Attachment_IV_-_Price_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- NOAA Ship Bell M. Shimada Drydock Repairs Federal contract opportunity
- Solicitation number
- 1305M219QNMAN0237
About this file
Attachment IV - Price Schedule
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | |||||||
| BASE ITEMS | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 10000 | 19900 | ABS Survey | 1 | JB | |||
| 10000 | 19920 | Temporay Services | 1 | JB | |||
| 10000 | 19970 | Drydock and Berthage | 1 | JB | |||
| 10000 | 16310 | Underwater Hull Preservation | 1 | JB | |||
| 10000 | 16311 | Hull Freeboard Preservation | 1 | JB | |||
| 10000 | 16312 | Tank Preservation | 1 | JB | |||
| 10000 | 16313 | MMR Intake Trunk Preservation | 1 | JB | |||
| 10000 | 16314 | Main Mast Preservation | 1 | JB | |||
| 10000 | 16315 | Deck Preservation | 1 | JB | |||
| 10000 | 16316 | Bow Thruster and Oceanographic Winch Room Bilge Deck Preservation | 1 | JB | |||
| 10000 | 16317 | Deckhouse and Stack Preservation | 1 | JB | |||
| 10000 | 12430 | Propellor and Shaft Inspection | 1 | JB | |||
| 10000 | 12431 | Line Cutter Installation and Rope Guard Modifications | 1 | JB | |||
| 10000 | 12560 | Sea Valves | 1 | JB | |||
| 10000 | 13240 | Swithcboard and Transformer Cleaning | 1 | JB | |||
| 10000 | 13241 | Circuit Breaker Overhaul | 1 | JB | |||
| 10000 | 14050 | Topside Antenna Inspection and Maintenance: Mast Scaffolding | 1 | JB | |||
| 10000 | 15680 | Bow Thruster Inspecftion | 1 | JB | |||
| 10000 | 16330 | Cathodic Protection System Inspection | 1 | JB | |||
| 10000 | 16331 | Cathelco System Anodes | 1 | JB | |||
| 10000 | 16340 | Stateroom Carpeting Sanitizing and Cleaning | 1 | JB | |||
| 10000 | 15810 | Anchors and Chain | 1 | JB | |||
| 10000 | 15050 | Piping Repairs and Modifications | 1 | JB | |||
| 10000 | 15550 | Fire Inspection and Hydrostatic Testing | 1 | JB | |||
| 10000 | 15830 | Annual Life Raft Inspection | 1 | JB | |||
| 10000 | 15831 | FRB Davit Inspection and Service | 1 | JB | |||
| 10000 | 15510 | Pressure Vessel Inspections | 1 | JB | |||
| 10000 | 15040 | Fuel Oil Tank Level Indicator Replacement | 1 | JB | |||
| 10000 | 15050 | Expansion Joint and Flex Hose Replacement | 1 | JB | |||
| 10000 | 15560 | Hydraulic Hose Replacement | 1 | JB | |||
| 10000 | 15910 | Trawl Ramp Platform Support Modifications | 1 | JB | |||
| 10000 | 15930 | MSD Maintenance and Repair | 1 | JB | |||
| 10000 | 15060 | Tank Vent Pipe Inspection | 1 | JB | |||
| 20000 | 21020 | Centerboard Overhaul | 1 | JB | |||
| 20000 | 25051 | Butterfly Valve Replacement | 1 | JB | |||
| 20000 | 25560 | MSW Strainer Isolation Valve Replacement | 1 | JB | |||
| 20000 | 25330 | Potable Water Heater Replacement | 1 | JB | |||
| 20000 | 25510 | Compressed Air System Dryer Installation | 1 | JB | |||
| 20000 | 25830 | Fast Rescue Boat (FRB) Overhaul | 1 | JB | |||
| 20000 | 25561 | Hydrographic Winch Overhauls | 1 | JB | |||
| 20000 | 26510 | Galley and Storage Modifications | 1 | JB | |||
| 20000 | 25030 | Pump Overhauls | 1 | JB | |||
| 20000 | 25320 | AMOT Valve System Overhaul | 1 | JB | |||
| 20000 | 23020 | MMR Supply Fan Overhauls | 1 | JB | |||
| 20000 | 23100 | SSDG Generator Overhauls | 1 | JB | |||
| Total Base Items | $0.00 | ||||||
| ADDITIONAL ITEMS - GROWTH | |||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 30000/40000 | 30000/ | ||||||
| 40000 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 4,500 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 4,500 | |
| 30000/40000 | 30000/ | |
| 40000 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $200,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$200,000.00 X percentage quoted]: $______________
| % | EST. $200,000.00 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1372.271-89 | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 50000 | 55910 | Hydrographic Winch Wire Maintenance | 1 | JB | ||
| 60000 | 61670 | Quick Acting Watertight Doors | ||||
| (QAWTD) 1-65-2 and 1-46-1 Renewal | 1 | JB | ||||
| 60000 | 61671 | Weather-tight Pilothouse Doors | 1 | JB | ||
| 60000 | 66400 | Chemistry Lab Countertops | 1 | JB | ||
| 60000 | 60730 | SSDG Resilient Mount Replacement | 1 | JB | ||
| 60000 | 65560 | Mission HPU Pipe Installation | 1 | JB | ||
| Total Options | $0.00 |
| BASE | $0.00 |
| BASE + GROWTH | $0.00 |
| BASE+GROWTH+OPTIONS | $0.00 |