Attachment_16_Revised_Cost_Estimate_Form_0001.xlsx
XLSX spreadsheet 52 KB Posted
- Attached to
- HOSP EXHIBIT FABRICATION Federal contract opportunity
- Solicitation number
- 140P2121R0054
About this file
This document contains an independent government cost estimate for exhibit fabrication services for Hot Springs National Park. The estimate provides projected labor and materials costs for a variety of exhibit components including structures, graphics, lighting, and custom elements. It also includes costs for project management, samples, electrical work, conservation, installation, shipping, and travel. The total estimated costs are not provided. The related federal contract opportunity is solicitation number 140P2121R0054 for exhibit fabrication services at Hot Springs National Park issued by the National Park Service within the Department of the Interior. The solicitation seeks fabrication of exhibits to convey the history and significance of hot springs to visitors. The estimate provides contractors with details to inform their responses to the solicitation by outlining the government's estimated costs for the individual elements required.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est
| ATTACHMENT 16 - Fabrication Independent Government Estimate | |||||
| Labor | Materials | Totals | |||
| PROJECT MANAGEMENT | $0.00 | $0.00 | |||
| FABRICATION DRAWINGS | $0.00 | $0.00 | $0.00 | ||
| SAMPLES | $0.00 | $0.00 | $0.00 | ||
| LIGHTING | $0.00 | $0.00 | $0.00 | ||
| EXHIBIT STRUCTURES | $0.00 | $0.00 | $0.00 | ||
| CUSTOM ELEMENTS | $0.00 | $0.00 | $0.00 | ||
| ELECTRICAL/ ELECTRONIC | $0.00 | $0.00 | $0.00 | ||
| GRAPHICS | $0.00 | $0.00 | $0.00 | ||
| CONSERVATION | $0.00 | $0.00 | $0.00 | ||
| PROJECT CLOSEOUT | $0.00 | $0.00 | $0.00 | ||
| SHIPPING | $0.00 | $0.00 | $0.00 | ||
| INSTALLATION | $0.00 | $0.00 | $0.00 | ||
| TRAVEL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| Grand Total | $0 |
| PROJECT MANAGEMENT (excluding travel) | ||||
| LABOR | hours | x | rate | amount |
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| graphic samples | job | $0.00 | |||
| graphic samples-color proofs | job | $0.00 | |||
| custom elements samples | job | $0.00 | |||
| prototypes | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Samples $0.00
| Lighting | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Scene 1 LSI LED Track Fixture (SSL230-00) 120V white finish w/ PAR 30 LED Lamps | Each | $0.00 | |||
| Scene 2 LSI LED Track Fixture (SSL230-00) 120V white finish w/ PAR 30 LED Lamps | Each | $0.00 | |||
| Scene 3 LSI LED Track Fixture (SSL230-00) 120V white finish w/ PAR 30 LED Lamps | Each | $0.00 | |||
| Scene 4 LSI LED Track Fixture (SSL230-00) 120V white finish w/ PAR 30 LED Lamps | Each | $0.00 | |||
| Scene 1 Lamps PAR 30 LEDs 120 volt | Each | $0.00 | |||
| Scene 2 Lamps PAR 30 LEDs 120 volt | Each | $0.00 | |||
| Scene 3 Lamps PAR 30 LEDs 120 volt | Each | $0.00 | |||
| Scene 4 Lamps PAR 30 LEDs 120 volt | Each | $0.00 | |||
| Scene 1 LSI 2-Circuit Track, white finish | per foot | $0.00 | |||
| Scene 2 LSI 2-Circuit Track, white finish | per foot | $0.00 | |||
| Scene 3 LSI 2-Circuit Track, white finish | per foot | $0.00 | |||
| Scene 4 LSI 2-Circuit Track, white finish | per foot | $0.00 | |||
