B09_Solicitation_Amendment_3_attch_6_Questions_and_Answers_1_0003.pdf

PDF 152 KB Posted

Attached to
BADL Rehab South Unit Wastewater System
Solicitation number
140P6324B0001
Issued by

About this file

This document contains questions and answers related to a solicitation for construction services to rehabilitate the south unit wastewater system at Badlands National Park. The solicitation requires contractors to hire and provide an archeological monitor approved by the park to supervise all ground disturbance work. Contractors must also comply with Tribal Employment Rights Office requirements and include associated costs in their bids. The park will not provide power, water, or an area for material laydown. Contractors are responsible for erosion control, seeding, and compaction testing. Work hours are restricted due to the project's proximity to residential areas and to protect wildlife. One supervisor is required to be onsite during normal operations. An unexploded ordnance monitor will review excavation areas before work begins but is separate from the archeological monitoring role.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Badlands Wastewater Upgrades

Solicitation # 140P6324B0001

Questions and Answer

# Contractor’s Questions Government Answer 1 Archeological Monitor. MONITOR

PROVIDED & PAID BY WHO?

Contractor is responsible for Hiring/Providing a Monitor to supervise any and all ground disturbance including but not limited to: Digging, Trenching, and Boring. All Monitors must be approved by the Park.

Additional Information on this is being Provided. A list of previously used Companies and Personnel for this sort of Monitoring is being provided. You are not required to use one of these, they are listed for convenience.

2 Will TERO Compliance be required? Yes, TERO is applicable. Contractor is responsible to reach out to the TERO office. Contractor must include the TERO costs in their Bid Costs.

3 Will TERO & Solid Waste Fee be required?

TERO POC information: Tyrell Pierce, TERO Acting Director Oglala Sioux Tribe PO Box 379 Pine Ridge, SD 57770-0379 Phone – 605- 867-5167 Fax – 605-867-5892 E-mail: Tyrell.Pierce@hotmail.com, BFFYredfish@yahoo.com

4 Can you please provide the soils report?

Yes

5 Can you provide Section 32 92 00 in specifications?

Hydroseed per BADL seed specs, seed specs have been attached at the bottom.

6 Can you please provide a fence spec? All fence details and specifications are on Plan Sheet C15 and Division 1 PART 2 – Products 2.1.C-G, Page 82

7 Gravel spec for gravel access road? Is there a gravel spec.?

Is there a estimated quantity available?

Gravel access road rehab is not a part of this project. The current two track road in is a non-permanent feature in the location. The park is under consideration of development

8 Can we get water for compaction from the White River?

No

9 Does the cost of water get paid to OST Natural Resources?

No- if water is taken from the access in the park from the parks facilities the park will incorporate the costs. If you are wanting to have larger/close access from the fire hydrant at the location this would be a private agreement between the contractor and West River Lineman Jones (utility owner at this location). If the contractor decides to bring in their own water or water from a different source location, then the costs would be incumbent on the contractor.

10 Disposal Area for Excess Excavation Material? Available on Site and/or location?

None. As written all material “removed” to form the lagoons should be repurposed for use in the berms around the lagoons and surrounding area.

11 Erosion Control for Waste Area during Construction?

Yes, see Plan Sheet C12

12 Seeding for Waste Area? Yes, Seeding will be required for any disturbed ground or overly damaged vegetation outside of the areas in the lagoons that are lined, per BADL seed specifications section 32 92 19.

13 REINFORCED MEMBRANE

LAGOON LINE

a. Provide 4 IN thick, 2,000 PSI, concrete pads at all pipe inlets and

Drainage composite fabric is laid underneath the reinforced membrane lagoon liner. See detail 3 C13 on the Plan Set.

mailto:Tyrell.Pierce@hotmail.com outlets. 1) Place a double layer of membrane under all pads.

Not on detail. Membrane is above pads. Please clarify.

14 The cost of including an environmental manager on this project will be significant. Please confirm that environmental manager is a requirement of this project

Environmental Manager can be incorporated within the Onsite Contractor Superintendent.

15 Any Cell Pre-Fill Requirement for finished Liner?

No

16 What will be done about the existing gravel road at Lagoon and access it provides? ( Plan appears to show project will eliminate access to East.)

Gravel access road rehab is not a part of this project. The current two track road in a non-permanent feature in the location. The park is under consideration of development.

