This document provides questions and answers regarding Amendment 05 to Solicitation 1333ND23QNB680262. The National Institute of Standards and Technology (NIST) requires the replacement of two aging manlift/work platforms at their Gaithersburg, Maryland campus. The amendment provides details on floor to ceiling heights, maximum platform heights needed, allowable use of additional lab space, and column dimensions for the two lift rooms. For Lift 1, the ceiling height is 19 feet and 87 inches of additional lab space can be used. Column dimensions for both rooms are also specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 05 to Solicitation# 1333ND23QNB680262 May 31, 2023

The purpose of this amendment is provide the following questions (Q) and answers (A):

Q1. Floor to Ceiling Height?

A1. 19 feet for Lift 1; 25 feet for Lift 2

Q2. What is the Highest point you need to reach on your dead weight equipment (floor to highest point)?

A2. Reference SOW Lift 1B Illustration: Travel heights of the platform heights are listed and will give us what working height we require. (The travel distance is the height the platform must raise from the resting position, total height will be resting height + travel height) Reference Lift 2B SOW Illustration: Travel heights of the platform heights are listed and will give us what working height we require. (The travel distance is the height the platform must raise from the resting position, total height will be resting height + travel height)

Q3. We asked about using some of the additional lab space behind the lift before, but how much of that space can we use? Can we go to 87”?

A3. Reference Amendment 03 Q1 and A1. That would still be OK in this case (for Lift 1A)

Q4. Column Dimensions for BOTH ROOMS Back Wall to Column Column to Column Wall to Column (both sides) Interior Column to Column A4. Column Dimensions for BOTH ROOMS: Lift 1 Room: 18” Square; Lift 2 Room: 20” Square Back Wall to Column: Lift 1 Room: 132”; Lift 2 Room: 124” Column to Column: Lift 1 Room: 24”; Lift 2 Room: 32” Wall to Column (both sides): Lift 1 Room: Left wall to column: 103”, Right wall to column: 95”;

Lift 2 Room: Left wall to column: 77”, Right wall to column: 72”;

Interior Column to Column: Lift 1 Room: 98”; Lift 2 Room: 143”