About this file

This document contains questions and answers regarding a federal solicitation for services to remove, replace, and upgrade four motor control centers at a power plant facility in Falcon Heights, Texas. The solicitation seeks a contractor to remove and replace four motor control centers, including the MSB MCC pump and compressor board, D4A MCC auxiliary power board for generator 4, N4B MCC heating and ventilation motor control, and N1A MCC heating and ventilation motor control. The contractor will also install two automatic transfer switches, update the program logic controller digital program, and install a new electrical feeder system with fiber optic and CATV communication to monitor equipment status from the control room. Funds are presently unavailable, and no award will be made until funding is allocated.

View the file

Other files for this federal contract opportunity

Other files attached to Services to remove, replace, and upgrades four (4) Motor Control Centers, newest first.
File Type Posted
Qand A.pdf PDF
Partial Submittals D2A.pdf PDF
PARTIAL_SUBMITTALS ATS 1-8.pdf PDF
PARTIAL SUBMITTALS D1A (1).pdf PDF
MCC Phase 1.pdf PDF
PARTIAL SUBMITTALS N4A_1-19.pdf PDF
PARTIAL SUBMITTALS PLC CABINET 1-11.pdf PDF
FUTURE GENERAL ONE LINE-O001096-01-02 rev2.pdf PDF
CURRENT GENERAL ONE LINE 07 2020.pdf PDF
pic 2.jpg JPG image
New Equipment required ONE LINE DIAGRAM.pdf PDF
Pic 1.jpg JPG image
QandA.pdf PDF
191BWC20R0005.pdf PDF
Att 3 WD 2015-5309 Rev 11.pdf PDF
Att 4 WD TX2020221 01.03.2020.pdf PDF
Att 2 QASP Falcon Motor Control Center.pdf PDF
Att 1 PWS- Falcon Power Plant Motor Control Center II.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A 7/16/2020

Are there any additional pictures or existing drawings that reflect locations of the MCC's relative to

MDP?

Already posted

The Rizer diagrams show how the MCC's are fed but they do not provide their layout/location relative to the MDP. The specifications call for new feeders but we are unable to determine distances of conduit and feeders, routes and an assessment of some of the conditions/space.

The Air Compressor Board (MCC)requires 2 feeders about 250 FT each with rigid conduit and wire size according to NEC standards.

N1A (MCC) requires a feeder about 200 FT with rigid conduit and wire size according to NEC standards.

N4B (MCC) requires a feeder about 300 FT with rigid conduit and wire size according to NEC standards.

The drawings encourage a site visit (travelling is a little challenging due to covid restrictions) and was hopeful that additional information might be available. I was unable to locate info regarding a site visit. Could you let me know whether one was/is scheduled?

For a site visit please contact Edi Delgado at 956 848-5265.