Amend__3.pdf

PDF 124 KB Posted

Attached to
Colusa Sewer Project
Solicitation number
13-235-SOL-00013
Issued by

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amend__2.pdf PDF
Amend__1.pdf PDF
Attach_5_SF_24.pdf PDF
Attach_6_SF_25.pdf PDF
Attach_1_Davis_Bacon.pdf PDF
13-235-SOL-00013.pdf PDF
Attach_7_SF_25A.pdf PDF
Attach_2_Goals.pdf PDF
Attach_3_Submittals.pdf PDF
SF_1442.pdf PDF
Attach_4_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

13-235-SOL-00013

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95814 650 Capitol Mall, Suite 7-100 John E Moss Federal Bldg California Office of the Director

CA 11-E1607/16/2013000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/16/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT PROVIDES FOLLOWING INFORMATION:

1. REVISED BID SCHEDULE 08-15-13

REVISED DIAMETER FOR ITEM #8

REVISED QUANTITY FOR ITEM #17

2. QUESTIONS & ANSWERS THAT HAVE BEEN ASKED AFTER THE ORGANIZED SITE VISIT

3. THE BID DUE DATE HAS BEEN EXTENED TO 2:00 P.M. AUGUST 21 TO ALLOW TIME FOR CONTRACTORS TO MAKE

ADJUSTMENTS TO THEIR BIDS.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

HARRY J. WEISS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Electronically Signed 08/15/2013

Colusa Community Sewer Collection System Improvements IHS Project CA 11-E16

Bid Schedule (REVSIED 08-15-13)

The following Bid Schedule is based on estimated quantities required to meet the specifications.

The total extended prices shall be used for bid evaluation purposes only. The actual amount to be paid by the Government under the contract shall be computed on the actual quantities installed at the unit bid prices awarded.

Item Item Description UNIT QTY

UNIT

PRICE

TOTAL

PRICE

1 Mobilization and Demobilization LS 1

Section 02100

2 Dewatering Wells EA 5

Section 02241

3 Dewatering Pump System HR 480

Section 02241

4 Erosion and Sediment Control LS 1

Section 02370

5 Sewer Service Line Pipe and Fittings LF 2100

Section 02538

6 Two-Way Service Line Cleanouts EA 26

7 Service Connection EA 26

8 1 1/2" HDPE Low Pressure Sewer Main and Fittings LF 930

Section 02539

9 Grinder Pump Station EA 4

10 Spare Grinder Pump Core EA 2

11 1 1/4" Low Pressure System Service Line LF 343

12 Low Pressure System Lateral Assembly EA 4

13 Low Pressure System Terminal Flushing Assembly EA 1

14 Septic Tank Abandonment EA 26

Section 02540

15 Sanitary Sewer Main LF 3408

Section 02730

16 Sewer Main Cleanout EA 1

Section 02730

17 Manholes and Covers EA 14

Section 02731

18 Lift Station EA 1

Section 02732

19 4" HDPE Sewer Force Main Pipe and Fittings LF 1790

Section 02734

20 Sewer Force Main Cleanouts EA 3

Section 02734

21 Saw-Cutting Asphaltic Pavement LF 30

Section 02740

22 Asphalt Pavement and Curbing CY 1.5

Section 02740

23 Chain Link Fencing and Gates LF 86

Section 02830

24 Electrical Service LS 1

Section 16100

TOTAL

Questions & Answers

1. In Section 02200, 3.9 “Trench Backfilling” can we assume that the materials that we excavate will be deemed to “suitable”?

It can be assumed for backfilling but not for pipe bedding or pipe embedment.

2. We got the logs and I see the location for the first page is Sedeo Circle. Where is the location of the “Wastewater Monitoring Well”?

The location of the well near Sedeo Circle is close to house #5 and the location of the Wastewater Monitoring well is within 200’ of the fence on the east side of the Wastewater Treatment Plant.

3. What is the operating point for the lift station?

The operating point for the lift station pump is 130 gpm @ 55’ feet of head. This is for Section 02732.

4. On the grinder pumps, the detail on C503 , #3 shows mounting the Eone Sentry of the wall of the house. Who brings the power to this point?

The contractor is responsible to bring the power to this point.

5. Bid Item 17 has 18 for the quantity of manholes, but I can only find 14.

The actual quantity for the Manholes and Covers item is 14 Each (not 18 as listed on the bid form). This item has been revised on the Bid Schedule.

6. I want to verify that Bid Item 8 is to be 930’ of 2’’HDPE as Sheet C104 calls out 1 ½’’.

The diameter of the HDPE pipe listed on the drawings at 1 ½ inches is correct. The bid form item listing the diameter as 2-inches is not correct. This item has been revised on the Bid Schedule.

7. Drawing C501 , #4 shows a new electric meter with a ½ conduit feeding it. We have 2’’ coming in from the treatment plant and I would think it should be stubbing into a disconnect. It seems that there would already be a meter at the treatment plant.

Even though there is an existing meter a the treatment plant, the design is to have one at the lift station also. The detail showing an electrical meter is correct.

Amend #3