Sol_140P6320B0009_Base.pdf
PDF 348 KB Posted
- Attached to
- Construct Bison Corrals at Wind Cave NP Federal contract opportunity
- Solicitation number
- 140P6320B0009
About this file
This invitation for bids solicits construction services to construct bison corrals at Wind Cave National Park. The National Park Service is seeking to replace existing bison corrals, foundations, and supply a new metal building under a fixed-price construction contract with a period of performance of 300 calendar days from notice to proceed. The location of work is Wind Cave National Park in Hot Springs, South Dakota. Bidders must be construction contractors capable of performing all aspects of the project, which includes demolition and installation of corrals and foundations. The total project cost is estimated between $1-5 million. Bids are due at a specified date and time. The solicitation includes specifications, drawings, wage determinations, and standard contract clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WICA Bison Corral Drawings 7-1-2020_Base.pdf | ||
| Sources Sought Market Survey.docx | DOCX document | |
| WICA Bison Corral Specifications 6-5-20_Base.pdf | ||
| Sol_140P6320B0009_Amd_0001.pdf | ||
| WICA Bison Corral Drawings Rev 1_Amd_0001.pdf | ||
| BID Schedule_Base.docx | DOCX document | |
| Construction Wage Det_Base.docx | DOCX document | |
| Solicitation CPARS Notice_Base.pdf | ||
| Presolicitation Notice Bison Corrals.pdf | ||
| QA Site Visit 7.31.20_0002.pdf | ||
| Sol_140P6320B0009_Amd_0002.pdf | ||
| Site Visit Roster 7.21.20_0002.pdf | ||
| Site Visit Handout Document_0002.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040485137
NPS, MWR - NEKOTA MABO
24290 Doane Mountain Road
Keystone SD 57751-4401
PMN
NPS NEKOTA MABO: Ron Kesterson
24290 Doane Mountain Road Keystone, SD 57751
Ronald Kesterson 605-574-3183 x
07/07/2020
140P6320B0009
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The work includes all mobilization, work, labor, and materials to complete this work to include Prime/Subcontracting oversight for demolition and installation of bison corral systems at Wind Cave National Park. Contractors must be capable of completing all facets of the project as described. This is a Sealed-Bid.
LOCATION: Wind Cave National Park, Hot Springs, South Dakota 57747
MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000.
BONDS: Required as stated in Block 12. Bid Bonds/Guarantee; Performance, and
Payment bonds/Protection in the amount of 20%/ Bid and 100%/ Final award amounts.
NAICS CODE: The associated NAICS code is 238990 with a size standard of $16.5 million.
NOTICE: This project is set aside 100% for HUBZone Certified Small Businesses
SITE VISIT: A pre-bid site visit will be held at Wind Cave National Park using an
RSVP/Scheduling process to ensure compliance with social distancing guidance as a
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 300 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
08/07/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, MWR - NEKOTA MABO
24290 Doane Mountain Road
Keystone SD 57751-4401
PMN
Matthew Null
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6320B0009 result of COVID-19. Contractors must contact Ron
Kesterson, ron_kesterson@nps.gov to reserve a meeting time. Specifics and final meeting location will be communicated as part of this process. The site visit date/time will be July
22 at 9AM. Contractors must RSVP not later than
July 15, 2020.
SCHEDULE: The Government anticipates that work will begin in October, 2020. The total period of performance is 300 days, which includes necessary lead time for materials. The start date may vary slightly dependent on final award and the Notice to Proceed.
WAGE RATES: Davis Bacon wage rates apply and are included as part of this solicitation package.
SYSTEM FOR AWARD MANAGEMENT (SAM): The successful offeror must be registered in SAM and have current online Representations and
Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.
METHOD AND INSTRUCTIONS FOR SUBMITTING BID: This will be a Sealed Bid acquisition. Sealed
Bids/Hard Copies/Bid Guarantee/Bonds are
Required. Only Hard Copies will be accepted and will be opened on the date/time specified and must be delivered to the NEKOTA MABO Contracting
Office, 24290 Doane Mountain Road, Keystone, SD, 57751, Attention: Ronald Kesterson, 605-574-3183.
Contractors are responsible to ensure Bids are delivered prior to the Bid opening date/time specified. Due to the COVID19 situation, contractors should use the United States Postal
Service for mail and/or delivery of Sealed Bids that will be opened on the date/time specified.
