This document provides specifications for an asphalt seal coat project for the National Interagency Fire Center campus in Boise, Idaho. The Bureau of Land Management seeks to renew and seal the existing asphalt concrete pavement surface across campus parking lots and roadways through the application of a sand slurry, followed by line striping to reestablish parking and roadway areas. Offerors are to provide emulsified asphalt, aggregate cover material meeting specified gradation and cleanliness requirements, and waterborne pavement paint conforming to federal specifications. The period of performance is 90 days from notice to proceed, though contractors may need to perform the work in 2024 due to scheduling. Bidders must demonstrate five years of relevant experience and submit product data, mix designs, and a project schedule at least one week prior to the revised response deadline of August 29, 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3723R0011 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LFA

BOISE ID 83705

3833 S. DEVELOPMENT AVE.

BLM FA-NTL INTRAGCY FIRE CTR(FA250)

08/21/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/24/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: NIFC Campus Asphalt Seal Coat

The purpose of this amendment is to:

1. Provide site visit roster (1 page).

2. Provide vendor questions with responses (2 pages).

3. Provide updated specifications dated 11 August 2023 (7 pages).

4. Extend response due date to August 29, 2023 at 11 AM MT.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Matthew Steele

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L3723R0011/0001

This amendment must be acknowledged in accordance with the solicitation.

All other terms and conditions set forth within this solicitation remain unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

Fire and Aviation 3833 S Development Ave

Boise, Idaho 83705-5354

POST SITE VISIT Q&A August 18, 2023

NIFC Campus Asphalt Seal Coat Solicitation Number 140L3723R0011

CONTRACTOR QUESTIONS GOVERNMENT RESPONSE

1. The project Period of performance is set at 90 days from notice to proceed with this performance period being negotiable. Most asphalt maintenance contractors are busy this year and will not be able to perform the work until 2024. Depending on when this project is awarded, contractors may not be able to perform the work due to temperature, and or get seal coat material from their manufacturers until 2024. Will the government accept a schedule that represents this work being performed in the late spring of 2024?

1. Period of Performance is set to 90 days as stated in the specifications. Government will take review time of year when notice to proceed is issued.

2. The prologue states that the contractor will be required to provide safety barriers and occupant safety. What is the expectation here? Will the contractor be required to fence off the entire campus? Or just areas where the work is being performed?

2. Refer to the documents for the sections of work to be performed at one time. Safety barriers shall be provided for the area of work being performed.

3. At the site visit there was mention of Saturday work. Will this be a requirement or just an option to the contractor?

3. Saturday work is an option due to less traffic on campus.

4. With this project taking place while the NIFC campus remains operational and fully functional, will the contractor be required to phase this project to only shut down one side of the road at a time?

4. Please refer to the documents for sections of work to be performed.

5. Solicitation page 16 H‐2 Fire Danger Season states “If the contracting officer representative (COR) allows the contractor to continue work during periods of declared fire danger season, the contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.” What state laws are applicable for this project related to

5. H‐2 Fire Danger Season is not applicable to this solicitation/project and is hereby rescinded.

fire danger? What special conditions may arise as a result of fire danger season?

6. The plans call for seal coat in all locations of the project area with striping to go over the top. The specifications describe the scope of work as chip seal, with striping over the top and no seal coat.

Should the contractor bid to perform chip seal and striping, or seal coat and striping? If the government would like seal coat, please provide a new specification. If the government would like chip seal, please clarify if the contractor should bid to seal coat the chip seal prior to striping.

Chip seal with seal coat and striping

Chip seal with Striping

Seal Coat with Striping

6. See Amended documents.

NIFC Campus Asphalt Seal Coat 11AUGUST2023

PART 1 – GENERAL INFORMATION

A. Summary: The Bureau of Land Management, National Interagency Fire Center (NIFC), located at 3833 S. Development Avenue, Boise, Idaho, 83705, has a requirement for an application of sand slurry applied to the existing asphalt concrete pavement surface to renew and seal the surface. Following the slurry seal process, line striping will be performed to re-stablish the campus parking and roadway areas.

This document specifies the characteristics of the material and details the application workmanship.

B. The campus surface parking is comprised of asphalt concrete (AC) surfacing in a combination of parking lots and roadways. The AC surfacing has received miscellaneous patches and sealcoat throughout the years with no formal materials used. The surface is used by passenger vehicles, semi-trucks, and equipment such as forklifts.

