/updated after installation.

Yes

10. Who will be responsible for any concrete perforation that will be needed for the Rigid pipes.

Contractor supply and perform everything related with this project