A Contracting Officer will be working in the
Keystone contracting office between the hours of
9AM and the bid opening time to accept bids delivered prior to the bid opening time and will check the mail prior to final bid opening. By submitting a bid, the contractor agrees that they will follow the specifications provided and complete the work accordingly.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6320B0009
QUESTIONS: All questions pertaining to this solicitation shall be submitted IN WRITING by e-mail to ron_kesterson@nps.gov or mailed to the address in Block 7. All questions must be submitted in writing within 5 calendar days following the scheduled site visit to allow the government adequate time to respond through a formal amendment as necessary.
Delivery: 07/31/2021
Delivery Location Code: 0009060449
NPS, MWR, Wind Cave NP
26611 US Highway 385
Hot Springs SD 57747-6027 US
Period of Performance: 10/01/2020 to 07/31/2021
00010 Construct the Bison Corrals
See Bid Schedule for Required Breakdowns
Product/Service Code: Z2PC
Product/Service Description: REPAIR OR ALTERATION
OF UNIMPROVED REAL PROPERTY (LAND)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P6320B0009 WICA Bison Corrals Page 5 of 41
Section A: Solicitation/Contract Form Special Notice for Bidders 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) Section B: Bid Schedule Section C: Specifications/Drawings Section D: Packaging and Marking Section E: Inspection and Acceptance 52.246-12 Inspection of Construction (AUG 1996) 52.246-21 Warranty of Construction. (MAR 1994) Section F: Deliveries or Performance 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.242-14 Suspension of Work. (APR 1984) Section G: Contract Administration Data Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013) 1452.201-70 Authorities and delegations. (SEP 2011) Section H: Special Contract Requirements 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.248-3 Value Engineering—Construction (Oct 2015) Section I: Contract Clauses 52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016) 52.204-22 Alternative Line Item Proposal (JAN 2017) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015) 52.214-26 Audit and Records – Sealed Bidding (OCT 2010) 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding (AUG 2011) 52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding (OCT 2010) 52.214-29 Order of Precedence -- Sealed Bidding (JAN 1986) 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award/Alternate 1 (MAR 2020) 52.219-6 Notice of Total Small Business Set-Aside (MAR 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-14 Limitations on Subcontracting (MAR 2020) 52.219-28 Post-Award Small Business Program Representation. (MAR 2020)
140P6320B0009 WICA Bison Corrals Page 6 of 41
52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation. (MAY 2018) 52.222-6 Construction Wage Rate Requirements. (AUG 2018) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (AUG 2018) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014) 52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of Segregated Facilities. (APR 2015) 52.222-26 Equal Opportunity. (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-35 Equal Opportunity for Veterans. (OCT 2015) 52.222-36 – Equal Opportunity for Workers with Disabilities. (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-50 Combating Trafficking in Persons (JAN 2019) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items. (MAY 2008) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foam (JUN 2016) 52.225-9 Buy American Act - Construction Materials (MAY 2014) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-1 Bid Guarantee (SEP 1996) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance -- Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (DEVIATION APR 2020) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds -- Construction (DEVIATION APR 2020) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payment to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes. (MAY 2014) - Alternate I (DEC 1991)) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-8 Other Contracts -- (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984)
140P6320B0009 WICA Bison Corrals Page 7 of 41
52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) Documents Required Prior to Pre-Con Meeting 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (AUG 2019) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) & Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.252-2 Clauses Incorporated by Reference (FEB 1998) 52.252-6 Authorized Deviations in Clauses (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 1452.203-70 Restrictions on Endorsements (JUL 1996) 1452.204-70 Release of Claims (JUL 1996) 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (APR 1984) 1452.228-70 Liability Insurance (JUL 1996) Section J: List of Documents, Exhibits and Other Attachments Section K: Representations, Certifications, and Other Statements of Bidders 52.203-2 Certificate of Independent Price Determination (APR 1985) 52.204-8 Annual Representations and Certifications. (JAN 2020) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) Section L: Instructions, Conditions, and Notices to Bidders 52.204-7 System for Award Management (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (DEC 2019) 52.204-26 Covered Telecommunications Equipment or Services – Representation (DEC 2019) 52.209-7 Information Regarding Responsibility of Matters (OCT 2018) 52.209-9 Updates of Publicly Available Information Regarding Responsibility of Matters (OCT 2018) 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (JUN 1988) 52.214-3 Amendments to Invitations for Bids (DEC 2016) 52.214-4 False Statements in Bids (APR 1984) 52.214-5 Submission of Bids (DEC 2016) 52.214-6 Explanation to Prospective Bidders (APR 1984) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (NOV 1999) 52.214-12 Preparation of Bids (APR 1984) 52.214-18 Preparation of Bids -- Construction (APR 1984) 52.214-19 Contract Award -- Sealed Bidding -- Construction (AUG 1996) 52.214-34 Submission of Offers in the English Language (APR 1991) 52.214-35 Submission of Offers in U.S. Currency (APR 1991) 52.216-1 Type of Contract (APR 1984) 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014) 52.222-23 -- Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.225-10 Notice of Buy American Act Requirement - Construction Materials (MAY 2014) - Alternate I (May 2014) 52.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation) 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) 52.252-5 Authorized Deviations in Provisions (APR 1984)
BID DUE DATE
Section M: Evaluation Factors for Award
140P6320B0009 WICA Bison Corrals Page 8 of 41
140P6320B0009 WICA Bison Corrals Page 9 of 41
Section A: Solicitation/Contract Form
Invitation for Bids (IFB), 140P6320B0009, Solicitation for Replacement of Bison Corrals, foundations, and supply of metal building is issued on a Standard Form (SF) 1442, Solicitation, Offer, and Award document. Reference FAR 14.201-1 for Uniform Contract Format information.