C. Work will be done throughout the campus over consecutive days to allow Government to move vehicles and equipment from one area to the next. Contractor will coordinate with COR to ensure government vehicles and equipment are moved.

D. Administration: Overall administration of this contract shall be by the Contracting Officer (CO). The CO will appoint a Contracting Officer Representative (COR) to manage the detailed activities of the contract.

E. Installer qualifications: Work shall be accomplished by companies demonstrating 5 years of sealcoating experience in the State of Idaho.

F. SUBMITTALS:

1. Contractor shall submit product data to the Government for review. Submit package a minimum of 1 week prior to scheduled work start date. Allow Government 5 business days to review. Contractor shall not proceed with replacement until receipt of reviewed submittals from the government.

2. Submittal Package shall include:

(a) Seal coat materials: asphalt type and grade, anti-strip additives, cover coat material.

(b) Test results indicating:

i) Cover coat material does not show a loss of more than 40 when tested in accordance with AASHTO T 96 Los Angles Abrasion Testing, Gradation C.

ii) Cover coat material has retained asphalt film above 95 percent when tested in accordance with AASHTO T 182. Aggregates not meeting this requirement may be used in combination with an antistrip agent, providing the combination meets the 95 percent requirement.

(c) Pavement paint manufacturers certification that paints and beads meet or exceeds specified requirements.

(d) Project Schedule, describing at a minimum; start date, work schedule for each parking lot/roadway, weekend and holiday work expected and total project length.

G. Attachments

1. See Drawings for maps of the Existing Campus

PART 2 – PRODUCTS

A. EMULSIFIED ASPHALT

1. Seal coat – Provide CSS-1, CSS-1h, or HFRS-P1 Emulsified Asphalt for the seal coat.

2. Anti-Strip additive – Product as required to meet the project requirements.

B. MINERAL FILLER

1. Portland cement, hydrated lime, limestone dust, fly ash, or other approved filler meeting the requirements of ASTM D242 shall be used if required by the mix design. They shall be considered as part of the dry aggregate.

C. ADDITIVES

1. Additives may be used to accelerate or retard the break-set of the slurry seal or to improve the resulting finished surface. The use of additives in the slurry mix (or individual materials) shall be made initially in quantities predetermined by the mix design with field adjustments approved by government representative.

D. AGGREGATE MATERIAL

1. Furnish Aggregate cover material consisting of crushed or uncrushed Rock free of Clay, loam or other harmful substances and meeting the following gradation. Sieve analysis will be determined according to AASHTO T 27.

Table 1. Cover Coat Material Gradation Sieve Size Percent Passing

(By Weight) 3/8” 100 No. 4 100 No. 8 90 - 100 No. 30 40 - 65 No. 100 15 – 30 No. 200 10 - 20

2. The material aggregate to have cleanliness value of not less than 82 in accordance with ITD T 72.

3. 70 percent of by weight of the particles retained on the No. 4 sieve shall have one fractured face or more as determined by AASHTO T-335.

E. Mix Design:

The components and materials shall be within the following limits.

Component Material Limit

Residual Asphalt 10 - 16% (Based on dry weight of aggregate)

Mineral Filler 0.5 – 2.0% (Based on dry weight of aggregate)

Additives As needed Water As needed to achieve proposed mix consistency

1. Rate of application: The slurry seal mixture shall be of proper consistency at all times so as to provide the application rate required by the surface condition. Suggested application rate shall be 8 -12 lb/sq yd.

F. PAVEMENT PAINTING

1. Paint to be waterborne with volatile organic compound (VOC) less than 150 g/L.

2. Paint to conform to either the current ITD Waterborne Traffic Line Paint Specifications (Formula No. 14) or to Federal Specification TT-P-1952-D.

3. Federal Standard Colors:

(a) White 37875: parking isles, stop bars, arrows, no parking zones, fog line, handicapped logo

(b) Yellow 33538: centerline, safety boundaries

(c) Blue 15080: handicapped logo background

4. Glass beads: AASHTO Type I beads.

PART 3 – EXECUTION

A. GENERAL

1. Complete all work in each section as indicated by the individual sheet before moving onto the next section. Refer to the Drawings.

2. Work to comply with Idaho Standards for Public Works Construction (ISPWC).

B. CONSTRUCTION LIMITATIONS

1. Do not apply asphalt when roadway surface or weather conditions would prevent satisfactory construction.

2. Weather Limitations: Do not place the slurry seal when the air temperature is below 50℉ and falling but may be applied when both pavement and air temperatures are above 45℉ and rising. No slurry seal shall be applied when there is danger that the finished product will freeze before 24 hours.