| LSI end feeds | each | $0.00 | |||
| LSI joiners/feeders | each | $0.00 | |||
| LSI end caps | each | $0.00 | |||
| Scissor Lift rental | Week | $0.00 | |||
| Scissor Lift Delivery | PU/Ret | $0.00 |
| SUBTOTAL, AV EQUIPMENT | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Lighting $0.00
| Exhibit Structures | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 0 | ST-00.01-100 Exhibit Signage Assembly | Job | $0.00 | ||
| ST-00.02-100 Exhibit Signage Assembly | Job | $0.00 | |||
| ST-00.02-110 Exhibit Signage Assembly | Job | $0.00 | |||
| 1 | ST-01.01-100 A Natural Wonder Panel Structure | Job | $0.00 | ||
| ST-01.01-110 Fordyce Rail Structure | Job | $0.00 | |||
| ST-01.02-100 Hot Water Naturally Rail Structure with specimens | Job | $0.00 | |||
| ST-01.02-400 Topo/Cut Away Model, Mural Backdrop, Structure, Light program | Job | $0.00 | |||
| ST-01.02-110 Valley of the Vapors Panel Structure w/ wall-mounted CA-01.02-310 + CA-01.02-311 | Job | $0.00 | |||
| ST-01.03-100 How Much Water Panel Structure | Job | $0.00 | |||
| ST-01.03-110 Bathtubs Per Day Panel Structure with mini bathtubs | Job | $0.00 | |||
| ST-01.03-120 A Delicate Balance Rail Structure | Job | $0.00 | |||
| ST-01.04-100 A Very Special Liquid Panel Structure | Job | $0.00 | |||
| ST-01.04-110 Hunter & Dunbar Rail Structure | Job | $0.00 | |||
| CA-01.04-312 Freestanding Case and 3 labels | Job | $0.00 | |||
| ST-01.05-100 Mural Structure | Job | $0.00 | |||
| 2 | ST-02.01-100 Becoming a Community Panel Structure | Job | $0.00 | ||
| ST-02.01-110 Early Bathhouses Rail Structure | Job | $0.00 | |||
| ST-02.02-100 The Waters of Change Panel Structure | Job | $0.00 | |||
| ST-02.02-110 Celebrities at Hot Springs Rail Structure | Job | $0.00 | |||
| ST-02.02-120 Mural Structure | Job | $0.00 | |||
| CA-02.02-320 Freestanding Case and 3 labels | Job | $0.00 | |||
| ST-02.03-100 Bathhouse Row Display Table, Model, Rail CA-02.03-321 w/ 8 Dbl Sided Flip Doors | Job | $0.00 | |||
| ST-02.04-100 Channeling the Water Diagram Interactive Structure | Job | $0.00 | |||
| ST-02.05-510 Postcards from the Springs Layered Graphic and Video Show Structure | Job | $0.00 | |||
| ST-02.06-100 Theater Sign Assembly | Job | $0.00 | |||
| 3 | ST-03.01-100 Healing Prescriptions of Hot Springs Structure with base and figures | Job | $0.00 | ||
| ST-03.01-412 Doctor's Orders 16 Panels Assembly to Locker Wall | Job | $0.00 | |||
| ST-03.02-100 A Place to Get Well, Harry Hallock Panels Assembly to ST-03.02-120 | Job | $0.00 | |||
| ST-03.02-120 Rx: Meet Someone New Structure | Job | $0.00 | |||
| ST-03.02-130 Graphic Backdrop/Mural Panel Structure | Job | $0.00 | |||
| CA-03.02-330 Table Case and 4 labels | Job | $0.00 | |||
| ST-03.02-140 Rx: Head to the Gym Structure with base and figure, Pedestal CA-03.02-331 + 1 label | Job | $0.00 | |||
| ST-03.02-150 Zander Machines with interactive, Gustav Zander Panels Assembly to ST-03.02-140 | Job | $0.00 | |||
| ST-03.03-100 Rx: Take a Therapeutic Soak Backdrop Panel Structure | Job | $0.00 | |||
| CA-03.03-332 Table Case and 6 labels | Job | $0.00 | |||
| ST-03.04-100 Rx: "Taking the Waters" Structure with figure and bench | Job | $0.00 | |||
| ST-03.05-100 Rx: Drink More Water Backdrop Panel Structure | Job | $0.00 | |||
