2017-11-8_LEED_Checklist_Payson.pdf
PDF 81 KB Posted
- Attached to
- Payson Ranger Station
- Solicitation number
- 12-94TZ-18-R-0002
About this file
LEED Scorecard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarifying_Questions_Response_5.22.18.xlsx | XLSX spreadsheet | |
| 1294TZ18R0002_Amendment_0003_5.22.18.pdf | ||
| Responses_to_Questions_5.16.18.xlsx | XLSX spreadsheet | |
| Sheet_A0.3.pdf | ||
| Sheet_A7.2.pdf | ||
| 104423_Signage.pdf | ||
| 2018-05-15_Revised_G1_2.pdf | ||
| 1294TZ18R0002_Amendment_0002_5.16.18.pdf | ||
| 1294TZ18R0002_5.11.18.pdf | ||
| 1294TZ18R0002_Amendment_0001_5.11.18.pdf | ||
| Payson_Ranger_Station_Site_Visit_Sign_In_(5.1.18).pdf | ||
| Past_Performance_Questionnaire_Attch_H_4.25.18.pdf | ||
| Question_Template_Attch_G.xlsx | XLSX spreadsheet | |
| Addendum_1.zip | ZIP file | |
| 1294TZ18R0002_4.18.18.pdf | ||
| 1294TZ18R0002_4.16.18.pdf | ||
| 1294TZ18R0002_4.13.18.pdf | ||
| Attachments_A-H.zip | ZIP file |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED v4 for BD+C: New Construction and Major Renovation Project Checklist Payson Ranger Station
CD 11.8.17
Y ? N
1 Credit 1
4 5 7 16 9 2 2 13 Credit 16 Y Prereq Required
1 Credit 1 Y Prereq Required 2 Credit 2 3 2 Credit 5
2 3 Credit 5 2 Credit 2
5 Credit 5 1 1 Credit 2 1 Credit 1 1 1 Credit Building Product Disclosure and Optimization - Material Ingredients 2
1 Credit 1 2 Credit 2 1 Credit Green Vehicles 1
12 4 0 Indoor Environmental Quality 16 8 2 0 10 Y Prereq Required
Y Prereq Required Y Prereq Required
1 Credit 1 2 Credit 2 2 Credit 2 3 Credit 3 1 Credit 1 1 Credit Construction Indoor Air Quality Management Plan 1 3 Credit 3 2 Credit 2
2 Credit 2 1 Credit 1 1 Credit 1 2 Credit 2
3 Credit 3 5 4 2 11 1 Credit 1 Y Prereq Required 1 Credit 1 Y Prereq Required Y Prereq Building-Level Water Metering Required 2 0 0 Innovation 6 2 Credit 2 1 Credit 5 3 3 Credit 6 1 Credit 1
2 Credit 2 1 Credit Water Metering 1 1 3 0 Regional Priority 4
1 Credit Outdoor Water Use Reduction 1 10 17 0 33 1 Credit Heat Island Reduction 1 Y Prereq Required 1 Credit Optimize Energy 1 Y Prereq Required 1 Credit Renewable Energy 1 Y Prereq Required Y Prereq Required 52 37 11 TOTALS Possible Points: 110
Credit 6 9 9 Credit 18
1 Credit 1 2 Credit 2 3 Credit 3
1 Credit 1 2 Credit 2
Acoustic Performance Quality Views
Enhanced Indoor Air Quality Strategies Low-Emitting Materials
Indoor Air Quality Assessment Thermal Comfort
Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Access to Quality Transit
Reduced Parking Footprint
Open Space
Site Assessment
Interior Lighting Daylight
LEED Accredited Professional Mercury Reduction in Lights
Rainwater Management
Light Pollution Reduction
Environmental Tobacco Smoke Control
Energy and Atmosphere
Minimum Energy Performance
Fundamental Refrigerant Management
Cooling Tower Water Use
Green Power and Carbon Offsets
Heat Island Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Enhanced Commissioning
Building-Level Energy Metering
Water Efficiency
Fundamental Commissioning and Verification
Demand Response Renewable Energy Production Enhanced Refrigerant Management
Optimize Energy Performance Advanced Energy Metering
Construction Activity Pollution Prevention
High Priority Site
Surrounding Density and Diverse Uses
Sustainable Sites
Building Life-Cycle Impact Reduction
Site Development - Protect or Restore Habitat
Building Product Disclosure and Optimization - Sourcing of Raw Materials
Project Name:
Date:
Location and Transportation
Sensitive Land Protection LEED for Neighborhood Development Location
Bicycle Facilities
Construction and Demolition Waste Management Planning
Materials and Resources Storage and Collection of Recyclables
Construction and Demolition Waste Management
Minimum Indoor Air Quality Performance
Building Product Disclosure and Optimization - Environmental Product Declarations
Integrative Process
File details come from the government source that posted it.