This amendment to solicitation 140P8423Q0047 modifies the requirements to replace and relocate barricade gates at Point Reyes National Seashore in California. The amendment clarifies that two new gates must be furnished and installed on the east side, with post type III with G foundation required, and one existing gate on the west side must be removed and replaced, allowing reuse of the existing post and conduit. Bidders must acknowledge receipt of the amendment by the new deadline of September 13, 2023 to submit revised pricing using the attached revised quote sheet and specifications indicating changes in red text. The performance period is from September 25, 2023 to November 24, 2023. Diane Ochi Tsuji is designated as the contracting officer's representative.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8423Q0047 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPR
Point Reyes Station CA 94956-9703 1 Bear Valley Road Point Reyes National Seashore
NPS, PWR - PORE MABO
09/11/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/10/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
REPLACE BARRICADE GATES, PINNACLES NATIONAL PARK, SAN BENITO COUNTY, CALIFORNIA.
This Amendment 0002 corrects the requirement to indicate there is only one (1) existing gate on the East side that needs to be removed. Additionally, this Amendment confirms that two (2) new gates shall be furnished/installed on the East Side, and one (1) gate on the
West Side shall be removed and replaced.
This Amendment documents that the Post III with "G" foundation option will be required for the two (2) new East Side Gates, not the Movable post option previously specified.
This Amendment documents other changes to the requirement including the following:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Alanna Gardner
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8423Q0047/0002
-Contractor may dispose of removed gates, components, and soil within the park at an acceptable location determined by the NPS COR;
-Contractor may use 5000 PSI bag mix concrete for gate posts;
-Contractor may use the existing post at the West
Side gate;
-Contractor may reuse the existing conduit to power the solar panels for West Side Gate.
Attachments:
B08_Attachment_1_NPS Specifications_revised.pdf
(revisions are indicated in red text).
Quote Sheet_revised.docx (use this to provide revised pricing)
B08_Attachment_11_Site Map East Side Gate to remove.pdf
Finally, this Amendment incorporates a recent wage modification to Davis-Bacon Act General
Decision Number CA20230018 published on September
7, 2023, as follows:
B08_Attachment_5_Wage Rates_07Sep2023.pdf
In light of the above, this Amendment provides a date extension to submit quotations through 5:00 pm Pacific Daylight Time on Wednesday, September
13, 2023.
Period of Performance: 09/25/2023 to 11/24/2023
Diane Ochi Tsuji is designated as the NPS
Contracting Officer's Representative (COR) for this order and will be responsible for certifying receipt and acceptance of the services rendered.