| CA-03.05-333 Table Case and 4 labels | Job | $0.00 | |||
| ST-03.06-100 Rx: Hiking the Oertel Trail, Charles Cutter Panels Assembly to ST-03.06-120 | Job | $0.00 | |||
| ST-03.06-120 Rx: Head Outdoors Structure with base, figure, and viewfinder interactives | Job | $0.00 | |||
| ST-03.06-130 Graphic Backdrop/Mural Panel Structure | Job | $0.00 | |||
| CA-03.06-334 Table Case with 6 labels | Job | $0.00 | |||
| ST-03.06-140 Rx: Strike Up a Conversation Structure with checkers interactive | Job | $0.00 | |||
| ST-03.06-150 Rx: Take in the View, Capturing Hot Springs Panels Assembly to ST-03.06-140 | Job | $0.00 | |||
| ST-03.07-100 Stained Glass (Replica) and label Assembly | Job | $0.00 | |||
| 4 | ST-04.01-100 Access Through the Ages Panel Structure | Job | $0.00 | ||
| ST-04.01-110 Visitor Feedback Display Case and Rail Structure | Job | $0.00 | |||
| ST-04.02-100 A Divided Community Panel Structure | Job | $0.00 | |||
| ST-04.02-110 The Foundation of Bathhouse Row Rail Structure | Job | $0.00 | |||
| ST-04.02-120 A Bathhouse of Their Own Rail Structure | Job | $0.00 | |||
| CA-04.02-340 Freestanding Case and 9 labels | Job | $0.00 | |||
| ST-04.03-100 A Legacy of Service Panel Structure | Job | $0.00 | |||
| ST-04.03-110 Dr. Algernon Garnett Rail Structure | Job | $0.00 | |||
| ST-04.04-100 Camps of Necessity Panel Structure | Job | $0.00 | |||
| ST-04.04-110 Life at Ral City Rail Structure | Job | $0.00 | |||
| ST-04.04-120 Benjamin Kelley Rail Structure | Job | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Custom Elements | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| CE-01.02-400 Tactile Topographic Cross Section Model associated w/ EP-01.02-500 | Element | $0.00 | |||
| CE-01.03-401 Mini Cast Resin Bathtubs (13) Fabricated Prop | Element | $0.00 | |||
| CE-02.03-402 Tactile Model of Bathhouse Row | Element | $0.00 | |||
| CE-02.04-403 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-02.04-404 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-02.04-405 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-02.04-406 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-02.04-407 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-02.04-408 Bath Fixture Handle Prop associated w/ EP-02.04-520 | Element | $0.00 | |||
| CE-03.01-410 Patient Life-size figure | Element | $0.00 | |||
| CE-03.01-411 Doctor Life-size figure | Element | $0.00 | |||
| CE-03.01-412 Locker Wall Reproduction Historic Object | Element | $0.00 | |||
| CE-00.02-413 Man exercising Life-size figure | Element | $0.00 | |||
| CE-03.02-414 Zander machine interactive operable reproduction historic object | Element | $0.00 | |||
| CE-03.04-415 Photo Op Figure life-size figure | Element | $0.00 | |||
| CE-03.04-416 Photo Op Structure inspired by historic object | Element | $0.00 | |||
| CE-03.06-417 Viewfinder Fabricated Prop | Element | $0.00 | |||
| CE-03.06-418 Viewfinder Fabricated Prop | Element | $0.00 | |||
| CE‐03.06‐419 Historic Hiking Figure life-size figure | Element | $0.00 | |||
| CE-03.06-420 Chair at checkers table, off-the-shelf furniture | Element | $0.00 | |||
| CE-03.06-421 Chair at checkers table, off-the-shelf furniture | Element | $0.00 | |||
