Amend__2.pdf

PDF 119 KB Posted

Attached to
Colusa Sewer Project
Solicitation number
13-235-SOL-00013
Issued by

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amend__3.pdf PDF
Amend__1.pdf PDF
Attach_5_SF_24.pdf PDF
Attach_6_SF_25.pdf PDF
Attach_1_Davis_Bacon.pdf PDF
13-235-SOL-00013.pdf PDF
Attach_7_SF_25A.pdf PDF
Attach_2_Goals.pdf PDF
Attach_3_Submittals.pdf PDF
SF_1442.pdf PDF
Attach_4_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

13-235-SOL-00013

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95814 650 Capitol Mall, Suite 7-100 John E Moss Federal Bldg California Office of the Director

CA 11-E1607/16/2013000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/16/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT PROVIDES THE WELL DATA FROM THE MONITORING WELLS.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

HARRY J. WEISS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Electronically Signed 08/09/2013

Date

Depth of Water Below Reference

Point (FT)

Reference Point

Elevation Elevation of

Water Surface Jan-12 14.9 57.84 42.94 Feb-12 14.63 57.84 43.21 Mar-12 57.84 Apr-12 57.84 May-12 57.84 Jun-12 17.42 57.84 40.42 Jul-12 20.8 57.84 37.04

Aug-12 21.16 57.84 36.68 Sep-12 19.74 57.84 38.1 Oct-12 19.37 57.84 38.47 Nov-12 18.38 57.84 39.46 Dec-12 16.44 57.84 41.4 Jan-13 14.09 57.84 43.75 Feb-13 12.94 57.84 44.9 Mar-13 12.55 57.84 45.29 Apr-13 12.28 57.84 45.56 May-13 57.84 Jun-13 57.84 Jul-13 19.82 57.84 38.02

Aug-13 20.84 57.84 37

Sedeo Circle Monitoring Well

Date

Depth of Water Below Reference

Point (FT)

Reference Point

Elevation Elevation of

Water Surface Jan-12 58.52 Feb-12 58.52 Mar-12 58.52 Apr-12 12.54 58.52 45.98 May-12 12.44 58.52 46.08 Jun-12 15.67 58.52 42.85 Jul-12 17.07 58.52 41.45

Aug-12 17.64 58.52 40.88 Sep-12 17.44 58.52 41.08 Oct-12 17.08 58.52 41.44 Nov-12 16.62 58.52 41.9 Dec-12 14.65 58.52 43.87 Jan-13 12.28 58.52 46.24 Feb-13 12.1 58.52 46.42 Mar-13 12.57 58.52 45.95 Apr-13 12.64 58.52 45.88 May-13 14.17 58.52 44.35 Jun-13 15.3 58.52 43.22 Jul-13 17.2 58.52 41.32

Aug-13 17.73 58.52 40.79

Wastewater Monitoring Well

Amend #2
Amend #2 Information
Sheet1

File details come from the government source that posted it. Updated .