Special Notice for Bidders
Signing of the bid shall be deemed to be a representation by the bidder that:
1.) Bidder is a construction contractor who owns, operates, or maintains a place of business, regularly engaged in construction, alteration, or repair of buildings and structures to include installation fence and welded corral structures; or
2.) If newly entering into a construction activity, bidder has made all necessary arrangements for personnel, construction equipment, and required licenses to perform construction work as specified; and
3.) Upon request, prior to award, bidder will promptly furnish to the Government a statement of facts in detail as to bidder’s previous experience (including recent and current contracts), organization (including company officers), technical qualifications, financial resources and facilities available to perform the contemplated work.
A Contracting Officer will be in the office on (bid opening date) starting at 9:00 AM MT to receive bids.
It's recommended that bids be mailed via the United States Postal Service (USPS) as to be delivered on or before the date of bid opening. Other delivery services not delivering to the USPS mailbox address provided for the NEKOTA MABO may be used if delivery will be on the date specified for bid opening and between 9:00 AM MT and the time designated for bid opening. Hand delivered bids may also be received on the date of bid opening between 9:00 AM MT and the time designated for bid opening.
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
Section B: Bid Schedule
Preparation of Bids: The Government will not be responsible for any costs incurred by offeror in the research, preparation, or submission of its bid.
Complete the Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20, and the attached Bid Schedule, (see Section J, Attachment 5). Bid schedule shall support total lump sum bid amount. Bidders shall include their SAM registered DUNS number in Block 14 of the SF1442 when submitting their offer. Offeror must include original signature of individual authorized to sign for the company. Indicate the lump sum (total) proposal price in Block 17. Contractor must also return elements/details contained in Bid Schedule attachment. A detailed breakdown of the offeror’s proposal price (e.g., labor, materials, profit, overhead, and other pricing elements) are not requested at this time; however, may be requested by the Contracting Officer during the pre-award process. Bidders must acknowledge all solicitation amendments when submitting final bids. Bid-bonds must be provided as originals with seals.
Because a Bid Guarantee is required, Bid packages will only be accepted in hard copy via hand delivery or mail/express delivery to the address in Block 8 (Keystone, SD) of the form SF1442. Electronic submissions will not be accepted.
Section C: Specifications/Drawings
See attached specifications and drawings for work outlined in block 10 of the SF 1442. Specifications and Drawings are attached and hereby incorporated into this section (see Section J).
Section D: Packaging and Marking
Not Applicable
Section E: Inspection and Acceptance
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
Final Inspection, Substantial Completion, and Acceptance Procedures
140P6320B0009 WICA Bison Corrals Page 10 of 41
(a) Request a final inspection in writing when a project or designated portion of a project is substantially complete. The Contracting Officer will proceed with the inspection within 10 days of receipt of the written request or will advise the Contractor of items that prevent the project from being substantially complete.
(b) If the work is determined to be substantially complete, following the final inspection. Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.
(c) If the work is not determined to be substantially complete following the final inspection, Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
(d) Contractor shall complete the Punch List within 30 calendar days, documented weather permitting unless the Contracting Officer agrees to a different time period.
(e) If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of Final Acceptance.
(f) If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
52.246-12 Inspection of Construction (AUG 1996)
52.246-21 Warranty of Construction. (MAR 1994)
Section F: Deliveries or Performance
Work shall be completed by skilled personnel per industry standards and manufacturer specifications.