| CE-03.06-422 Repro checkers table, off-the-shelf furniture with applied checkerboard and label | Element | $0.00 | |||
| CE-03.07-423 Tiffany glass window replica Reproduction historic object | Element | $0.00 | |||
| CE-03.00-424 Wood garden bench, off-the shelf furniture | Element | $0.00 | |||
| CE-03.00-425 Wood garden bench, off-the shelf furniture | Element | $0.00 | |||
| CE-03.00-426 Wood garden bench, off-the shelf furniture | Element | $0.00 | |||
| CE-03.06-427 Tactile Checkers Set (2 total) | Element | $0.00 | |||
| IM-01.05-101 Custom Photography for GL-01.05-100 freestanding mural | Element | $0.00 | |||
| IM-02.02-121 Custom Photography for GL-02.02-120 freestanding mural | Element | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
TOTAL CE $0.00
| Electrical/Electronic | |||||
| MATERIALS - AV EQUIPMENT: | qty. | unit | unit cost | amount | |
| EP-00.00-100 Audio Description | |||||
| Beacons | each | $0.00 | |||
| Headphone cushion sanitary cover, black, 50 pair | each | $0.00 | |||
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | each | $0.00 | |||
| Headphones | each | $0.00 | |||
| Induction neckloop | each | $0.00 | |||
| iPhone XR, black, 128GB, unlocked sim-free | each | $0.00 | |||
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | each | $0.00 | |||
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | each | $0.00 | |||
| Refresh Kit, replacement cushion and bag | each | $0.00 | |||
| Ruggedized case for media player | each | $0.00 | |||
| Sreen Protector for media player | each | $0.00 | |||
| USB charging station, 6 ports, 6 Apple cables, white | each | $0.00 | |||
| EP-01.20-500 Hot Water Naturally | |||||
| Push button | each | $0.00 | |||
| wiring/connectors | each | $0.00 | |||
| LED tape lights | each | $0.00 | |||
| dimmable driver | each | $0.00 | |||
| 4-input LED controller | each | $0.00 | |||
| EP-02.04-520 Channeling the Water | |||||
| LED tape lights | each | $0.00 | |||
| 1 | wiring/connectors | each | $0.00 | ||
| dimmable driver | each | $0.00 | |||
| 8-way splitter | each | $0.00 | |||
| infrared on/off switch | each | $0.00 | |||
| EP-02.05-510 Postcards from the Springs | |||||
| Samsung DB32D 32" all-in-one screen | each | $0.00 | |||
| BrightSign XD234 | each | $0.00 | |||
| wiring/connectors | each | $0.00 |
| SUBTOTAL, AV EQUIPMENT | ||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR (Production) | hours | x | rate | amount | |
| EP-00.00-100 Audio Description | Project | $0.00 | |||
| EP-01.20-500 Hot Water Naturally | Project | $0.00 | |||
| EP-02.04-520 Channeling the Water | Project | $0.00 | |||
| EP-02.05-510 Postcards from the Springs | Project | $0.00 |
TOTAL ALL LABOR (see AV Estimate for Detail) $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 0 | GL-00.01-100 Exhibit Sign | Job | $0.00 | ||
| GL-00.02-100 Exhibit Sign | Job | $0.00 | |||
| GL-00.02-110 Exhibit Sign | Job | $0.00 | |||
| 1 | GL-01.01-100 A Natural Wonder | Job | $0.00 | ||
| GL-01.01-110 Fordyce | Job | $0.00 | |||
| GL-01.02-100 Hot Water Naturally | Job | $0.00 | |||
| GL-01.02-110 Valley of the Vapors | Job | $0.00 | |||
| GL-01.02-120 Mural: Model Backdrop | Job | $0.00 | |||
| GL-01.03-100 How Much Water | Job | $0.00 | |||
| GL-01.03-110 Aside Panel | Job | $0.00 | |||
