Amendment 1 - Site Visit Attendees_0001.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
GRTE Rehabilitate Moran Water System Federal contract opportunity
Solicitation number
140P1420R0006
Issued by
Department of the Interior National Park Service Intermountain Region

About this file

This solicitation is for a construction contract to rehabilitate the Moran water system in Grand Teton National Park. The work includes installing a new well house, water and sewer lines, wells, demolition of existing infrastructure, and related construction activities. The contract is set aside for women-owned small businesses with a NAICS code of 237110. Bonds of 100% are required and Davis Bacon wage rates apply. The estimated value is between $1,000,000 to $5,000,000. The performance period to complete the work is from within 10 days of notice to proceed through July 1, 2021. A site visit is scheduled and offerors must be registered in SAM with current representations and certifications. Questions regarding this solicitation must be submitted in writing by a specified date prior to offers being due.

View the file

Other files for this federal contract opportunity

Other files attached to GRTE Rehabilitate Moran Water System, newest first.
File Type Posted
Amendment 5 WOSB Clarification_0005.docx DOCX document
Sol_140P1420R0006_Amd_0005.pdf PDF
Amendment 4 New Sheet L1 2 11242020_0004.pdf PDF
Amendment 4 Definitions of CLINs rev 11252020_0004.pdf PDF
Amendment 4 Revised Price Schedule_0004.docx DOCX document
Sol_140P1420R0006_Amd_0004.pdf PDF
Amendment 4 Revised Sheet C1 8 Rev 11252020_0004.pdf PDF
Amendment 4 Q and A_0004.docx DOCX document
Amendment 3 C3.0 11192020_0003.pdf PDF
Amendment 3 Q and A 11192020_0003.docx DOCX document
Sol_140P1420R0006_Amd_0003.pdf PDF
Sol_140P1420R0006_Amd_0002.pdf PDF
Amendment 2 - Q and A_0002.docx DOCX document
Amendment 2 - Site Visit Attendees with Emails_0002.xlsx XLSX spreadsheet
Sol_140P1420R0006_Amd_0001.pdf PDF
Amendment 1 - SRLC C-200 preliminary revisions_0001.pdf PDF
Amendment 1 - COR Site Visit Note and Clarifications_0001.pdf PDF
Amendment 1 - Moran Junction Monitor Well log forms_0001.pdf PDF
A06 Attachment 5 As Builts GRTE 136 3527A id144427.pdf PDF
A06 Attachment 4 Drawings.zip ZIP file
A06 Attachment 3 Construction Drawings 136 150563 10142020.pdf PDF
A06 Attachment 2 SPECS PART 2 MORAN 198970 249646 09032020.pdf PDF
A06 Attachment 7 Moran Well House Geotech Report.pdf PDF
B03 Attachment 9 Teton County Building WD - WY20200017 08142020.pdf PDF
A06 Attachment 6 Current well UW 6.pdf PDF
B08 Attachment 10 Past Performance Questionnaire.docx DOCX document
A06 Attachment 1 SPECS PART 1 MORAN 198970 249646 09032020.pdf PDF
B08 Attachment 11 Subcontracting Worksheet.xlsx XLSX spreadsheet
A06 Attachment 8 SRLC Office Geotech Report.pdf PDF
Sol_140P1420R0006.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ContractorPOC
Eagle Rock TimberKim Dineen
Evans ConstructionFernando
FC ExcavationJosh Frappart, Danny
HD Inc.Jesse Harris
J&J Excavating & TruckingTristan Russell
JR CivilDana Babcock
MC2Chris Crow
PGB, LLCMary Luisi
RJSDan Passolt, Rick Andrews
Taylor Construction, Inc.Chelsea Paul
Weber DrillingRoy Weber
WestforkPaul

Sheet2

bid bond note
correct end date on 1442
trees removal, not replacing
old system abandoned, left in place
capping lines
leech field and septic not included
items removed from SRLC
yard hydrant not ada

File details come from the government source that posted it. Updated .