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days from receiving the Notice to Proceed unless a different completion date is negotiated and approved by modification to the contract. The time stated for completion shall include phased demolition/installation of comfort stations so that only one station is out of service at a time. The government will accept and establish a warranty period for each building once inspected and accepted.
This also includes final cleanup of the premises.
(End of Clause)
52.236-15 Schedules for Construction Contracts (Apr 1984)
(a)The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b)The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c)Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a
140P6320B0009 WICA Bison Corrals Page 11 of 41 determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of Clause)
52.242-14 Suspension of Work. (APR 1984)
Section G: Contract Administration Data
The Contract Specialist administrating the Contract:
Ron Kesterson National Park Service-NEKOTA MABO 24290 Doane Mt Road.
Keystone, SD 57751
(605) 574-3183 ron_kesterson@nps.gov
The Contracting Officer:
Matthew Null National Park Service-NEKOTA MABO 24290 Doane Mt Road.
Keystone, SD 57751
(605) 574-3161 matthew_null@nps.gov
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
(d) Any request for contract changes/modifications shall be submitted to the CO.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. An example of a field change is: rerouting planned location of a sidewalk to avoid a tree (when quantities are not changed). All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
FINAL PAYMENT
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, and release of claims. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
AVAILABILITY OF UTILITIES SERVICES
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
UTILITIES CONSERVATION
mailto:ron_kesterson@nps.gov mailto:matthew_null@nps.gov
140P6320B0009 WICA Bison Corrals Page 12 of 41
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS
The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.
LEGAL HOLIDAYS
The following legal holidays are observed by the National Park Service:
New Year Day 1 January Martin Luther King Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November Thanksgiving Day 4th Thursday in November Christmas 25 December
Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holiday falling on Sunday will be observed on the following Monday.
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Payment Application submitted in compliance with approved Schedule of Values for Contracting Officers Approval.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb .org or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
1452.201-70 Authorities and delegations. (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
140P6320B0009 WICA Bison Corrals Page 13 of 41
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
Section H: Special Contract Requirements
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
52.236-2 Differing Site Conditions. (APR 1984)
(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of --
(1) Subsurface or latent physical conditions at the site which differ materially from those indicated in this contract; or
(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.
(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor’s cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.
(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in paragraph (a) of this clause for giving written notice may be extended by the Contracting Officer.
(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.
140P6320B0009 WICA Bison Corrals Page 14 of 41
(End of Clause)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to
(1) conditions bearing upon transportation, disposal, handling, and storage of materials;
(2) the availability of labor, water, electric power, and roads;
(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;
(4) the conformation and conditions of the ground; and
(5) the character of equipment and facilities needed preliminary to and during work performance.
The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
(End of Clause)
52.236-5 Material and Workmanship. (APR 1984)
(a)All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b)The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c)All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
52.236-7 Permits and Responsibilities. (NOV 1991)
140P6320B0009 WICA Bison Corrals Page 15 of 41
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
(End of Clause)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
(a)The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
(b)The Contractor shall protect from damage all existing improvements and utilities (1)at or near the work site, and (2)on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(End of Clause)
52.236-10 Operations and Storage Areas. (APR 1984)
(a)The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
(b)Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government.
The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
(c)The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(End of Clause)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
(a)The Government shall have the right to take possession of or use any completed or partially completed part of the work. Before taking possession of or using any work, the Contracting Officer shall furnish the Contractor a list of items of work remaining to be performed or corrected on those portions of the work that the Government intends to take possession of or use. However, failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government’s possession or use shall not be deemed an acceptance of any work under the contract.
(b)While the Government has such possession or use, the Contractor shall be relieved of the responsibility for the loss of or damage to the work resulting from the Government’s possession or use, notwithstanding the terms of the clause in this contract entitled “Permits and Responsibilities.” If prior possession or use by the Government delays the progress of the work or causes additional expense to the Contractor, an equitable adjustment shall be made in the contract price or the time of completion, and the
140P6320B0009 WICA Bison Corrals Page 16 of 41 contract shall be modified in writing accordingly.
(End of Clause)
52.236-12 Cleaning Up. (APR 1984)
The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
(End of Clause)
52.248-3 Value Engineering—Construction (Oct 2015)
Section I: Contract Clauses
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
52.202-1 Definitions (NOV 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018)
52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-14 Service Contract Reporting Requirements (OCT 2016)
52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016)
52.204-22 Alternative Line Item Proposal (JAN 2017)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
140P6320B0009 WICA…
This is the start of the file's text. The full file is on GovTribe.