Amendment_0004_11-6.pdf

PDF 311 KB Posted

Attached to
Dry Dock Repairs NOAA Ship Reuben Lasker
Solicitation number
1305M220QNMAN0010
Issued by

About this file

Please see attached.

View the file

Other files

File Type Posted
Amendment 009 Solicitation.pdf PDF
Attachment I - RLFY20DDSOW Revision 2.pdf PDF
Amendment 0009.pdf PDF
Amendment 8.pdf PDF
Q&A5.docx DOCX document
Attachment I - RLFY20DDSOW Revised.pdf PDF
Attachment III Past Performance Questionnaire.docx DOCX document
Attachment II Past Performance Information Form.rtf RTF text file
Amendment 7.pdf PDF
A0006.pdf PDF
FSV6-437-04 Rev A.pdf PDF
Attachment IV - Price Schedule RL Revised.xlsx XLSX spreadsheet
Laundry Space Photo 3.jpg JPG image
Laundry Space Photo 1.jpg JPG image
Amendment 005.pdf PDF
FSV6-651-01_1-3_Rev B.pdf PDF
Laundry Space Photo 2.jpg JPG image
Laundry Space Photo 5.jpg JPG image
Laundry Space Photo 4.jpg JPG image
256-01-00003-010 Rev_-_ Heat Exchanger.pdf PDF
FSV6-581-01_B.pdf PDF
533-1_Potable_Water_Tank_Disinfection.pdf PDF
FRV40-226-006-010_Rev_A__SternTubeBearing_and_Shaft_Seal.pdf PDF
Amendment_0003_11-5.pdf PDF
1305M220QNMAN0010_Amend_2.pdf PDF
1305M220QNMAN0010_Amend_1.pdf PDF
Lasker_Reference_Drawings_Zip_File.zip ZIP file
Attachment_III_Past_Performance_Questionnaire.docx DOCX document
Attachment_VI_-_Subcontracting_Plan_Outline.doc DOC document
Attachment_I_-_RLFY20DDSOWr4.pdf PDF
1305M220QNMAN0010.pdf PDF
Attachment_V_-_Deliverables.pdf PDF
Attachment_II_Past_Performance_Information_Form.rtf RTF text file
Attachment_IV_-_Price_Schedule_RL.xlsx XLSX spreadsheet
SYNOPSIS_-_FY20_LASKER_DD.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

NOAA Ship Reuben Lasker 1305M220QNMAN0010

NOAA Acquisition and Grants Office (AGO) Eastern Region Acquisition Division

RFQ #1305M220QNMAN0010

QUESTIONS

1. QUESTION: Item 10115 Tank Preservation. Can you provide a list of tanks that are to be preserved?

ANSWER: Tanks subject to paint touch-up are listed in item #10103, section 6.5, which includes tank details and a diagram identifying the tank locations.

Voids will not be painted.

2. QUESTION: Can you send NOAA Standard Spec S-533-1

Potable Water Tank Disinfection?

ANSWER: AMC-533-1 replaces S-533-1 and is now posted to FBO.

3. QUESTION: Item 10101 ROUTINE DRYDOCKING - 1)Could NOAA provide a specific list of the services required during drydocking (para 4.3, “service lines shall be provided and hooked up” 2).There is no specific reference to hook-up and disconnect of temporary services while pier side, before and after drydocking. What does NOAA intend?

ANSWER: Detailed requirements are listed for pier-side and dry dock in SOW item 10122.

4. QUESTION: Item 10102 UNDERWATER BODY INSPECTIONS & REPAIRS - We are under the impression that NOAA will be contracting directly with ABS for their services. If this is the case, in paragraph 4.8.1, is the contractor to coordinate the inspections performed by the NOAA contracted ABS representative?

ANSWER: NOAA will pay all ABS cost associated with the required inspections. The vendor is responsible for scheduling the inspections based on the production schedule and accessibility of inspection items. The vendor is responsible for ABS cost associated with any required inspections other than the inspections listed in item 10102.

NOAA Ship Reuben Lasker 1305M220QNMAN0010

5. QUESTION: Item 10113 FREEBOARD PRESERVATION - Inspection from the pier and close inspection after high pressure water washing may reveal different degrees of required mechanical surface preparation. Can NOAA specify the percentage of freeboard coatings that will require mechanical preparation (i.e.: 5%, 10% or 15%)?

ANSWER: Assume 10% of the freeboard will require mechanical preparation where the coating system has failed or shows signs of rust.

6. QUESTION: 10115 TANK PRESERVATION - Can NOAA provide bidders details regarding the current coatings in each tank to be preserved (mfg., product name, coating millage).

Aswer: Reference Drawing FSV6-631-01 Rev B – Paint Schedule lists the coating materials used throughout the ship. Millages were applied per manufacturer requirements. NOTE - The item specifies the paint system to be used for touch-up painting

7. 10110 GROUND TACKLE - Can you provide the reference document listed for 2.3?

See Attached Drawing FSV6-581-01 B

Amendment 0004
SF30

Q&A2

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0004
Code[0]: AJ930073
Code[1]:
AccountingData[0]: N/A
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Ashley Perry, Contracting Officer
Description[0]: Dry Dock Repairs for NOAA Ship Reuben Lasker

This amendment hereby updates the following items.

1. Attaches Drawing FSV6-581-01_B

2. Addresses Q&A 3-7 to the solicitation

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/ERAD

200 GRANBY STREET

NORFOLK, VA 23510

NameandAddress[0]:
AdministeredBy[0]: See Block 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 1305M220QNMAN0010
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 3
EffectiveDate[0]: 11/6/2019
Dated9B[0]: 10/30/2019
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it.