| GL-01.03-120 A Delicate Balance | Job | $0.00 | |||
| GL-01.04-100 A Very Special Liquid | Job | $0.00 | |||
| GL-01.04-110 Hunter & Dunbar | Job | $0.00 | |||
| GL-01.04-205 Label: Pipe Sections | Job | $0.00 | |||
| GL-01.04-206 Label: Calcite Deposit | Job | $0.00 | |||
| GL-01.04-207 Label: Water Pipe Insulator | Job | $0.00 | |||
| GL-01.05-100 Mural of Natural Scene | Job | $0.00 | |||
| 2 | GL-02.01-100 Becoming a Community | Job | $0.00 | ||
| GL-02.01-110 Early Bathhouses | Job | $0.00 | |||
| GL-02.02-100 The Waters of Change | Job | $0.00 | |||
| GL-02.02-110 Celebrities at Hot Springs | Job | $0.00 | |||
| GL-02.02-120 Mural | Job | $0.00 | |||
| GL-02.02-208 Label: Architectural Ornament | Job | $0.00 | |||
| GL-02.02-209 Label: Ornament Capital | Job | $0.00 | |||
| GL-02.02-215 Label: Tile | Job | $0.00 | |||
| GL-02.03-100 Magnificent Bathhouse Row | Job | $0.00 | |||
| GL-02.03-110 Flip Panel | Job | $0.00 | |||
| GL-02.03-115 Flip Panel | Job | $0.00 | |||
| GL-02.03-120 Flip Panel | Job | $0.00 | |||
| GL-02.03-125 Flip Panel | Job | $0.00 | |||
| GL-02.03-130 Flip Panel | Job | $0.00 | |||
| GL-02.03-135 Flip Panel | Job | $0.00 | |||
| GL-02.03-140 Flip Panel | Job | $0.00 | |||
| GL-02.03-145 Flip Panel | Job | $0.00 | |||
| GL-02.03-150 Flip Panel | Job | $0.00 | |||
| GL-02.03-155 Flip Panel | Job | $0.00 | |||
| GL-02.03-160 Flip Panel | Job | $0.00 | |||
| GL-02.03-165 Flip Panel | Job | $0.00 | |||
| GL-02.03-170 Flip Panel | Job | $0.00 | |||
| GL-02.03-175 Flip Panel | Job | $0.00 | |||
| GL-02.03-180 Flip Panel | Job | $0.00 | |||
| GL-02.03-185 Flip Panel | Job | $0.00 | |||
| GL-02.04-100 Channeling the Water | Job | $0.00 | |||
| GL-02.04-110 Channeling Diagram | Job | $0.00 | |||
| GL-02.05-100 Postcard Panel | Job | $0.00 | |||
| GL-02.05-101 Postcard Panel | Job | $0.00 | |||
| GL-02.05-102 Postcard Panel | Job | $0.00 | |||
| GL-02.05-103 Postcard Panel | Job | $0.00 | |||
| GL-02.05-104 Postcard Panel | Job | $0.00 | |||
| GL-02.05-105 Postcard Panel | Job | $0.00 | |||
| GL-02.05-106 Postcard Panel | Job | $0.00 | |||
| GL-02.05-107 Postcard Panel | Job | $0.00 | |||
| GL-02.05-108 Postcard Panel | Job | $0.00 | |||
| GL-02.05-109 Postcard Panel | Job | $0.00 | |||
| GL-02.05-110 Postcard Panel | Job | $0.00 | |||
| GL-02.05-111 Postcard Panel | Job | $0.00 | |||
| GL-02.06-100 Theater Sign | Job | $0.00 | |||
| 3 | GL-03.01-100 Healing Prescriptions of Hot Springs | Job | $0.00 | ||
| GL-03.01-110 Lockers Intro Panel | Job | $0.00 | |||
| GL-03.01-120 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-125 Locker Inside Panel | Job | $0.00 | |||
| GL-03.01-130 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-135 Locker Inside Panel | Job | $0.00 | |||
| GL-03.01-140 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-145 Locker Inside Panel | Job | $0.00 | |||
| GL-03.01-150 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-155 Locker Inside Panel | Job | $0.00 | |||
| GL-03.01-160 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-165 Locker Inside Panel | Job | $0.00 | |||
| GL-03.01-170 Locker Outside Panel | Job | $0.00 | |||
| GL-03.01-175 Locker Inside Panel | Job | $0.00 | |||
| GL-03.02-100 A Place to Get Well | Job | $0.00 | |||
