Attachment_1_-_Final_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Bathroom Remodel Federal contract opportunity
- Solicitation number
- 1282D718R0002
About this file
Attach 1 - Final Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282D718R0002_-_Bid_Form_Only.pdf | ||
| Attachment_5_-_As_Build_Drawings.pdf | ||
| 1282D718R0002_-_Aspen_Bunkhouse_Bathroom_Remodel.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_7_-_Experience_Questionaire.docx | DOCX document | |
| Attachment_6_-_Plumbing_Specs.pdf | ||
| Attachment_2_-_Final_Product_Specs.pdf | ||
| Attachment_3_-_Final_FFE_Schedule.pdf | ||
| Attachment_5_-_As_Build_Drawings.pdf | ||
| 1282D718R0002_-_Aspen_Bunkhouse_Bathroom_Remodel.pdf | ||
| 1282D718R0002_-_Bid_Form_Only.pdf | ||
| Attachment_3_-_Draft_FFE_Schedule.xlsx | XLSX spreadsheet | |
| Experience_Questionnaire.docx | DOCX document | |
| Attachment_2_-_Draft_Product_Specs.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_1_-_Draft_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: Electrical configuration shown is approximate only - Refer to 1981 As Constructed Drawings for Electrical/Mechanical Configuration
GENERAL NOTES,
1. REFER TO FOREST SERVICE 61D INSTRUCTIONS FOR GOVERl'IMENT PROVIDED FURNISI-IING, FIXTURE AND EQUIPMENT SPECIFICATIONS AND SUFFLIER REQUIREMENTS.
2. ALL DIMENSIONS ARE FROM FINISI-IED TO FINISI-IED SURFACE .
.3. INSTALL i" GYPSUM WALL 6OARD AT ALL DEMOLISI-IED CEILING LOCATIONS, AS REQUIRED.
4. REFER TO EXISTING 1<381 AS-6UIL T CONSTRUCTION DOCUMENTS FOR ELECTRICAL, FLUM61NG
AND MECI-IANICAL INFORMATION. COORDINATE AS NECESSARY TO USE EXISTING LINES,
DUCTING, ETC. AND MEET ALL AFFLICA6LE LOCAL CODES.
MEN'5
6ATI-IROOM
11011
EXTG CLG I-IT =
1'-11Z' 11 AFF,
FIELD VERIFY
CD!=NLARGED REFLECTING CEILING FINl5!-IE5 PLAN
SCALE: ! 11 = 1 1 -0 11
--- PROVIDE NECESSARY FOWER FOR NEW
WALL I-IAND DRYER FER MFR
__.-- NEW GFI RECEFT ACLE DEVICES AND
COVERS IN WI-IITE AT LOCATIONS SI-IOWN
__.-- EXISTING I-IVAC SUFFL Y GRILLE TO
REMAIN, FIELD VERIFY
---NEW LED CEILING MOUNTED LIGI-IT FIXTURES,
RE, FFE SCI-IEDULE FOR SFEC, ELECTRICAL
MODIFICATIONS REQUIRED
--- NEW SWITCI-I DEVICES AND COVERS IN
WI-IITE, TYFICAL, ELECTRICAL
MODIFICATIONS REQUIRED
�-REFERENCE FFE SCI-IEDULE FOR CEILING
FINISI-I/TEXTURE AND FAINT TI-IROUGI-IOUT
ALL AREAS
__.-- DASI-IED ITEMS DENOTE EXISTING
FINISI-IES AND FRAMING TO 6E REMOVED
---Heater/fan/light - Gov Furnished
Re-ROUTE VENT DUCTING TI-IROUGI-I EXISTING see 1981 as constructed drawings
REVISION
41 DATE
�VISION'!
1.101.02
ISSUE DATE,
IZ>2.1�.18
GENERAL NOTES,
1. REFER TO FOREST SERVICE 61D INSTRUCTIONS FOR GOVERl'IMENT PROVIDED FURNISI-IING, FIXTURE AND EQUIPMENT SPECIFICATIONS AND SUFFLIER REQUIREMENTS.
2. ALL DIMENSIONS ARE FROM FINISI-IED TO FINISI-IED SURFACE .
.3. INSTALL i" GYPSUM WALL 6OARD AT ALL DEMOLISI-IED CEILING LOCATIONS, AS REQUIRED.
4. REFER TO EXISTING 1<381 AS-6UIL T CONSTRUCTION DOCUMENTS FOR ELECTRICAL, FLUM61NG
AND MECI-IANICAL INFORMATION. COORDINATE AS NECESSARY TO USE EXISTING LINES,
DUCTING, ETC. AND MEET ALL AFFLICA6LE LOCAL CODES.
_______ J
I I I I I I I I I
_______ J
-------7
_J J w
EQ
_J J w
I
I I
EQ
WOMEN'S
6ATI-IROOM
1 2e>1 1
EXTG CLG I-IT =
1'-11Z> 11 AFF,
FIELD VERIFY
_J J w EQ
_J J w
EQ
EQ
CD!=NLARGED REFLECTING CEILING FINl5!-IE5 PLAN
SCALE: ! 11 = 1 1 -0 11
--- PROVIDE NECESSARY FOWER FOR NEW
WALL I-IAND DRYER FER MFR
__..--NEW GFI RECEFT ACLE DEVICES AND
COVERS IN WI-IITE AT LOCATIONS SI-IOWN
__..--EXISTING I-IVAC SUFFL Y GRILLE TO
REMAIN, FIELD VERIFY
--- NEW LED CEILING MOUNTED LIGI-IT FIXTURES,
RE: FFE SCI-IEDULE FOR SFEC, ELECTRICAL
MODIFICATIONS REQUIRED
__..--NEW SWITCI-I DEVICES AND COVERS IN
WI-IITE, TYFICAL, ELECTRICAL
MODIFICATIONS REQUIRED
--- DASI-IED ITEMS DENOTE EXISTING
FINISI-IES AND FRAMING TO 6E REMOVED
--- Heater/Fan/Light Gov Furnished
---REFERENCE FFE SCI-IEDULE FOR CEILING
FINISI-I/TEXTURE AND FAINT TI-IROUGI-IOUT
ALL AREAS
_..--Re-route vent ducting - see 1981 As Constructed
Drawings - two exhaust fan ducts through roof -
REVISION
41 DATE
I 02.1':l.16
FINAL
1.212)1.12)2
ISSUE DATE,
IZ>2£l6.18
Note: Third exhaust fan in
Toilet Room Deleted -light will be installed
| Aspen Bunkhouse_I.10.01_Mens Bathroom |
| Aspen Bunkhouse_I.101.02_Mens Bathroom RCP |
| Aspen Bunkhouse_I.201.01_Womens Bathroom |
| Aspen Bunkhouse_I.201.02_Womens Bathroom |
File details come from the government source that posted it.