17 Who pays for Geotechnical Engineer inspections & approvals as noted below in 3.6 A and B?

Contractor is responsible for compaction testing and any lab work per specifications.

18 Can you clarify the requirements of an onsite Geotechnical Engineer for this project as noted below in 3.6 A and B?

Contractor is responsible for providing the testing company and any onsite compaction testing per specifications.

19 Clarity on Responsibilities of Special Inspector:

Special Inspector is the UXO and is provided by the park service to preform duties within the South unit. See question 38

20 Clarity on Responsibilities of Testing Agency for Site Excavation and Grading:

Contractor is responsible for providing the testing company and any onsite compaction testing per specifications

21 Will the owner please define where the laydown area will be located?

Coordinate the laydown area with the Park’s COR/Facility Manager and the CO

22 Will the owner please provide the AET geotechnical/Soils Investigation reports?

Yes

23 Will the owner be providing power to the site?

No

24 Will the owner be providing water to the site?

No- if water is taken from the access in the park from the parks facilities the park will incorporate the costs. If you are wanting to have larger/close access from the fire hydrant at the location this would be a private agreement between the contractor and West River Lineman Jones (utility owner at this location). If the contractor decides to bring in their own water or water from a different source location, then the costs would be incumbent on the contractor.

25 Are we able to work federal holidays?

Any work during either Weekends or Federal Holidays is not Regularly Approved. Exceptions Can be made on a case-by-case basses and must be formally requested in writing at least 72 business day hours before work on these days is to begin.

26 Are we able to accelerate and work nights if needed?

The area of work on the west side of the Road is within 100 yards of a residential area and work in this area is restricted to between the hours of 8AM and 5PM. On the East Side of the Road (area of the Lagoon) work is limited to between 1 hour after Sunrise and 1 hour before sunset. This is BADL regulation for wildlife preservation of Endangered and Threatened Species that are in the park.

27 Is an OSHA 10 certification required for all employees on site?

No. One person on site during normal operations needs to be (recommend that this person be a supervisor or superintended of work site)

28 Please Conform that the contractor is required to include an archeological Monitor for the duration of the project

The Contractor is responsible for Hiring/Providing a Monitor to supervise any and all ground disturbance including but not limited to:

Digging, Trenching, and Boring. All Monitors must be approved by the Park. Additional Information on this is being Provided. A list of previously used Companies and Personnel for this sort of Monitoring is being provided. You are not required to use one of these, they are listed for convenience.

29 Can the Archeological monitor also be the Environmental manager?

If they are duel Certified and pass Park approval for Monitor yes.

30 Will seeding be required for this project?

Yes, per BADL National Park specific seed spec. See specification Section 32 92 19.

31 Will the contractor be responsible for establishing the seed upon project completion?

Yes

32 Please clarify how many competent people are needed on site for supervision from the general contractor

One person (Recommend Project Superintendent, and/or supervisor be this one person) needs to be on site during all normal operations.

33 Is the SSHO required? SSHO is not named in the specifications

Not Required, would recommend, could be the same as either Superintendent and/or supervisor.

34 Can the Superintendent dual or triple hat and cover the Environmental manager, QC and SSHO

Yes

35 Are there any other requirements for supervision?

Project Manager, and Superintendent are the only requirements.

Recommend naming an alternate supervisor in advance to cover times when Superintendent is not available.

36 The plans call for a grade of 0.09% over a 1700’ span. Typically, the tightest you would run is 0.5% with a variance of 0.1-1.0%. Can the grade be adjusted?

Follow the plan of profile.

37 The specs mention pulling a mandrel or pig through the line. 2” HDPE/POLY usually has a fair amount of deflection from the factory and a bore of this length with a curve will not help. I would like to use a soft pig and an air compressor if this is necessary.

A soft pig run with compressed air would be an acceptable alternative

38 It was brought to my attention that there may need to be a UXO monitor for the Badlands National Park south unit wastewater system rehabilitation project. For clarification, are we to hire one or is that something that will be investigated by the government prior to the start of construction?

Surface investigation has already happened. It is required to notify the South Units UXO before excavating material on the east side of the road for them to review the area before dirt work begins. UXO will determine if they need to be on site for the entire excavation of materials. This is not the same as an Archeological monitor and the two rolls are not interchangeable/combinable. Park will provide contact for UXO before any onsite work is to begin.

39 the lagoon liner subgrade looks, according to the legend, to be sandstone. Is that correct?

The Earth/soil below the liner is institute unconsolidated earth.