| GL-03.02-110 Harry Hallcok | Job | $0.00 | |||
| GL-03.02-120 Rx: Meet Someone New | Job | $0.00 | |||
| GL-03.02-130 Graphic Backdrop | Job | $0.00 | |||
| GL-03.02-140 Rx: Head to the Gym | Job | $0.00 | |||
| GL-03.02-150 The Zander Machine | Job | $0.00 | |||
| GL-03.02-160 Gustav Zander | Job | $0.00 | |||
| GL-03.02-218 Label: Indian Clubs | Job | $0.00 | |||
| GL-03.02-219 Label: Medicine Ball | Job | $0.00 | |||
| GL-03.02-220 Label: Dumbbells | Job | $0.00 | |||
| GL-03.02-221 Label: Calisthentics Wand | Job | $0.00 | |||
| GL-03.02-222 Label: How Do They Use It? | Job | $0.00 | |||
| GL-03.03-100 Take a Therapeutic Soak | Job | $0.00 | |||
| GL-03.03-223 Bath Mitts | Job | $0.00 | |||
| GL-03.03-224 Leg Braces | Job | $0.00 | |||
| GL-03.03-225 Bathhouse Signs | Job | $0.00 | |||
| GL-03.03-227 Label: Ointment and Medicine Bottles | Job | $0.00 | |||
| GL-03.03-229 Label: Thermometers | Job | $0.00 | |||
| GL-03.03-230 Label: Bath Towel | Job | $0.00 | |||
| GL-03.04-100 Rx: "Taking the Waters" | Job | $0.00 | |||
| GL-03.05-100 Rx: Drink More Water | Job | $0.00 | |||
| GL-03.03-231 Label: Collapsible Cup | Job | $0.00 | |||
| GL-03.03-232 Label: Cup Holders | Job | $0.00 | |||
| GL-03.03-235 Label: Bottled Water | Job | $0.00 | |||
| GL-03.03-236 Label: Water Jugs | Job | $0.00 | |||
| GL-03.06-100 Rx: Hiking the Oertel Trail | Job | $0.00 | |||
| GL-03.06-110 Charles Cutter | Job | $0.00 | |||
| GL-03.06-120 Rx: Head Outdoors | Job | $0.00 | |||
| GL-03.06-125 Viewfinder Image | Job | $0.00 | |||
| GL-03.06-130 Graphic Backdrop | Job | $0.00 | |||
| GL-03.06-135 Viewfinder Image | Job | $0.00 | |||
| GL-03.06-140 Rx: Strike Up a Conversation | Job | $0.00 | |||
| GL-03.06-150 Rx: Take in the View | Job | $0.00 | |||
| GL-03.06-160 Capturing Hot Springs | Job | $0.00 | |||
| GL-03.06-239 Label: Oertel Trail Marker | Job | $0.00 | |||
| GL-03.06-240 Label: Oertel Trail Map | Job | $0.00 | |||
| GL-03.06-241 Label: Woman's Boots | Job | $0.00 | |||
| GL-03.06-242 Label: Man's Boots | Job | $0.00 | |||
| GL-03.06-243 Label: Straw Hat | Job | $0.00 | |||
| GL-03.06-263 Label: Nature Guide | Job | $0.00 | |||
| GL-03.07-100 Label: Stained Glass (Replica) | Job | $0.00 | |||
| 4 | GL-04.01-100 Access Through the Ages | Job | $0.00 | ||
| GL-04.01-110 Visitor Feedback Question | Job | $0.00 | |||
| GL-04.02-100 A Divided Community | Job | $0.00 | |||
| GL-04.02-110 The Foundation of Bathhouse Row | Job | $0.00 | |||
| GL-04.02-120 A Bathhouse of Their Own | Job | $0.00 | |||
| GL-04.02-241 Label: Key Ring | Job | $0.00 | |||
| GL-04.02-242 Label: Tokens | Job | $0.00 | |||
| GL-04.02-243 Label: Textbooks | Job | $0.00 | |||
| GL-04.02-244 Label: Bathhouse Postcard | Job | $0.00 | |||
| GL-04.02-245 Label: T-Shirt | Job | $0.00 | |||
| GL-04.02-246 Label: Attendant's Pin | Job | $0.00 | |||
| GL-04.02-247 Label: Tags | Job | $0.00 | |||
| GL-04.02-248 Label: Nameplates | Job | $0.00 | |||
| GL-04.02-265 Label: Segregation Notice | Job | $0.00 | |||
| GL-04.03-100 A Legacy of Service | Job | $0.00 | |||
| GL-04.03-110 Dr. Algernon Garnett | Job | $0.00 | |||
| GL-04.04-100 Camps of Necessity | Job | $0.00 | |||
| GL-04.04-110 Life at Ral City | Job | $0.00 | |||