3. Do not place seal coat when pavement temperatures exceed 140°F.

4. Do not seal coat when wind velocity exceeds 15 mph.

5. If required, temporary stockpiles to be placed in approved locations.

C. SCHEDULING

1. Prior to moving to next scheduled area of work, contractor to notify COR to confirm work is complete and ready to accept traffic.

D. EQUIPMENT

1. Mixing Equipment

The machine shall be specifically designed and manufactured to lay slurry seal.

The material shall be mixed by a self-propelled, slurry seal mixing machine of either truck-mounted or continuous-run design.

2. Proportioning Devices

Individual volume or weight controls for proportioning each material to be added to the mix (i.e. aggregate, mineral filler, emulsified asphalt and additive) shall be provided and properly marked.

3. Spreading Equipment The mixture shall be spread uniformly by means of a conventional surfacing spreader box attached to the mixer and equipped to agitate and spread the material evenly throughout the box. A front seal shall be provided to insure no loss of the mixture at the road contact point. The rear seal shall act as final strike-off and shall be adjustable. The spreader box and rear strikeoff shall be so designed and operated that a uniform consistency is achieved to produce a free flow of material to the rear strike-off. The spreader box shall have suitable means provided to side shift the box to compensate for variations in the pavement geometry. A burlap drag or other approved screed may be attached to the rear of the spreader box to provide a uniform, highly textured mat.

E. APPLICATION

1. Clean surfaces with powered vacuum sweeper and high-pressure water as required to meet conditions. Do not begin applying asphalt until surface is completely dry and has been approved by Engineer.

2. Apply crack seal to surface in preparation for asphalt application.

3. Protect all drains and expansion joints from binder application.

4. Correct any skipped of deficient areas.

5. Protect all utilities and utility covers by covering with building paper prior to spreading asphalt.

6. Provide Traffic Control to prevent “tracking” of asphalt.

7. The slurry seal shall be of the desired consistency upon leaving the mixer. A sufficient amount of material shall be carried in all parts of the spreader at all times so that a complete coverage is obtained. Overloading of the spreader shall be avoided.

8. No lumping, balling, or unmixed aggregate shall be permitted.

9. No streaks, such as those caused by oversized aggregate, shall be left in the finished surface.

F. HANDWORK

1. Areas which cannot be reached with slurry seal machines shall be surfaced using hand squeegees to provide complete and uniform coverage. The area to be handworked shall be lightly dampened prior to mix placement and the slurry worked immediately.

2. Care shall be exercised to leave no unsightly appearance from handwork. The same type finish as applied by the spreader box shall be required. Handwork shall be completed during the machine applying process.

G. LINES

1. Care shall be taken to measure straight lines along curbs and shoulders. No run-off on these areas will be permitted. Lines at intersections will be kept straight to provide good appearance.

H. ROLLING

1. Parking areas should be rolled by a self-propelled, 10-ton pneumatic roller with a tire pressure of 50 PSI (3.4 ATMS), equipped with a water spray system. The surfaced areas shall be subjected to a minimum of two (2) full coverage passes by the roller.

2. Rolling should not commence until the slurry has cured enough so that it will not pick up on the tires of the roller.

I. PAVEMENT MARKING

1. Use airless spray-type marking equipment, compatible with waterborne paint, and capable of providing a uniform wet film thickness of 15 ± 2 mils.

2. Prior to application pavement cure time minimum of 7 days.

3. Pavement surface must be clean and thoroughly dry.

4. Ambient air temperature must be above 50°F.

5. Paint stripes to be uniform and free of erratic waves.

6. Width and location of marking to be designated in the Contract Documents.

7. Apply paint in accordance with the manufacturer's recommendations.

8. Mix paint thoroughly prior to application.

9. Do not thin paint.

10. Apply paint at a rate of not more than 100 square feet/gallon.

11. Apply glass beads during or immediately following the application of paint in such a manner as to provide good adhesion and reflection.

12. Apply glass beads at a rate of 6 pounds/gallon.

13. All pavement marking to conform to the MUTCD.

14. Provide minimum 2 hour dry time before allowing traffic to enter.

J. CLEAN UP

1. The contractor shall remove any debris associated with the performance of the work on a daily basis.