| GL-04.04-120 Benjamin Kelley | Job | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| CA-01.02-310 | job | $0.00 | |||
| CA.01-02-311 | job | $0.00 | |||
| CA-01.04-312 | job | $0.00 | |||
| CA-02.02-320 | job | $0.00 | |||
| CA-02.03-321 | job | $0.00 | |||
| CA-03.02-330 | job | $0.00 | |||
| CA-03.02-331 | job | $0.00 | |||
| CA-03.03-332 | job | $0.00 | |||
| CA-03.05.333 | job | $0.00 | |||
| CA-03.06-334 | job | $0.00 | |||
| CA-04.02-340 | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| hours @ | $0.00 | ||||
| hours | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| job @ | $0.00 | |||
| truck | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount |
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
| INSTALLATION | |||||
| Project Manager | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | Ticket | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Rental Van and Gas | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| Total | $0.00 |
| LABOR | hours | x | rate | amount |
| hours @ | $0.00 |
| Total Travel and Accomodation for: Project Manager | $0.00 | ||||
| Fabrication Installers | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Ticket | $0.00 | ||||
| days @ | $0.00 | ||||
| days @ | $0.00 | ||||
| $0.00 | |||||
| LABOR | |||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| Total | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| Lighting Specialists | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | Ticket | $0.00 | |||
| Rental Car and Gas | days @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| $0.00 | |||||
| LABOR | |||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| Total | $0.00 |
Total Travel and Accomodation for: Lighting $0.00
| Exhibit AV Specialist | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | Ticket | $0.00 | |||
| Rental Car and Gas | days@ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| $0.00 | |||||
| LABOR | |||||
| hours @ | $0.00 | ||||
| Total | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
| Object Mounter and Installer | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | Ticket | $0.00 | |||
| Rental Car and gas | days @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| $0.00 | |||||
| LABOR | |||||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| $0.00 |
Total Travel and Accomodation for: Object Installer $0.00
TOTAL ALL MATERIALS: INSTALLATION $0.00
TOTAL ALL LABOR: INSTALLATION $0.00
Total Installation $0.00
| OTHER TRAVEL | |||||
| Postaward meeting | |||||
| MATERIALS: | |||||
| qty. | unit | unit cost | amount | ||
| air fare | Ticket | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Rental Van and Gas | days @ | $0.00 | |||
| Lodging | days @ | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| LABOR | hours | x | rate | amount |
| hours @ | $0.00 | |||
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
| Building Prep Site Visit | |||||
| MATERIALS: | |||||
| qty. | unit | unit cost | amount | ||
| air fare | Ticket | $0.00 | |||
| per diem | days @ | $0.00 | |||
| lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| LABOR | hours | x | rate | amount |
| hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Travel $0.00
File details come from the government source that posted it. Updated .